36C10B22R0010_FINAL.pdf
PDF 2 MB Posted
- Attached to
- DA10--VetRide Transportation Solution (VA-22-00029434) Federal contract opportunity
- Solicitation number
- 36C10B22R0010
About this file
This request for proposal from the Department of Veterans Affairs Technology Acquisition Center solicits offers for a VetRide Transportation Solution. The solution must provide a scheduling software system hosted in the VA Enterprise Cloud environment along with mobile data computers, administrative portal functionality, veteran self-service capabilities, and data collection and reporting tools. Offers are due by June 7, 2022 and award is expected on June 30, 2022. The North American Industry Classification System code is 541511 with a small business set-aside of $30 million. The contractor must deliver the transportation solution within 30 days of award and provide ongoing maintenance, support, and equipment through base and option years totaling through June 2027.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10B22R0010_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Error! Bookmark not defined.
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. DUNS: DUNS+4:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C10B22R0010 06-02-2022
Luis Lozada-Santiago, Contract Specialist 848-377-5249 06-07-2022
13:00 EDT
Department of Veterans Affairs
Technology Acquisition Center
23 Christopher Way
Eatontown NJ 07724
X 100
X
541511
$30 Million
N/A
See Delivery Schedule
Financial Services Center
PO Box 149971
Austin TX 78714-8971
Title: Veterans Transportation Program, VetRide Hosted Solution
CS: luis.lozada-santiago@va.gov
CO: debra.clayton2@va.gov, 848-377-5174
See section B for list of required services
Debra Clayton
Contracting Officer mailto:luis.lozada-santiago@va.gov mailto:debra.clayton2@va.gov
36C10B22R0010
Table of Contents
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 GOVERNING LAW
B.2 SOFTWARE LICENSE, MAINTENANCE AND TECHN`ICAL SUPPORT
B.3 CONTRACT ADMINISTRATION DATA
B.4 PRICE SCHEDULE
B.5 PERFORMANCE WORK STATEMENT
SECTION C - CONTRACT CLAUSES
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (JUN 2016)
(End of clause)
C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMERCIAL ITEMS (MAY 2022)
C.4 52.217-7 OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE
ITEM (MAR 1989)
C.5 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000).. 150
C.6 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA
ACQUISITION OF COMMERCIAL ITEMS (APR 2020)
C.7 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING – MONITORING AND
COMPLIANCE (JUL 2018) (DEVIATION)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILANCE SERVICES OR
EQUIPMENT (NOV 2021)
E.3 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-
REPRESENTATION (OCT 2020)
E.4 52.209-7 INFORMATION REGARDING RESPNSIBILITY MATTERS (OCT 2018)
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS-
COMMERCIAL ITEMS (NOV 2021)
E.6 52.216-1 TYPE OF CONTRACT (APR 1984)
E.7 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.8 PROPOSAL SUBMISSION INTRUCTIONS
E.9 BASIS FOR AWARD
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. §3901 et seq.), Contracts for Data
Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this Clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this Clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. §
516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be effected by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.2 SOFTWARE LICENSE, MAINTENANCE AND TECHN`ICAL SUPPORT
(1) Definitions.
(a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
(b) Licensor. The term “licensor” shall mean the contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “contractor” is the party identified in Block 17a on the SF1449. If the contractor is a reseller and not the Licensor, the contractor remains responsible for performance under this order.
(c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
(d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
(e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
(f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
(g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version
5.4 to 6).
(2) Software License
(a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software
(b) The Government may use the software in a networked environment.
(c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
(d) All limitations of software usage are expressly stated in the Schedule of
Supplies/Services and the Performance Work Statement/Product Description.
(3) Software Maintenance and Technical Support
(a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this contract or order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received the contractor is neither authorized nor permitted to renew any of the previously furnished services.
(b) The contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims.
(c) Any telephone support provided by contractor shall be at no additional cost.
(d) The contractor shall provide all maintenance services in a timely manner in accordance with the contractor’s customary practice or as defined in the Performance Work Statement/Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the contractor (e.g., www.ppirs.gov).
(e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.
(4) Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5) Manuals and Publications. Upon Government request, the contractor shall furnish the most current version of the user manual and publications for all products/services provided under this contract or order at no cost.
B.3 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C10B
Technology Acquisition Center
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award
Management, or
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Upon receipt of deliverables/services
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of
Payment Requests.
5. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.4 PRICE SCHEDULE
NOTE: Offerors are instructed to complete Section B.4 below and submit with their quote.
Offerors are cautioned that alterations to the line items as specified below will not be accepted and may render quotes unacceptable.
All questions shall be directed to the Contract Specialists, Luis Lozada-Santiago, luis.lozada-santiago@va.gov , (848)-377-4245 and Contracting Officer, Debra Clayton, debra.clayton2@va.gov ,
(848) 377-5174, prior to the closing date and time specified in this Request for Proposals.
Inspection: Destination
Acceptance: Destination Free on Board (FOB): Destination
Base Period: The Period of Performance (PoP) shall be 7/1/2022 – 6/30/2023
CLIN Description Qty
Unit
Unit
Price
Extended
Price
0001 Contractor Project Management in accordance with (IAW) Performance Work Statement (PWS) section 5.1.
This Firm-Fixed Price (FFP)
Contract Line Item Number (CLIN) includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1 inclusive of all of its subparagraphs
1 LT $ $
0001AA Contractor Project Management Plan IAW PWS section 5.1.1
Due within 5 business days of award.
Electronic submission to: VA
PM, COR.
1 EA NSP NSP
0001AB Contractor Kick-Off Meeting Agenda IAW PWS section 5.1.2.
Due within 5 calendar days prior to kickoff meeting.
1 EA NSP NSP
mailto:luis.lozada-santiago@va.gov mailto:luis.lozada-santiago@va.gov mailto:debra.clayton2@va.gov
0001AC Contract Kick-Off Meeting Minutes IAW PWS section 5.1.2.
Due within 3 calendar days after Kick-Off Meeting
PM, COR
1 EA NSP NSP
0001AD Weekly Progress Report in accordance with IAW PWS section 5.1.3
Due within 10 business days of award and weekly thereafter.
1 EA NSP NSP
0002 VetRide Scheduling Software System subscription IAW PWS section 5.2, 5.3.4, 5.3.5, 5.3.6, 5.3.7, 5.3.8, 5.14
Due 30 days after contract award.
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.2 inclusive of all of its subparagraphs.
12 MO $ $
0003 Administrative Portal IAW PWS section 5.3 award deliverables required for the successful completion of the
1 LT $ $
services detailed in PWS section 5.3 inclusive of all of its subparagraphs.
0003AA Configuration Management Plan IAW PWS section 5.3.3
Due 30 Days after Contract Award
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AB Incident Response Plan IAW PWS section 5.3.3
Due 30 Days after Contract
Award
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AC Disaster Recovery Plan IAW PWS section 5.3.3
1 EA NSP NSP
0003AD Contingency Plan IAW PWS section 5.3.3
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AE Privacy Impact Assessment
IAW PWS section 5.3.3
1 EA NSP NSP
0003AF Privacy Threshold Analysis IAW PWS section 5.3.3
1 EA NSP NSP
Award
Electronic submission to: VA
PM, COR
0003AG Plan of Action and Milestones
IAW PWS section 5.3.3
1 EA NSP NSP
0003AH Access Control Policy and Procedures IAW PWS section
5.3.3
1 EA NSP NSP
0003AJ Audit Control Policy and Procedures IAW PWS section 5.3.3
1 EA NSP NSP
0003AK Identification and Authentication Control Policy and Procedures IAW PWS section 5.3.3
1 EA NSP NSP
0003AL Personnel Security Control Policy and Procedures IAW
Award
Electronic submission to: VA
PM, COR
0003AM Privacy Control Policy
Procedures IAW PWS section 5.3.3
Due 30 Days after Contract
Award
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AN Security Awareness and
Training Control Policy and
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AP Security System and
Communications Protection Control Policy and Procedures
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0003AQ Security System and Services Acquisition Control Policy and
1 EA NSP NSP
0004 Veteran Third Party Portal (VTPP) IAW PWS section 5.4
1 EA $ $
Due 30 days after Contract deliverables required for the successful completion of the services detailed in PWS section 5.4 inclusive of all of its subparagraphs.
0004AA Vendor Pass IAW PWS section 5.4.1
Electronic submission to: VA
PM, COR
1 EA $ $
0005 Ambulance Provider Portal IAW PWS section 5.5
Due 30 days after contract award
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.5 inclusive of all of its subparagraphs
Electronic submission to: VA
PM, COR
1 EA $ $
0006 Veteran Self-Service Portal (VSSP) IAW PWS section 5.6 deliverables required for the successful completion of the section 5.6 inclusive of all of
0006AA VSSP Smart Phone Application Quality Assurance Test (QAT) Procedures IAW PWS section 5.6
1 EA NSP NSP
0006AB VSSP Smart Phone Application QAT Report IAW PWS section 5.6
1 EA NSP NSP
0007 VTP Transportation Solution System Hosting IAW PWS section 5.8
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.8 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
0007AA Solution Architecture IAW PWS section 5.8.1 award
Electronic submission to: VA
PM, COR
0007AB Solution Design IAW PWS section 5.8.1
1 EA NSP NSP
0007AC VAEC Implementation Plan IAW PWS section 5.8.2
1 EA NSP NSP
0007AD Implementation Summary Report IAW PWS section 5.8.4
Due 30 days after contract award
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0007AE Quarterly Solution
Performance Report IAW PWS section 5.8.6
Due 30 days after contract award
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0007AF Quarterly Resource Utilization Optimization Plan IAW PWS section 5.8.6
PM, COR
0007AG Integration and Enhancements IAW PWS Section 5.10
Due 30 days after contract award
Electronic submission to: VA
PM, COR
1 LT $ $
0008 Data Collection and Reporting
IAW PWS section 5.11 deliverables required for the successful completion of the services detailed in PWS section 5.11 inclusive of all of
1 LT $ $
0008AA Adhoc Reporting QAT
5.11.3
1 EA NSP NSP
0008AB Adhoc Reporting QAT Report IAW PWS section 5.11.3
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0008AC Forecasting QAT Procedures
IAW PWS section 5.11.4 award
Electronic submission to: VA
PM, COR
0008AD Forecasting QAT Report IAW
PWS section 5.11.4
1 EA NSP NSP
0009 Help Desk Services IAW PWS section 5.12 deliverables required for the successful completion of the services detailed in PWS section 5.12 inclusive of all of its subparagraphs
1 LT $ $
0009AA VST Transportation Solution Handbook IAW PWS section 5.12
Electronic submission to: VA
PM, COR
1 EA NSP NSP
0010 Training IAW PWS section 5.13
Due 30 days after contract award
This FFP CLIN includes all deliverables required for the successful completion of the services detailed in PWS section 5.13 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
0010AA Daily Training Report IAW PWS section 5.13
1 EA NSP NSP
0011 Authority to Operate (ATO) IAW PWS section 5.15
Due 21 days after contract
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.15 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
0011AA A&A Package IAW PWS section 5.15
1 EA NSP NSP
0011AB Signed ATO Declaration IAW PWS section 5.15
PM, COR
0011AC Bi-Weekly Project Risk Decisions Review Report IAW PWS section 5.15
Due bi-weekly after contract
Electronic submission to: VA
PM, COR
1 EA NSP NSP
Total Base Period $
Option Period One
Period of Performance: 7/1/2023 – 6/30/2024
This 12-month option period may be exercised IAW FAR 52.217-9, Option to Extend the
Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of the Base Period.
1001 Contractor Project Management (IAW) Performance Work Statement (PWS) section 5.1.
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1 inclusive of all of its subparagraphs.
1 LT $ $
1001AA Contractor Project Management Plan IAW PWS section 5.1.1
Update as required.
PM, COR.
1 EA NSP NSP
1001AB Weekly Progress Report in accordance with IAW PWS
Due weekly
PM, COR.
1002 VetRide Scheduling Software System subscription renewal IAW PWS section 5.2, 5.3.4, 5.3.5, 5.3.6, 5.3.7, 5.3.8, 5.14 deliverables required for the successful completion of the services detailed in PWS section 5.2 inclusive of all of its subparagraphs.
12 MO $ $
1003 Administrative Portal IAW
PWS section 5.3
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.3 inclusive of all of its subparagraphs.
1 LT $ $
1003AA Configuration Management
Update annually
1 EA NSP NSP
1003AB Incident Response Plan IAW
PM, COR
1 EA NSP NSP
1003AC Disaster Recovery Plan IAW
1003AD Contingency Plan IAW PWS
1 EA NSP NSP
1003AE Privacy Impact Assessment
PM, COR
1 EA NSP NSP
1003AF Privacy Threshold Analysis
Update every 3 years
1 EA NSP NSP
1003AG Plan of Action and Milestones
Update quarterly
1 EA NSP NSP
1003AH Access Control Policy and Procedures IAW PWS section
1 EA NSP NSP
1003AJ Audit Control Policy and
PM, COR
1 EA NSP NSP
1003AK Identification and
Authentication Control Policy and Procedures IAW PWS
1003AL Personnel Security Control
PM, COR
1 EA NSP NSP
1003AM Privacy Control Policy
PM, COR
1 EA NSP NSP
1003AN Security Awareness and Training Control Policy and
Procedures IAW PWS section
1 EA NSP NSP
1003AP Security System and Communications Protection
Control Policy and Procedures
PM, CO
1 EA NSP NSP
1003AQ Security System and Services Acquisition Control Policy and
Electronic submission to: VA
PM, COR
1004 Veteran Third Party Portal labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.4 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 EA $ $
1004AA Vendor Pass IAW PWS section 5.4.1
Electronic submission to: VA
PM, COR
1 EA $ $
1005 Ambulance Provider Portal IAW PWS section 5.5 deliverables required for the successful completion of the services detailed in PWS section 5.5 inclusive of all of
1 EA $ $
1006 Veteran Self-Service Portal deliverables required for the successful completion of the services detailed in PWS section 5.6 inclusive of all of
1007 VTP Transportation Solution deliverables required for the successful completion of the services detailed in PWS section 5.8 inclusive of all of
1 LT $ $
1007AA Solution Architecture IAW PWS section 5.8.1
1 EA NSP NSP
1007AB Solution Design IAW PWS section 5.8.1
1 EA NSP NSP
1007AC Quarterly Solution Performance Report IAW PWS section 5.8.6
Due quarterly
PM, COR
1 EA NSP NSP
1007AD Quarterly Resource Utilization
Optimization Plan IAW PWS section 5.8.6
1 EA NSP NSP
1007AE Integration and Enhancements IAW PWS Section 5.10
PM, COR
1008 Data Collection and Reporting IAW PWS section 5.11
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.11 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
1009 Help Desk Services IAW PWS section 5.12
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.12 inclusive of all of its subparagraphs
Electronic submission to: VA
PM, COR
1 LT $ $
1010 Training IAW PWS section
5.13
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.13 inclusive of all of its subparagraphs
Electronic submission to: VA
PM, COR
1 LT $ $
1010AA Daily Training Report IAW
PWS section 5.13
Due 30 days after exercise of option
PM, COR
Total Option Period One $
Option Period Two
Period of Performance: 7/1/2024 – 6/30/2025
This 12-month option period may be exercised IAW FAR 52.217-9, Option to Extend the
Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Year One.
2001 Contractor Project Management (IAW)
(CLIN) includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1 inclusive of all of its subparagraphs.
1 LT $ $
2001AA Contractor Project
PM, COR.
1 EA NSP NSP
2001AB Weekly Progress Report in accordance with IAW PWS
1 EA NSP NSP
2002 VetRide Scheduling Software System subscription renewal
IAW PWS section 5.2, 5.3.4, 5.3.5, 5.3.6, 5.3.7, 5.3.8, 5.14
This FFP CLIN includes all
12 MO $ $
deliverables required for the successful completion of the services detailed in PWS section 5.2 inclusive of all of its subparagraphs.
2003 Administrative Portal IAW
PWS section 5.3
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.3 inclusive of all of its subparagraphs.
1 LT $ $
2003AA Configuration Management
1 EA NSP NSP
2003AB Incident Response Plan IAW
PM, COR
1 EA NSP NSP
2003AC Disaster Recovery Plan IAW
1 EA NSP NSP
2003AD Contingency Plan IAW PWS
1 EA NSP NSP
2003AE Privacy Impact Assessment
Electronic submission to: VA
PM, COR
2003AF Privacy Threshold Analysis
PM, COR
1 EA NSP NSP
2003AG Plan of Action and Milestones
1 EA NSP NSP
2003AH Access Control Policy and
PM, COR
1 EA NSP NSP
2003AJ Audit Control Policy and
PM, COR
1 EA NSP NSP
2003AK Identification and Authentication Control Policy and Procedures IAW PWS
1 EA NSP NSP
2003AL Personnel Security Control Policy and Procedures IAW
Electronic submission to: VA
PM, COR
2003AM Privacy Control Policy Procedures IAW PWS section
1 EA NSP NSP
2003AN Security Awareness and Training Control Policy and Procedures IAW PWS section
1 EA NSP NSP
2003AP Security System and Communications Protection
PM, COR
1 EA NSP NSP
2003AQ Security System and Services Acquisition Control Policy and
PM, COR
1 EA NSP NSP
2004 Veteran Third Party Portal
(VTPP) IAW PWS section 5.4
This FFP CLIN includes all labor, materials, travel, and deliverables required for the
2004AA Vendor Pass IAW PWS section 5.4.1
Electronic submission to: VA
PM, COR
1 EA $ $
2005 Ambulance Provider Portal deliverables required for the successful completion of the services detailed in PWS
1 EA $ $
2006 Veteran Self-Service Portal (VSSP) IAW PWS section 5.6
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.6 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
2007 VTP Transportation Solution deliverables required for the
2007AA Solution Architecture IAW PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
2007AB Solution Design IAW PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
2007AC Quarterly Solution
Performance Report IAW
1 EA NSP NSP
2007AD Quarterly Resource Utilization Optimization Plan IAW PWS
1 EA NSP NSP
2007AE Integration and Enhancements IAW PWS Section 5.10
Electronic submission to: VA
PM, COR
1 LT $ $
2008 Data Collection and Reporting IAW PWS section 5.11 deliverables required for the successful completion of the its subparagraphs.
Electronic submission to: VA
PM, COR
2009 Help Desk Services IAW PWS deliverables required for the successful completion of the services detailed in PWS section 5.12 inclusive of all of its subparagraphs
Electronic submission to: VA
PM, COR
1 LT $ $
2010 Training IAW PWS section 5.13
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.13 inclusive of all of its subparagraphs
Electronic submission to: VA
PM, COR
1 LT $ $
2010AA Daily Training Report IAW
PWS section 5.13
Due 30 days after exercise of
Total Option Period Two $
Option Period Three
Period of Performance: 7/1/2025 – 6/30/2026
This 12-month option period may be exercised IAW FAR 52.217-9, Option to Extend the
Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Year Two.
3001 Contractor Project Management (IAW)
(CLIN) includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1 inclusive of all of its subparagraphs
1 LT $ $
3001AA Contractor Project
PM, COR
1 EA NSP NSP
3001AB Weekly Progress Report in accordance with IAW PWS
1 EA NSP NSP
3002 VetRide Scheduling Software System subscription renewal
IAW PWS section 5.2, 5.3.4, 5.3.5, 5.3.6, 5.3.7, 5.3.8, 5.14
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the section 5.2 inclusive of all of its subparagraphs.
3003 Administrative Portal IAW PWS section 5.3
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.3 inclusive of all of its subparagraphs.
1 LT $ $
3003AA Configuration Management
PM, COR
1 EA NSP NSP
3003AB Incident Response Plan IAW
PM, COR
1 EA NSP NSP
3003AC Disaster Recovery Plan IAW
1 EA NSP NSP
3003AD Contingency Plan IAW PWS
PM, COR
1 EA NSP NSP
3003AE Privacy Impact Assessment
PM, COR
3003AF Privacy Threshold Analysis
1 EA NSP NSP
3003AG Plan of Action and Milestones
PM, COR
1 EA NSP NSP
3003AH Access Control Policy and
Procedures IAW PWS section
1 EA NSP NSP
3003AJ Audit Control Policy and Procedures IAW PWS section
1 EA NSP NSP
3003AK Identification and Authentication Control Policy
PM, COR
1 EA NSP NSP
3003AL Personnel Security Control
PM, COR
3003AM Privacy Control Policy
PM, COR
1 EA NSP NSP
3003AN Security Awareness and
Training Control Policy and
PM, COR
1 EA NSP NSP
3003AP Security System and Communications Protection
Control Policy and Procedures
1 EA NSP NSP
3003AQ Security System and Services Acquisition Control Policy and
Procedures IAW PWS section
PM, CO
3004 Veteran Third Party Portal deliverables required for the
3004AA Vendor Pass IAW PWS section 5.4.1
Electronic submission to: VA
PM, COR
1 EA $ $
3005 Ambulance Provider Portal deliverables required for the successful completion of the services detailed in PWS
1 EA $ $
3006 Veteran Self-Service Portal (VSSP) IAW PWS section 5.6
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.6 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
3007 VTP Transportation Solution deliverables required for the
3007AA Solution Architecture IAW PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
3007AB Solution Design IAW PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
3007AC Quarterly Solution
Performance Report IAW
1 EA NSP NSP
3007AD Quarterly Resource Utilization Optimization Plan IAW PWS
1 EA NSP NSP
3007AE Integration and Enhancements IAW PWS Section 5.10
Electronic submission to: VA
PM, COR
1 LT $ $
3008 Data Collection and Reporting IAW PWS section 5.11
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS
Electronic submission to: VA
PM, COR
3009 Help Desk Services IAW PWS deliverables required for the successful completion of the services detailed in PWS section 5.12 inclusive of all of
1 LT $ $
3010 Training IAW PWS section 5.13 deliverables required for the successful completion of the services detailed in PWS section 5.13 inclusive of all of
1 LT $ $
3010AA Daily Training Report IAW
Electronic submission to: VA
PM, COR
Total Option Period Three $
Option Period Four
Period of Performance: 7/1/2026 – 6/30/2027
This 12-month option period may be exercised IAW FAR 52.217-9, Option to Extend the
Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of Option Year Three.
4001 Contractor Project Management (IAW)
(CLIN) includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1 inclusive of all of its subparagraphs
1 LT $ $
4001AA Contractor Project
PM, COR.
1 EA NSP NSP
4001AB Weekly Progress Report in accordance with IAW PWS
1 EA NSP NSP
4002 VetRide Scheduling Software System subscription renewal
IAW PWS section 5.2, 5.3.4, 5.3.5, 5.3.6, 5.3.7, 5.3.8, 5.14
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the section 5.2 inclusive of all of its subparagraphs.
4003 Administrative Portal IAW PWS section 5.3
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.3 inclusive of all of its subparagraphs.
1 LT $ $
4003AA Configuration Management
PM, COR
1 EA NSP NSP
4003AB Incident Response Plan IAW
PM, COR
1 EA NSP NSP
4003AC Disaster Recovery Plan IAW
1 EA NSP NSP
4003AD Contingency Plan IAW PWS
PM, COR
1 EA NSP NSP
4003AE Privacy Impact Assessment
PM, COR
4003AF Privacy Threshold Analysis
1 EA NSP NSP
4003AG Plan of Action and Milestones
PM, COR
1 EA NSP NSP
4003AH Access Control Policy and
Procedures IAW PWS section
1 EA NSP NSP
4003AJ Audit Control Policy and Procedures IAW PWS section
1 EA NSP NSP
4003AK Identification and Authentication Control Policy
PM, COR
1 EA NSP NSP
4003AL Personnel Security Control
4003AM Privacy Control Policy
PM, COR
1 EA NSP NSP
4003AN Security Awareness and Training Control Policy and
PM, COR
1 EA NSP NSP
4003AP Security System and
Communications Protection
PM, COR
1 EA NSP NSP
4003AQ Security System and Services
Acquisition Control Policy and
PM, COR
1 EA NSP NSP
4004 Veteran Third Party Portal deliverables required for the successful completion of the its subparagraphs.
Electronic submission to: VA
PM, COR
4004AA Vendor Pass IAW PWS section 5.4.1
Electronic submission to: VA
PM, COR
1 EA $ $
4005 Ambulance Provider Portal
IAW PWS section 5.5
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.5 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 EA $ $
4006 Veteran Self-Service Portal deliverables required for the successful completion of the services detailed in PWS section 5.6 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
4007 VTP Transportation Solution
System Hosting IAW PWS section 5.8
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the its subparagraphs.
Electronic submission to: VA
PM, COR
4007AA Solution Architecture IAW
PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
4007AB Solution Design IAW PWS section 5.8.1
Electronic submission to: VA
PM, COR
1 EA NSP NSP
4007AC Quarterly Solution Performance Report IAW
1 EA NSP NSP
4007AD Quarterly Resource Utilization Optimization Plan IAW PWS
PM, COR
1 EA NSP NSP
4007AE Integration and Enhancements
IAW PWS Section 5.10
Electronic submission to: VA
PM, COR
1 LT $ $
4008 Data Collection and Reporting
IAW PWS section 5.11 deliverables required for the successful completion of the services detailed in PWS
Electronic submission to: VA
PM, COR
4009 Help Desk Services IAW PWS deliverables required for the successful completion of the services detailed in PWS section 5.12 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
4010 Training IAW PWS section
5.13
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.13 inclusive of all of its subparagraphs.
Electronic submission to: VA
PM, COR
1 LT $ $
4010AA Daily Training Report IAW
Total Option Period Four $
Optional Tasks
FAR 52.217-7, Option for Increased Quantity – Separately priced Line Item (MAR 1989) may be exercised at any time and from time to time up to the quantity set forth in CLIN(S)
5001 - 5002. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer
5001 OPTIONAL TASK 1
Vetride for Volunteer Transportation Network (VTN) IAW PWS section 5.1.5 optional task
This CLIN can be exercised from time to time on an as needed basis.
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.1.5 inclusive of all of its subparagraphs
1 LT $NTE
NOT
EXERCISED
$NTE
5001AA Mobile Data Computer (MDC) Hardware IAW PWS section 5.1.5 optional task.
1 EA NSP NSP
5001AB MDC Data Plans IAW PWS section 5.1.5
Due 30 days after exercise of optional task.
1 EA NSP NSP
5001AC MDC Data Software IAW PWS section 5.1.5
Due 30 days after exercise of optional task.
1 EA NSP NSP
5002 OPTIONAL TASK 2
MDC Hardware Refresh IAW PWS section 5.7
Due 240 days after award
5250 EA $NTE
NOT
EXERCISED
$NTE
This CLIN can be exercised from time to time on an as needed basis.
This FFP CLIN includes all labor, materials, travel, and deliverables required for the successful completion of the services detailed in PWS section 5.7 inclusive of all of its subparagraphs.
5002AA Mobility Manager or Designee Signed Validation of Work Completed IAW PWS section 5.7.2
Due 240 days after award
PM, COR
1 EA NSP NSP
Total Optional Tasks $
Total Price – Including All Optional Tasks and All Option Periods $
B.5 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Veterans Transportation Service (VTP)
VetRide Transportation Solution
Date: 1 February 2022
VA-22-00029434
PWS Version Number: 1.2
1.0 BACKGROUND
The Department of Veterans Affairs (VA), Veterans Health Administration, Member Services
(MS) Veterans Transportation Program (VTP) requires the VetRide Transportation Solution to include scheduling software and routing systems along with the associated hardware to deploy to the VA medical centers (VAMCs) throughout the VA Enterprise. VA requires an integrated transportation approach with vehicle tracking devices, passenger tracking, clinic tracking, disability tracking, dynamic routing, detailed scheduling and reporting. Transportation Services in the VA are widely dispersed and operate independently of each other.
VAMCs currently coordinate local efforts to provide transportation services to Veterans, including specialized services to meet the specific needs of Veterans in each VAMCs catchment area. VA also provides reimbursement for medically related travel to eligible Veterans. The Veterans Transportation Service (VTS) Program is currently at 130 VAMC’s and includes over 1,300 vehicles, 1,600 users, and transports over 500,000 Veterans annually. Even with these efforts, the VA recognizes that access to VA’s benefits and services sometimes remains difficult.
In some cases, VAMCs even use mobile clinics to provide services. Currently the VTP program supports 130 VMAC’s with a goal of reaching a total of 172 VAMC’s by the end of fiscal year 2023 and increasing access to care for Veterans nationally.
In November 2018, VA issued the Cloud First Policy mandating that all new and existing IT solutions be assessed to determine suitability to be offered as an enterprise cloud computing service. The VA Enterprise Cloud (VAEC) was established by the Enterprise
Cloud Solutions Office (ECSO) in 2017, to host cloud computing solutions.
The VTP VetRide Transportation Solution shall be implemented and hosted in the VAEC.
VetRide is a Software-as-a-Service VAEC hosted solution used by Veterans and the VTP. VTS provides transportation services to Veterans free of charge for those who are eligible. VTS Administrative Staff (Admin, Regional Coordinator, Mobility Manager, and Transportation Coordinators) use the VetRide Admin Portal to manage Veteran ride requests (called trips), and scheduling to their vehicle and drivers or their external transportation providers (called th ird parties). Veteran Beneficiary Travel Eligibility can be tracked within VetRide and used to determine Beneficiary (BT) cost reimbursements.
The VA seeks to improve access to health care through a VetRide Transportation solution.
VetRide provides a systematic approach to providing Veterans with rides to and from VA health care facilities for scheduled medical appointments. Transportation services are improved by providing VA health care facilities staff to support ride coordination, ride scheduling/routing and driving.
Additionally, VA acquires vehicles with adequate capacity to handle shuttle and door-to- door routes. The acquired vehicles also accommodate service dogs/animals, wheelchairs, or walkers for Veterans with difficulty walking.
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
9. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology
Act of 2006, Title IX, Information Security Matters
10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019
14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and
Guidelines,” January 18, 2017
15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004 https://www.va.gov/vapubs/index.cfm https://www.va.gov/vapubs/index.cfm http://www.va.gov/vapubs http://www.va.gov/vapubs
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
21. VA Handbook 6500, “Risk Management Framework for VA Information Systems
VA Information Security Program,” February 24, 2021
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” March 12, 2019
23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010
24. VA Handbook 6500.6, “Contract Security,” March 12, 2010
25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011
26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process
Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy
Impact Assessment,” October 15, 2014
31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy
Impact Assessment,” July 30, 2015
32. VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016
33. VA Directive and Handbook 6513, “Secure External Connections,” October 12,
34. VA Directive 6300, “Records and Information Management,” September 21, 2018
35. VA Handbook, 6300.1, “Records Management Procedures, “ March 24, 2010
36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December
37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information
Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014
40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal
Employees and Contractors,” August 5, 2005
41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved
Identity, Credential, and Access Management,” May 21, 2019 https://www.va.gov/process/ https://www.va.gov/process/maps.asp https://www.va.gov/process/artifacts.asp https://www.va.gov/trm/TRMHomePage.aspx
42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated
Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification
(PIV) Credentials in Facility Access,“ June 2018
45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile Devices
(Draft),” October 2012
48. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014
49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC)
Initiative,” September 12, 2019
54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name
System Infrastructure,” August 22, 2008
55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public
Law 110–140), December 19, 2007
56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018
58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013
60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013
61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103 https://arch.idmanagement.gov/#what-is-the-ficam-architecture https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .