This document is a contract modification (P00016) to Task Order 36C10B20F0076 titled "Enterprise Testing Service Support Services (ETSSS)" under the General Services Administration (GSA) Federal Supply Schedule contract GS-35F-598GA with Planned Systems International, Inc.
The key details are:
- The modification extends the period of performance (PoP) of the task order to June 14, 2025 to accommodate five months of full scope testing through February 14, 2025 and an extended transition out period.
- The ceiling values for CLINs 4001, 4002, and 4003 are increased by $726,190.65, $13,742,559.35, and $31,250.00 respectively.
- The total value of Option Period 4 is increased from $10,166,379.78 to $24,666,379.78, and the total contract value is increased from $149,735,860.84 to $164,235,860.84.
- The total funded amount of the contract is increased from $147,501,208.49 to $162,448,006.17.
- An optional Transition Out Support task (CLIN 5001) with a not-to-exceed amount of $887,380.81 is added for the PoP of February 15, 2025 to June 14, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GS-35F-598GA 36C10B20F0076 P00016_1.docx | DOCX document | |
| JA Narrative ETSSS_Ceiling Increase FINAL Redacted_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 10
P00016 9/15/2024
101-244-5634-0113; F363151-24-0002456;
F363151-24-0002701
VA-24-00070946
36C10B
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
36C10B
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
PLANNED SYSTEMS INTERNATIONAL INC
PLANNED SYSTEMS INTERNATIONAL INC
10632 LITTLE PATUXENT PKWY
STE 200
COLUMBIA MD 21044-6250
0PS84
GS-35F-598GA 36C10B20F0076
06-14-2020
X
101-364/61123-5634-110600-2510 EHRB00000; VACO 2024 0167ADD S1986320 S19863206
FINMGTCORP OIT00140 IT027 251301 204200001-00 OMCORSVCSMD; VACO 2024 0167ADD S1928120
S19281200 LASENTPRS OIT00511 IT027 251101 204200001-00 OMOPSUPSS
X FAR 8.405-6(a)(1)(i)(B)
X 1
See Continuation Page
Points of Contact:
Sandra Vargo, sandra.vargo@va.gov Contract Specialist
Joshua Hammill, joshua.hammill@va.gov Contracting Officer
Joshua Hammill Contracting Officer
09-12-2024
CONTINUATION PAGE
The purpose of this modification, P00016, to Task Order 36C10B20F0076 titled, “Enterprise Testing Service Support Services (ETSSS)” under the terms and conditions of the General Services Administration (GSA) Federal Supply Schedule (FSS) GS-35F-598GA with Planned Systems International, Inc. is detailed below.
1. In Accordance With (IAW) FAR 8.405-6(a)(1)(i)(B), this modification will increase the PoP of the task order to June 14, 2025. This increase will accommodate five months of full scope testing through February 14, 2025, and an extended transition out period to a new contractor, if required.
2. As a result of this modification, the value of CLIN 4001 is revised as follows:
FROM: $435,714.39 BY: $726,190.65 TO: $1,161,905.04
3. As a result of this modification, the ceiling of CLIN 4002 is hereby increased as follows:
FROM: $9,570,211.03 BY: $13,742,559.35 TO: $23,312,770.38
4. As a result of this modification, the ceiling of CLIN 4003 is hereby increased as follows:
FROM: $160,454.36 BY: $31,250.00 TO: $191,704.36
5. As a result of this modification, the Transition Out Support PoP is hereby defined to be February 15, 2025 – June 14, 2025 for CLIN 5001, if exercised. See pages 4 through 14 for revisions to the price schedule. All changes are reflected in red text.
6. As a result of the aforementioned changes, the value of Option Period 4 is hereby increased as follows:
FROM: $10,166,379.78 BY: $14,500,000.00 TO: $24,666,379.78
7. As a result of the aforementioned changes, the total Contract Value is hereby increased as follows:
FROM: $149,735,860.84 BY: $14,500,000.00 TO: $164,235,860.84
8. As a result of the aforementioned changes, the total Obligated Value of the Contact is hereby increased as follows:
FROM: $147,501,208.49 BY: $14,946,797.68 TO: $162,448,006.17
9. See Funding Summary below.
The total obligated amount of this Task Order is as follows:
Base Period: (Funded) $14,526,314.52 Base Period P00001: (Funded) $ 4,858,319.10 Base Period P00003: (Funded) $12,483,996.78 Option Period 1 P00004: (Funded) $14,167,376.22 Option Period 1 P00005: (Funded) $ 4,702,990.43 Option Period 1 P00006: (Funded) $ 2,456,915.60 Option Period 1 P00007: (Funded) $13,332,623.78
Option Period 1 P00009: (Funded) $ 1,023,071.00 Option Period 2 P00010: (Funded) $35,127,227.07 Option Period 1 P00011: (Realignment decrease of OP1) ($803,247.68) Option Period 2 P00011: (Realignment increase of OP2) $803,247.68 Option Period 2 P00012: (Realignment increase of OP2) $101,500.00 Option Period 3 P00012: (Funded) $3,984,445.88 Option Period 3 P00013: (Funded) $31,654,679.90 Option Period 3 P00014: (Funded) $14,285.71 Option Period 4 P00015: (Funded) $9,067,462.50 Option Period 4 P00016: (Funded via this modification) $14,946,797.68 Total Funded: $162,448,006.17
The total unfunded amount of this Task Order is revised as follows:
Base Period: (Unfunded) $ 0.00 Option Period 1: (Unfunded) $ 212,639.97 Option Period 2: (Unfunded) $ 0.00 Option Period 3: (Unfunded) $ 35,714.29 Option Period 4: (Unfunded) $ 652,119.60 Optional Task – Transition: (Unfunded) $ 887,380.81 Total Unfunded: $ 1, 787,854.67
TOTAL ORDER: $164,235,860.84
Note - Funding updates are captured in red font in Section B.4 Price/Schedule.
10. Except as provided herein, all other terms and conditions of Order 36C10B20F0076 Contract GS- 35F-598GA remain unchanged and in full force and effect.
B.4 PRICE SCHEDULE
Please be advised that in accordance with Federal Acquisition Regulation (FAR) Part 2.101, a “day” means, unless otherwise specified, a CALENDAR day. Additionally, deliverables with due dates falling on a weekend or holiday shall be submitted the following Government workday after the weekend or holiday.
Inspection, Acceptance, and F.O.B.: Destination
Deliverables throughout the performance of this contract shall be provided via electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR), and Contracting Officer (CO).
OPTION PERIOD 4
This option period is hereby exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR
2000).
Period of Performance: June 15, 2024 – February 14, 2025
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
Project Management IAW PWS Paragraph 5.1, inclusive of subparagraphs.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and all of its subparagraphs.
PoP: June 15, 2024 – February 14, 2025
8 MO $145,238.13 $1,161,905.04
Funding Summary
PO 101-EH4468
$383,428.66
IPR F363151-24
0001449 $52,285.73
PO-101-EH4547
$639,047.75
IPR F363151-24-
0002701
$87,142.90
4001AA Contractor Project Management Plan IAW PWS Paragraph 5.1.1
Due 30 days after commencement of option period 4 and updated monthly thereafter.
1 LO NSP NSP
4001AB Monthly Progress Reports IAW PWS Paragraph 5.1.3
Due the fifth day of each month throughout the period of performance.
1 LO NSP NSP
4001AC Contractor Staff Roster IAW PWS paragraph 6.2.2
Due within 1 day of any changes.
1 LO NSP NSP
4002 Time and Material (T&M) LABOR IAW PWS Paragraphs 5.2 through 5.4 inclusive of all subparagraphs.
This T&M CLIN includes all labor and deliverables required for the successful completion of the tasks associated with PWS Paragraphs 5.2 through 5.4, including all subparagraphs.
This T&M CLIN is in IAW Federal Acquisition Regulation (FAR) 52.232-7 for invoicing or billing purposes.
The T&M rates for this CLIN are incorporated in Attachment 0001.
PoP: September 15, 2024 – June 14, 2025.
1 LO NTE
$23,312,770.38
NTE
$23,312,770.38
Funding Summary
$7,550,283.84
0001449
$1,055,214.27
0001449 (FMBT)
$7,500.00
PO 101-EH4547
$12,583,806.41
0002701 $1,585,709.37
0002456(FMBT)
$19,841.25
Remaining $510,415.24
4002AA Work Product Review Analysis Report IAW PWS paragraph 5.2.1
Due: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AB Risk Analysis Summary IAW PWS paragraph 5.2.3
Due: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AC ETS Test Plan Summary IAW PWS paragraph 5.2.4
Due/Frequency: Upon completion of Quality Assurance Review
4002AD Test Analysis Summary IAW PWS paragraph 5.2.6
Due/Frequency: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AE Patient Safety Issue Testing Report IAW PWS paragraph 5.2.7
Due/Frequency: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AF Operational Assessment Test and Evaluation Process IAW PWS paragraph 5.2.10
Due/Frequency: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AG Operational Assessment Report of Findings (one per SUT) IAW PWS paragraph 5.2.10
Due/Frequency: Upon completion of Quality Assurance Review
1 LO NSP NSP
4002AH Revised System Architecture Documentation IAW PWS paragraph 5.3.1
Due/Frequency: As required
1 LO NSP NSP
4002AJ Architecture Diagrams for Major Programs IAW PWS paragraph 5.3.1
Due/Frequency: As required
1 LO NSP NSP
4002AK Test Environment Logical Requirements Document IAW PWS paragraph 5.3.2
Due/Frequency: As required
1 LO NSP NSP
4002AL Configuration Management Plan of the Virtual Services IAW PWS paragraph 5.3.3
Due/Frequency: Monthly
1 LO NSP NSP
4002AM Change Management Plan of the Virtual Services IAW PWS paragraph 5.3.3
Due/Frequency: Monthly
1 LO NSP NSP
4002AN Virtual Service Creation and Deployment Process IAW PWS paragraph 5.3.3
Due/Frequency: Monthly
4002AP Test Data Creation Process and Strategy IAW PWS paragraph 5.3.3
Due/Frequency: Monthly
1 LO NSP NSP
4002AQ Interoperability Management Process IAW PWS paragraph 5.3.3
Due/Frequency: Monthly
1 LO NSP NSP
4002AR ETSTC O&M Plan IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AS Revised Patch Management Plan IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AT Revised Configuration and Change Management Documents IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AU ETSTC O&M Monthly Status Report IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AV Revised Disaster Recovery Plan s IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AW Revised Database Backup & Recovery Plan IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AX After Action Reports IAW PWS paragraph 5.3.4
Due/Frequency: Monthly
1 LO NSP NSP
4002AY Database Performance Report IAW PWS paragraph 5.3.5
Due/Frequency: Monthly
1 LO NSP NSP
4002AZ Revised Configuration and Change Management Documents IAW PWS paragraph 5.3.5
Due/Frequency: Monthly
1 LO NSP NSP
4002BA ETSTC Database Administration Plan IAW PWS paragraph 5.3.5
Due/Frequency: Monthly 4002BB Tools Assessment Report IAW PWS paragraph 5.3.7
Due/Frequency: Monthly
1 LO NSP NSP
4002BC Continuous Quality Improvement Process Plan IAW PWS paragraph 5.4.1
Process Plan Due/Frequency: Due 30 days after commencement of option period 4 and updated monthly thereafter.
1 LO NSP NSP
4002BD Lessons Learned Repository IAW PWS paragraph 5.4.2
Due/Frequency: 30 days after completion of each testing cycle
1 LO NSP NSP
4002BE Lessons Learned Report IAW PWS paragraph 5.4.2
Due/Frequency: 30 days after completion of each testing cycle
1 LO NSP NSP
4002BF Quality Review Report IAW PWS paragraph 5.4.2
Due/Frequency: Quarterly
1 LO NSP NSP
4002BG Artifact Review Findings Report IAW PWS paragraph 5.4.3
Due/Frequency: On an ad hoc basis or annually at a minimum
1 LO NSP NSP
4002BH Artifact Corrective Plan of Action IAW PWS paragraph 5.4.3
Due/Frequency: As required based on Artifact review findings
1 LO NSP NSP
4002BJ Updated ETS Measurement and Metric Plan IAW PWS paragraph 5.4.5
Due/Frequency: Monthly
1 LO NSP NSP
4002BK CQIP Orientation and Overview Briefing IAW PWS paragraph 5.4.6
Due/Frequency: Monthly
1 LO NSP NSP
4002BL Root Cause Analysis Incident Report IAW PWS paragraph 5.4.7
Due/Frequency: 15 days after anomaly or incident has been resolved
4003 T&M TRAVEL IAW PWS Paragraph 4.3.
Travel shall be in accordance with the Federal Travel Regulations (FTR). Travel requires advanced concurrence and shall be approved by the VA PM/COR in writing. Task order travel within the local commuting area will not be reimbursed.
The Contractor’s fixed handling rate as set forth herein may be applied to the billable travel cost and shall not exceed that set forth in the basic contract. Profit shall not be applied.
Government Not to Exceed Travel Ceiling:
$191,704.36
+ Fixed Handling Rate 6.28%
= Travel NTE Ceiling $191,704.36 (Inclusive of Government NTE travel ceiling + Fixed Handling Rate)
1 LO NTE
$191,704.36
NTE $191,704.36
Funding Summary
$18,750.00
PO 101-EH4547
$31,250.00
Remaining
$141,704.36
OPTION PERIOD 4 TOTAL $24,666,379.78
OPTIONAL TASK – TRANSITION OUT SUPPORT
PoP: February 15, 2025 – June 14, 2025
This is an optional task, FAR 52.217-7, Option for Increased Quantity – Separately priced Line Item (MAR 1989). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. This option may be exercised in the Base Period or Option Periods 1 through 4.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
5001 Optional Task – Transition Out Support (T&M) IAW PWS Paragraph 5.5.
This T&M CLIN includes all labor and deliverables required for the successful completion of the tasks associated with PWS Paragraph 5.5.
This T&M CLIN is in IAW FAR 52.232-7 for invoicing or billing purposes.
1 LO NTE
$887,380.81
NTE $887,380.81
The T&M rates for this CLIN are incorporated in Attachment 0001.
NOTE: Activities related to this task will be performed if a Contractor other than the incumbent Contractor is awarded the follow-on ETSSS order Task 5.5 is designated as an Optional Task and will be exercised at the discretion of the Government in accordance with FAR 52.217-7. If exercised, the period of performance will not exceed June 14, 2025.
The Contractor shall prepare a comprehensive Transition Plan within 30 days of exercise of the optional task. The Contractor shall attend regularly scheduled meetings with ETS for the remaining 150-days after receipt of the Transition Plan in order to assist with knowledge transfer.
Work shall not commence until a formal task order modification has been issued by the Contracting Officer.
5001AA Contract Transition Team Roster IAW PWS Paragraph 5.5
Due/Frequency: 21 days after optional task if exercised
1 LO NSP NSP
5001AB Transition-Out Plan IAW PWS Paragraph 5.5
Due/Frequency: 30 days after optional task if exercised
1 LO NSP NSP
OPTIONAL TASK TOTAL $887,380.81
ORDER TOTAL (INCLUSIVE OF ALL OPTIONS) $164,235,860.84