36C10B20R0009-001.docx
DOCX document Posted
- Attached to
- D399--Facilities Management Solution
- Solicitation number
- 36C10B20R0009
About this file
36C10B20R0009 FOR RFI - FSC Facility Management Solution PWS - 1.20.2020.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VENDOR SET QUESTIONS AND ANSWERS.docx | DOCX document | |
| 36C10B20R0009-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FSC Facility Management Solution (FMS) TAC Number: VA-20-00019685
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Office of Management Financial Services Center (FSC)
Facilities Management Solution (FMS)
Date: 1/20/2020
VA-20-00019685
PWS Version Number: 1.1
Contents
| 1.0 | BACKGROUND | 4 |
| 2.0 | APPLICABLE DOCUMENTS | 4 |
| 3.0 | SCOPE OF WORK | 8 |
| 4.0 | PERFORMANCE DETAILS | 8 |
| 4.1 | PERFORMANCE PERIOD | 8 |
| 4.2 | PLACE OF PERFORMANCE | 9 |
| 4.3 | TRAVEL | 9 |
| 4.4 | GOVERNMENT FURNISHED PROPERTY | 9 |
| 5.0 | SPECIFIC TASKS AND DELIVERABLES | 9 |
| 5.1 | PROJECT MANAGEMENT | 9 |
| 5.1.1 | CONTRACTOR PROJECT MANAGEMENT PLAN | 9 |
| 5.1.2 | REPORTING REQUIREMENTS | 10 |
| 5.2 | FACILITIES MANAGEMENT SOLUTION SAAS SOLUTION | 10 |
| 5.3 | FACILITIES MANAGEMENT SOLUTION INTEGRATION SUPPORT | 11 |
| 5.3.1 | PROGRAM INITIATION TASKS: | 11 |
| 5.3.2 | FMS SETUP AND DESIGN | 12 |
| 5.3.3 | DATA MIGRATION | 13 |
| 5.3.4 | ASSET MANAGEMENT | 13 |
| 5.3.5 | WORK ORDER MANAGEMENT | 13 |
| 5.3.6 | PORTAL MANAGEMENT | 14 |
| 5.3.7 | FLOOR MAPPING | 15 |
| 5.3.8 | SPACE AND PLANNED MOVE MANAGEMENT | 15 |
| 5.3.9 | USER ACCEPTANCE TESTING | 16 |
| 5.3.10 | PRODUCTION TECHNICAL SUPPORT | 16 |
| 5.3.11 | TRAINING | 17 |
| 5.4 | FMS SOLUTION POST PRODUCTION CUSTOMER SUPPORT | 17 |
| 5.5 | ASSESSMENT, AUTHORIZATION, and CONTINUOUS MONITORING | 17 |
| 6.0 | GENERAL REQUIREMENTS | 18 |
| 6.1 | ENTERPRISE AND IT FRAMEWORK | 18 |
| 6.1.1 | VA TECHNICAL REFERENCE MODEL | 18 |
| 6.1.2 | FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM) | 18 |
| 6.1.3 | INTERNET PROTOCOL VERSION 6 (IPV6) | 20 |
| 6.1.4 | TRUSTED INTERNET CONNECTION (TIC) | 20 |
| 6.1.5 | STANDARD COMPUTER CONFIGURATION | 20 |
| 6.1.6 | VETERAN FOCUSED INTEGRATION PROCESS (VIP) | 21 |
| 6.1.7 | PROCESS ASSET LIBRARY (PAL) | 21 |
| 6.1.8 | AUTHORITATIVE DATA SOURCES | 21 |
| 6.2 | SECURITY AND PRIVACY REQUIREMENTS | 22 |
| 6.2.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 22 |
| 6.2.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 23 |
| 6.3 | METHOD AND DISTRIBUTION OF DELIVERABLES | 25 |
| 6.4 | PERFORMANCE METRICS | 25 |
| 6.5 | FACILITY/RESOURCE PROVISIONS | 26 |
| 6.6 | GOVERNMENT FURNISHED PROPERTY | 27 |
| 6.7 | SHIPMENT OF HARDWARE OR EQUIPMENT | 27 |
| ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED | 29 | |
| ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE | 36 |
BACKGROUND
The Department of Veterans Affairs (VA), Office of Management, Financial Services Center (FSC) is an organization in VA. Under the authority of "The Government Management Reform Act of 1994" and "The Military Quality of Life and Veterans Affairs Appropriations Act, 2006, Public Law 109-114", FSC offers a wide range of financial, accounting, and facility management products and services to both VA and Other Government Agencies (OGA).
Full life-cycle facilities asset management can no longer be properly achieved using old, legacy technologies. The growing strategic role along with the cost and visibility of facilities demands a modern, cloud-based alternative to legacy solutions.
VA FSC is now modernizing their Facilities Management Solution (FMS) in order optimize processes for facilities, operating technologies and employees in order to efficiently manage employee locations, office moves, relocations, and consolidation of office space. This maintenance, support, and equipment and the Contractor shall serve as the single point of contact for all elements of the solution to include installation, necessary computing platforms, integration services, and software support as required.
The Federal CIO has confirmed that for Software as a Service (SaaS), agencies have the option of: (1) leveraging a P-ATO completed by the Joint Authorization Board; (2) leveraging an ATO completed by another agency, or (3) conducting their own ATO. However, if either the JAB or another agency has already gone through the RMF process with the cloud service provider then we encourage the agency to leverage the work already done. This is less burdensome for both the agencies and the service providers.
Regardless of the approach, VA will be using the FedRAMP baselines as a starting point, since they are specifically tailored for cloud services.
APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements For Cryptographic Modules”
4. FIPS Pub 199. Standards for Security Categorization of Federal Information and Information Systems, February 2004
5. FIPS Pub 200, Minimum Security Requirements for Federal Information and Information Systems, March 2016
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Development (CMMI-DEV), Version 1.3 November 2010; and Carnegie Mellon Software Engineering Institute, Capability Maturity Model® Integration for Acquisition (CMMI-ACQ), Version 1.3 November 2010
9. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
10. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters
11. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
12. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
13. VA Handbook 0710, Personnel Security and Suitability Program, May 2, 2016, https://www.va.gov/vapubs/index.cfm
14. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019
15. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017
16. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
17. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
18. NIST SP 800-66 Rev. 1, An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule, October 2008
19. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
20. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
21. VA Directive 6500, “VA Cybersecurity Program,” January 24, 2019
22. VA Handbook 6500, “Risk Management Framework for VA Information Systems – Tier 3: VA Information Security Program,” March 10, 2015
23. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI)”, July 28, 2016
24. VA Handbook 6500.3, “Assessment, Authorization, And Continuous Monitoring Of VA Information Systems,” February 3, 2014
25. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle”, March 22, 2010
26. VA Handbook 6500.6, “Contract Security,” March 12, 2010
27. VA Handbook 6500.8, “Information System Contingency Planning”, April 6, 2011
28. VA Handbook 6500.11, “VA Firewall Configuration”, August 22, 2017
29. OI&T Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
30. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
31. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
32. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015
33. VA Handbook 6510, “VA Identity and Access Management”, January 15, 2016
34. VA Directive and Handbook 6513, “Secure External Connections”, October 12, 2017
35. VA Directive 6300, Records and Information Management, September 21, 2018
36. VA Handbook, 6300.1, Records Management Procedures, March 24, 2010
37. NIST SP 800-37 Rev 1, Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy, December 2018
38. NIST SP 800-53 Rev. 4, Security and Privacy Controls for Federal Information Systems and Organizations, January 22, 2015
39. OMB Memorandum, “Transition to IPv6”, September 28, 2010
40. VA Directive 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, October 26, 2015
41. VA Handbook 0735, Homeland Security Presidential Directive 12 (HSPD-12) Program, March 24, 2014
42. OMB Memorandum M-06-18, Acquisition of Products and Services for Implementation of HSPD-12, June 30, 2006
43. OMB Memorandum 04-04, E-Authentication Guidance for Federal Agencies, December 16, 2003
44. OMB Memorandum 05-24, Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, August 5, 2005
45. OMB memorandum M-11-11, “Continued Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors, February 3, 2011
46. OMB Memorandum, Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation, May 23, 2008
47. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011
48. NIST SP 800-116 Rev 1, Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access, June 2018
49. OMB Memorandum M-07-16, Safeguarding Against and Responding to the Breach of Personally Identifiable Information, May 22, 2007
50. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, Digital Identity Guidelines, December 2017
51. NIST SP 800-157, Guidelines for Derived PIV Credentials, December 2014
52. NIST SP 800-164, Guidelines on Hardware-Rooted Security in Mobile Devices (Draft), October 2012
53. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981 Mobile, PIV, and Authentication, March 2014
54. VA Memorandum, VAIQ #7100147, Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12), April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
55. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
56. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
57. Trusted Internet Connections (TIC) Reference Architecture Document, Version 2.2, Federal Interagency Technical Reference Architectures, Department of Homeland Security, June 19, 2017, https://www.dhs.gov/sites/default/files/publications/TIC_Ref_Arch_v2.2_2017.pdf
58. OMB Memorandum M-08-05, “Implementation of Trusted Internet Connections (TIC), November 20, 2007
59. OMB Memorandum M-08-23, Securing the Federal Government’s Domain Name System Infrastructure, August 22, 2008
60. VA Memorandum, VAIQ #7497987, Compliance – Electronic Product Environmental Assessment Tool (EPEAT) – IT Electronic Equipment, August 11, 2014 (reference Document Libraries, EPEAT/Green Purchasing Section, https://www.voa.va.gov/documentlistpublic.aspx?NodeID=552)
61. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
62. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
63. Executive Order 13834, “Efficient Federal Operations”, dated May 17, 2018
64. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
65. VA Directive 0058, “VA Green Purchasing Program”, July 19, 2013
66. VA Handbook 0058, “VA Green Purchasing Program”, July 19, 2013
67. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access”, January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
68. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
69. “Veteran Focused Integration Process (VIP) Guide 3.2”, December 2018, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
70. VA Memorandum “Proper Use of Email and Other Messaging Services”, January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
SCOPE OF WORK
The Contractor shall provide a Commercial-off-the-Shelf (COTS) SaaS FMS that will optimize processes for facilities, operating technologies and employees in order to efficiently manage employee locations, office moves, relocations, and consolidation of office space. The Contractor shall also provide facilities management solution integration support, to include program initiation tasks, FMS setup and design, data migration, asset management, work order management, portal management, floor mapping, space and planned move management, user acceptance testing, production technical support, and training. Additionally, the Contractor shall provide FMS solution post production customer support and assessment, authorization, and continuous monitoring. This maintenance, support, and equipment and the Contractor shall serve as the single point of contact for all elements of the solution to include installation, necessary computing platforms, integration services, and software support as required.
PERFORMANCE DETAILS
PERFORMANCE PERIOD
The Period of Performance (PoP) shall be twelve (12) months from date of award with three (3) twelve (12) month option periods, if exercised by the Government.
Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO). (If required, the CO may designate the Contractor to work during holidays and weekends)
There are ten (10) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, four are set by date:
| New Year's Day | January 1 |
| Independence Day | July 4 |
| Veterans Day | November 11 |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January |
| Washington's Birthday | Third Monday in February |
| Memorial Day | Last Monday in May |
| Labor Day | First Monday in September |
| Columbus Day | Second Monday in October |
| Thanksgiving | Fourth Thursday in November |
PLACE OF PERFORMANCE
Efforts under this TO shall be performed at Contractor Facilities. The Contractor shall identify the Contractor’s place of performance in their Task Execution Plan.
TRAVEL
The Government anticipates travel to perform the tasks associated with the effort, as well as to attend program-related meetings throughout the PoP. Travel to Washington, DC would typically involve program-related meetings, and travel to VA Facilities would typically involve program-related meetings and/or training sessions.
Travel shall be in accordance with the Federal Travel Regulations (FTR) and requires advanced concurrence by the COR. Contractor travel within the local commuting area will not be reimbursed.
GOVERNMENT FURNISHED PROPERTY
The Government will provide complete information and documents on a timely basis which are reasonably requested by the Contractor for the proper performance of this Task Order (TO). VA will provide the following information, documents, and server access:
· VA will provide data in a conforming format (excel, csv, or xml)
· VA will review and sign-off on all user stories prior to the start of each sprint
· VA will provide DXF files
· VA will provide access to a server for DXF file ingestion and/or any requested integrations
SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following:
PROJECT MANAGEMENT
CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding Month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.
Deliverable:
A. Monthly Progress Report
FACILITIES MANAGEMENT SOLUTION SAAS SOLUTION
The Contractor shall provide a COTS Federal Risk and Authorization Management Program (FedRAMP) approved SaaS FMS that will optimize processes for facilities, operating technologies and employees in order to efficiently manage employee locations, office moves, relocations, and consolidation of office space.
The FMS SaaS Solution shall:
· Run on a cloud infrastructure and shall be accessible from various client devices through either a thin client interface, such as a web browser (e.g., web-based email) or a program interface.
· Not require download of software to VA computers.
· Support 5 Facility Managers (Administrators)
· Support up to 1,500 Users.
The VA shall not manage or control the underlying cloud infrastructure including network, servers, operating systems, storage or individual application capabilities.
The system shall be vendor or third-party hosted and require no servers within VA. There is no interface required to be developed or customization to the vendor hosted solution being requested. All proprietary data processed by SaaS provider shall be owned by SaaS provider/user. The contractor shall have the right to use any Government furnished information throughout the life of the contract for the purpose of performing this specific TO.
The following details the required FMS SaaS solution functionality and shall be implemented:
· Space Management
· Asset Management
· Strategic Planning
· Facility Maintenance
· Move Management
· Employee Emergency Contact Information Management
· Vehicle information
· Parking Pass Management
· Room and Seat Scheduling and Reservation
· Facility Requests
· Work Requests
· Supply Requests
· On-boarding and Exiting Employee Requests.
· Ability to access and analyze facilities, real estate, and maintenance information in real time.
Software must be a SaaS solution that is FedRAMP compliant at the time of award.
FACILITIES MANAGEMENT SOLUTION INTEGRATION SUPPORT
The Contractor shall provide integration support to ensure that the COTS FedRAMP approved SaaS FMS is tailored to the FSC’s specific organizational needs. The Contractor shall integrate the solution through an agile software development methodology. This will include short development cycles, known as sprints, that involve close coordination with customer stakeholders to provide constant feedback.
The following details the specific tasks required to integrate the FMS solution functionality into the FSC organization:
PROGRAM INITIATION TASKS:
The Contractor shall perform the following program initiation tasks after contract award:
· Schedule remote project kickoff meeting for introductions
· Create project plan
· Provide templates to VA for FMS data migration
· Review FMS project roles and responsibilities
· Review of internal VA organizational or cultural issues or constraints
· Review of VA project approval processes to avoid unnecessary delays
· Develop sprint cycle and project sequence of requirements with VA
· Understand VA security requirements and approvals
· Review escalation processes
· Review VA FMS business requirements
· Refine FMS project plan with task dates
· Define FMS scrum call schedule
· Determine Subject Matter Experts from VA
Deliverables:
A. Project Plan B. Data Migration Templates
FMS SETUP AND DESIGN
The Contractor shall install the most recent version of the FMS onto the VA platform. Then the Contactor shall complete the following tasks for the setup and design of the FMS:
· Create user stories
· Upload logo, configure banner text and configure welcome page content for login page
· Deactivate modules out of scope for the Engagement
· Assist with the loading of group, location, and department data
· Configure list layouts, landing page, style sheets and navigation
· Configure system roles and security groups
· Configure the system default date format, time format and time zone
· Configure groups to contain specified roles and associate users to inherit such roles
· Confirm POP3-SMTP e-mail is operational and set e-mail override properties for development
· Configure e-mail catch-box for non-production instance
· Set up admin access for project and engagement managers
· Identify key user and metadata to be brought into the application
A. User Stories
DATA MIGRATION
The Contractor shall complete the following tasks in support of data migration:
· Ensure conforming format (excel, csv, or xml)
· Ensure VA data conforms to FMS Data Dictionary
· Import all active assets and one (1) year of work order data
A. User Stories
ASSET MANAGEMENT
The Contractor shall complete the following tasks in support of asset management:
· Create user stories
· Create required new asset classes
· Define or extend attributes
· Modify rules
· Update configuration item fields
· Update assets
· Create new assets
· Configure pre-allocated and fixed assets
· Set asset states and sub-states
· Retire related assets rules
· Configure asset life cycle workflow
· Creation of asset onboarding workflow
· Creation of preventative maintenance scheduling workflow
· Creation of asset retirement workflow
Deliverables:
A. User Stories
WORK ORDER MANAGEMENT
The Contractor shall complete the following activities and tasks in support of work order management:
· Create user stories
· Enable out-of-the-box asset states and sub-states
· Configure work order types
· Complete work order assignment groups, security groups, and group hierarchy
· Enable work order routing rules
· Operationalize outbound notifications and inbound creation configuration
· Enable out-of-the-box escalations and state workflow
· Enable properly assigned work order to groups and users within Customer’s structure
· Transfer and configure work order checklists from work instructions in current application(s)
· Configure Checklist assignment rules by Asset Model, Asset ID, and Work Order Type
· Enable out-of-the-box SLAs and inactivity rules
· Define SLA start, stop and pause conditions
· Define the following SLA stages:
· In progress
· Achieved
· Breached
· Cancelled
· Paused
· Completed
· Define SLA automation criteria
· Configure SLA time stamps by work order stage
· Enable e-mail notifications to the appropriate assignment group and assignees at specific stages of the work order workflow and to end users
Deliverables:
A. User Stories
PORTAL MANAGEMENT
The Contractor shall complete the following tasks in support of the portal management:
· Create user stories
· Enable the out-of-the-box portal and landing page functionality
· Create top level reporting dashboard
· Update the portal with appropriate VA branding
· Logo
· Color Scheme
· Enable request catalog
· Configure persona-based dashboard
· Configure navigation links
· Create up to five (5) configured reports with VA using the reporting engine
Deliverables:
A. User Stories
FLOOR MAPPING
The Contractor shall complete the following tasks in support of floor mapping:
· Create user stories
· Gather and load DXF files only
· Analyze DXF files to determine and configure space profile
· Migrate up to fifteen (15) DXF files into the module
· Configure rules for DXF file import on a regular basis
· Configure one (1) move management workflow to align with organization process and approvals
· Configure user and asset data relationships
· Configure all business rules, UI policies and client scripts
· Complete location hierarchy
· Unit test interactive floor maps with all personas
· Executive
· Manager
· Technician
Deliverables:
A. User Stories
SPACE AND PLANNED MOVE MANAGEMENT
The Contractor shall complete the following tasks in support of space and planned move management:
· Create user stories
· Setup and configure Departments to meet customer needs
· Setup and configure Regions to meet customer needs
· Setup and configure Campuses to meet customer needs
· Setup and configure Sites to meet customer needs
· Setup and configure Floors to meet customer needs
· Setup and configure Locations to meet customer needs
· Setup and configure Zones to meet customer needs
· Setup and configure Space Functions to meet customer needs
· Setup and configure Move Planner to meet customer needs
· Planned move configuration
· Move Me or Move Others move requests
· Planned move scenarios
· Planned move groups
· Planned move details
· Move work project tasks
· Move work orders
· Move work order tasks
· Move management configurations
· Individual or group move requests
· Move planner
· Move plans
· Move work orders
· Move types
· Move reasons
· Enable move templates
· Move service activities
· State definitions
· State transitions Deliverables:
A. User Stories
USER ACCEPTANCE TESTING
The Contactor shall complete the following tasks in support of UAT:
· Create functional test cases, required for testing user stories
· Schedule, coordinate and execute all UAT activities with assigned resources
· Document, review, prioritize, and then configure any defects as part of a remediation cycle resulting from UAT
· Make every effort to remediate UAT defects within the UAT period and provide for enough time for the FMS to go into Production.
Deliverables:
A. UAT Test Report B. UAT Defect and Resolution Report
PRODUCTION TECHNICAL SUPPORT
The Contactor shall support the following tasks for production:
· Production communications
· Provide technical support duration production as specified in the project plan to remediate any defects or issues
· Provide technical support post production deployment as specified in the project plan
TRAINING
The Contactor shall provide personnel-based training sessions to VA users and administrators. The Contactor shall:
· Creation of user guide and training material
· Conduct two training sessions for each of the three VA users and administrators
Deliverables:
A. User Training Materials
FMS SOLUTION POST PRODUCTION CUSTOMER SUPPORT
The Contractor shall provide FMS customer support from 8:00am through 8:00pm Central Time Zone, Monday through Friday via help desk support tickets generated by telephone, e-mail, fax, or web portal with a response required within 24 hours of submittal. Additionally, customer support includes access to future software releases and training as needed upon implementation of each major software release.
B. FMS Customer Support Plan C. Monthly Customer Support Report ASSESSMENT, AUTHORIZATION, and CONTINUOUS MONITORING
1. The information system solution selected by the Contractor shall comply with the Federal Information Security Management Act (FISMA).
2. The Contractor shall comply with FedRAMP requirements as mandated by Federal laws and policies, including making available any documentation, physical access, and logical access needed to support this requirement.
3. Following guidance from the Federal CIO, VA will utilize existing JAB ATO or agency ATO issued by another agency as a starting point for FedRAMP requirements. If neither of those exist, VA will sponsor FedRAMP ATO. VA will be using the FedRAMP baselines as a starting point, since they are specifically tailored for cloud services.
4. The Contractor shall, where applicable, assist with the VA Authority to Operate (ATO) Process to help achieve agency authorization of the cloud service or migrated application.
5. The Contractor shall afford VA access to the Contractor’s and Cloud Service Provider’s facilities, installations, technical capabilities, operations, documentation, records, and databases.
6. If new or unanticipated threats or hazards are discovered by either VA or the Contractor, or if existing safeguards have ceased to function, the discoverer shall immediately bring the situation to the attention of the other party in accordance with the security appendix B.
7. The Contractor shall not release any data without the consent of VA in writing. All requests for release must be submitted in writing to the COR/CO.
GENERAL REQUIREMENTS
ENTERPRISE AND IT FRAMEWORK
VA TECHNICAL REFERENCE MODEL
The Contractor shall support the VA enterprise management framework. In association with the framework, the Contractor shall comply with OI&T Technical Reference Model (VA TRM). The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OI&T. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.
FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)
The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled by accepting HSPD-12 PIV credentials using VA Enterprise Technical Architecture (ETA), https://www.ea.oit.va.gov/EAOIT/VA_EA/Enterprise_Technical_Architecture.asp, and VA Identity and Access Management (IAM) approved enterprise design and integration patterns, https://www.oit.va.gov/library/recurring/edp/index.cfm. The Contractor shall ensure all Contractor delivered applications and systems comply with the VA Identity, Credential, and Access Management policies and guidelines set forth in the VA Handbook 6510 and align with the Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance v2.0.
The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500 Appendix F, “VA System Security Controls”, and VA IAM enterprise requirements for direct, assertion based authentication, and/or trust based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV card and/or Common Access Card (CAC), as determined by the business need.
The Contractor shall ensure all Contractor delivered applications and systems conform to the specific Identity and Access Management PIV requirements set forth in the Office of Management and Budget (OMB) Memoranda M-04-04, M-05-24, M-11-11, and NIST Federal Information Processing Standard (FIPS) 201-2. OMB Memoranda M-04-04, M-05-24, and M-11-11 can be found at: https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/omb/memoranda/fy04/m04-04.pdf, https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-24.pdf, and https://obamawhitehouse.archives.gov/sites/default/files/omb/memoranda/2011/m11-11.pdf respectively. Contractor delivered applications and systems shall be on the FIPS 201-2 Approved Product List (APL). If the Contractor delivered application and system is not on the APL, the Contractor shall be responsible for taking the application and system through the FIPS 201 Evaluation Program.
The Contractor shall ensure all Contractor delivered applications and systems support:
1. Automated provisioning and are able to use enterprise provisioning service.
2. Interfacing with VA’s Master Veteran Index (MVI) to provision identity attributes, if the solution relies on VA user identities. MVI is the authoritative source for VA user identity data.
3. The VA defined unique identity (Secure Identifier [SEC ID] / Integrated Control Number [ICN]).
4. Multiple authenticators for a given identity and authenticators at every Authenticator Assurance Level (AAL) appropriate for the solution.
5. Identity proofing for each Identity Assurance Level (IAL) appropriate for the solution.
6. Federation for each Federation Assurance Level (FAL) appropriate for the solution, if applicable.
7. Two-factor authentication (2FA) through an applicable design pattern as outlined in VA Enterprise Design Patterns.
8. A Security Assertion Markup Language (SAML) implementation if the solution relies on assertion based authentication. Additional assertion implementations, besides the required SAML assertion, may be provided as long as they are compliant with NIST SP 800-63-3 guidelines.
9. Authentication/account binding based on trusted Hypertext Transfer Protocol (HTTP) headers if the solution relies on Trust based authentication.
10. Role Based Access Control.
11. Auditing and reporting capabilities.
12. Compliance with VIEWS 00155984, PIV Logical Access Policy Clarification https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896.
The required Assurance Levels for this specific effort are Identity Assurance Level 3, Authenticator Assurance Level 3, and Federation Assurance Level 3.
INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support the latest Internet Protocol Version 6 (IPv6) based upon the directives issued by the Office of Management and Budget (OMB) on August 2, 2005 (https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/omb/memoranda/fy2005/m05-22.pdf) and September 28, 2010 (https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/egov_docs/transition-to-ipv6.pdf). IPv6 technology, in accordance with the USGv6 Profile, NIST Special Publication (SP) 500-267 (https://nvlpubs.nist.gov/nistpubs/Legacy/SP/nistspecialpublication500-267.pdf), the Technical Infrastructure for USGv6 Adoption (https://www.nist.gov/programs-projects/usgv6-program), and the NIST SP 800 series applicable compliance (https://csrc.nist.gov/publications/sp) shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices shall support native IPv6 and/or dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g. web, email, DNS, ISP services, etc.) shall support native IPv6 and/or dual stack (IPv6/ IPv4) users and all internal infrastructure and applications shall communicate using native IPv6 and/or dual stack (IPv6/ IPv4) operations. Guidance and support of improved methodologies which ensure interoperability with legacy protocol and services in dual stack solutions, in addition to OMB/VA memoranda, can be found at: https://www.voa.va.gov/documentlistpublic.aspx?NodeID=282.
TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M08-05 mandating Trusted Internet Connections (TIC) (https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/omb/memoranda/fy2008/m08-05.pdf), M08-23 mandating Domain Name System Security (NSSEC) (https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/omb/memoranda/fy2008/m08-23.pdf), and shall comply with the Trusted Internet Connections (TIC) Reference Architecture Document, Version 2.0 https://www.dhs.gov/sites/default/files/publications/TIC_Ref_Arch_v2.2_2017.pdf.
STANDARD COMPUTER CONFIGURATION
The Contractor IT end user solution that is developed for use on standard VA computers shall be compatible with and be supported on the standard VA operating system, currently Windows 10 (64bit), Internet Explorer 11 and Office 365 ProPlus. Applications delivered to VA and intended to be deployed to Windows 10 workstations shall be delivered as a signed .msi package with switches for silent and unattended installation and updates shall be delivered in signed .msp file formats for easy deployment using System Center Configuration Manager (SCCM) VA’s current desktop application deployment tool. Signing of the software code shall be through a vendor provided certificate that is trusted by VA using a code signing authority such as Verizon/Cybertrust or Symantec/VeriSign. The Contractor shall also ensure and certify that their solution functions as expected when used from a standard VA computer, with non-admin, standard user rights that have been configured using the United States Government Configuration Baseline (USGCB) and Defense Information Systems Agency (DISA) Secure Technical Implementation Guide (STIG) specific to the particular client operating system being used.
VETERAN FOCUSED INTEGRATION PROCESS (VIP)
The Contractor shall support VA efforts IAW the Veteran Focused Integration Process (VIP). VIP is a Lean-Agile framework that services the interest of Veterans through the efficient streamlining of activities that occur within the enterprise. The VIP Guide can be found at https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371. The VIP framework creates an environment delivering more frequent releases through a deeper application of Agile practices. In parallel with a single integrated release process, VIP will increase cross-organizational and business stakeholder engagement, provide greater visibility into projects, increase Agile adoption and institute a predictive delivery cadence. VIP is now the single authoritative process that IT projects must follow to ensure development and delivery of IT products
PROCESS ASSET LIBRARY (PAL)
The Contractor shall perform their duties consistent with the processes defined in the OIT Process Asset Library (PAL). The PAL scope includes the full spectrum of OIT functions and activities, such as VIP project management, operations, service delivery, communications, acquisition, and resource management. PAL serves as an authoritative and informative repository of searchable processes, activities or tasks, roles, artifacts, tools and applicable standards and guides to assist the OIT workforce, Government and Contractor personnel. The Contractor shall follow the PAL processes to ensure compliance with policies and regulations and to meet VA quality standards. The PAL includes the contractor onboarding process consistent with Section 6.2.2 and can be found at https://www.va.gov/PROCESS/artifacts/maps/process_CONB_ext.pdf. The main PAL can be accessed at www.va.gov/process.
AUTHORITATIVE DATA SOURCES
The VA Enterprise Architecture Repository (VEAR) is one component within the overall Enterprise Architecture (EA) that establishes the common framework for data taxonomy for describing the data architecture used to develop, operate, and maintain enterprise applications. The Contractor shall comply with the department’s Authoritative Data Source (ADS) requirement that VA systems, services, and processes throughout the enterprise shall access VA data solely through official VA ADSs where applicable, see below. The Information Classes which compose each ADS are located in the VEAR, in the Data & Information domain. The Contractor shall ensure that all delivered applications and system solutions support:
1. Interfacing with VA’s Master Veteran Index (MVI) to provision identity attributes, if the solution relies on VA user identities. MVI is the authoritative source for VA user identity data.
2. Interfacing with Capital Asset Inventory (CAI) to conduct real property record management actions, if the solution relies on real property records data. CAI is the authoritative source for VA real property record management data.
3. Interfacing with electronic Contract Management System (eCMS) for access to contract, contract line item, purchase requisition, offering vendor and vendor, and solicitation information above the micro-purchase threshold, if the solution relies on procurement data. ECMS is the authoritative source for VA procurement actions data.
4. Interfacing with HRSmart Human Resources Information System to conduct personnel action processing, on-boarding, benefits management, and compensation management, if the solution relies on personnel data. HRSmart is the authoritative source for VA personnel information data.
5. Interfacing with Vet360 to access personal contact information, if the solution relies on VA Veteran personal contact information data. Vet360 is the authoritative source for VA Veteran Personal Contact Data.
6. Interfacing with VA/Department of Defense (DoD) Identity Repository (VADIR) for determining eligibility for VA benefits under Title 38, if the solution relies on qualifying active duty military service data. VADIR is the authoritative source for Qualifying Active Duty military service in VA.
SECURITY AND PRIVACY REQUIREMENTS
POSITION/TASK RISK DESIGNATION LEVEL(S)
In accordance with VA Handbook 0710, Personnel Security and Suitability Program, the position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Task
| Task Number |
| Tier1 / Low Risk |
| Tier 2 / Moderate Risk |
| Tier 4 / High Risk |
| 5.1 |
| |X| |
| |_| |
| |_| |
| 5.2 |
| |X| |
| |_| |
| |_| |
| 5.3 |
| |X| |
| |_| |
| |_| |
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities:
1. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak and understand the English language.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement (based upon Section 6.2 Tasks), etc. The Contractor shall submit full Social Security Numbers either within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc. throughout the Period of Performance. The Contractor Staff Roster shall remain a historical document indicating all past information and the Contractor shall indicate in the Comment field, employees no longer supporting this contract. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
1. The Contractor should coordinate with the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized. The Contractor shall bring their completed Security and Investigations Center (SIC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.
b. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:
1) Optional Form 306
2) Self-Certification of Continuous Service
3) VA Form 0710
4) Completed SIC Fingerprint Request Form The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC).
The Contractor employee shall certify and release the e-QIP document, print and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC. These documents shall be submitted to the COR within 3 business days of receipt of the e-QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via e-QIP).
1. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
1. A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (Appendix C, Section 9), signed “Contractor Rules of Behavior”, and with a valid, operational PIV credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by OPM. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of OPM.
1. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.
Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.
Deliverable:
A. Contractor Staff Roster
METHOD AND DISTRIBUTION OF DELIVERABLES
The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include: MS Word 2000/2003/2007/2010, MS Excel 2000/2003/2007/2010, MS PowerPoint 2000/2003/2007/2010, MS Project 2000/2003/2007/2010, MS Access 2000/2003/2007/2010, MS Visio 2000/2002/2003/2007/2010, AutoCAD 2002/2004/2007/2010, and Adobe Postscript Data Format (PDF).
PERFORMANCE METRICS
The table below defines the Performance Standards and Acceptable Levels of Performance associated with this effort.
| Performance Objective |
| Performance Standard |
| Acceptable Levels of Performance |
| A. Technical / Quality of Product or Service |
| 1. Demonstrates understanding of requirements |
2. Efficient and effective in meeting requirements
3. Meets technical needs and mission requirements
4. Provides quality services/products
5. Incorporates “ease of use” Human Centered Design principles in any software developed.
Satisfactory or higher
| B. Project Milestones and Schedule |
| 1. Established milestones and project dates are met |
2. Products completed, reviewed, delivered in accordance with the established schedule
3. Notifies customer in advance of potential problems Satisfactory or higher
| C. Cost & Staffing |
| 1. Currency of expertise and staffing levels appropriate to perform tasks required |
2. Personnel possess necessary knowledge, skills and abilities to perform tasks Satisfactory or higher
| D. Management |
| 1. Integration and coordination of all activities to execute effort |
| Satisfactory or higher |
The COR will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable level of performance. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion. A Performance Based Service Assessment will be used by the COR in accordance with the QASP to assess Contractor performance.
FACILITY/RESOURCE PROVISIONS
The Government will provide office space, telephone service and system access when authorized contract staff work at a Government location as required in order to accomplish the Tasks associated with this PWS.