GS-03F-0151X-000.docx
DOCX document 139 KB Posted
- Solicitation number
- 36C10B18Q3092
About this file
GS-03F-0151X 36C10B18F2881 GS-03F-0151X 36C10B18F2881.docx
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multifunction Copier Services 36C10B18Q3092
FedBizOpps Award Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
ARCHIVE
DAYS AFTER THE AWARD DATE
RECOVERY ACT FUNDS
NAICS CODE
SET-ASIDE
CONTRACTING OFFICE
ADDRESS
DESCRIPTION
See Attachment
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
AWARD NUMBER
AWARD AMOUNT
LINE ITEM NUMBER
AWARD DATE (MM-DD-YYYY)
AWARDEE NAME
CONTRACTOR'S DUNS NUMBER
AWARDEE ADDRESS LINE 1
AWARDEE ADDRESS LINE 2
AWARDEE ADDRESS LINE 3
AWARDEE ADDRESS LINE 4
AWARDEE CITY
AWARDEE STATE
AWARDEE ZIP CODE
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
AWARD INFORMATION
ADDITIONAL INFORMATION
GENERAL INFORMATION
* = Required Field FedBizOpps Award Notice Rev. March 2010 W TAC-18-50896 - Multifunction Copier Services for WMC 07724 36C10B18Q3092 N 532420 Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724 William Freer- William.Freer@va.gov Peter Lewandowski- Peter.Lewandowski@va.gov
GS-03F-0151X 36C10B18F2881
427,944.60 08-30-2018
CARTRIDGE TECHNOLOGIES, INC.
556978807
15738 CRABBS BRANCH WAY
ROCKVILLE
MD
20855 William.Freer@va.gov William.Freer@va.gov
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
TBD
See Block 31C 36C10B18Q3092 William Freer, Contract Specialist 732-795-1063
4:00 PM EST- 8/27/18
Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724 X X N/A X See Delivery Schedule
Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
TBD
Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971 See Section B Contract Type: Firm-Fixed-Price (FFP) Alternate POC: Peter Lewandowski Peter.Lewandowski@va.gov
PO# TBD
POP: 12 Months ARO and four 12-month option Periods.
This Request for Quotation is being issued on General Services Administration Schedule 36 as a small business set-aside.
X X Peter Lewandowski Contracting Officer Table of Contents
| SECTION A | 2 | |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 2 | |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 5 | |
| CONTRACT ADMINISTRATION DATA | 5 | |
| B.2 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT: | 7 | |
| B.3 PRICE/DELIVERY SCHEDULE | 9 | |
| B.4 PERFORMANCE WORK STATEMENT | 30 | |
| BACKGROUND | 30 | |
| 1.0 APPLICABLE DOCUMENTS | 31 | |
| 2.0 SCOPE OF WORK | 32 | |
| 3.0 PERFORMANCE DETAILS | 32 | |
| 3.3 TRAVEL | 37 | |
| B.5 SPECIFIC TASKS AND DELIVERABLES | 37 | |
| 4.1 | PROJECT MANAGEMENT | 37 |
| 4.1.1 | CONTRACTOR PROJECT MANAGEMENT | 37 |
| 4.1.2 | REPORTING REQUIREMENTS | 37 |
| 4.2 | COPIER/ SCANNER/ FAX SPECIFICATIONS/ CONFIGURATIONS: | 38 |
| 4.3 | NETWORK FUNCTIONALITY: | 39 |
| 4.4 | INSTALLATION & REMOVALS: | 40 |
| 4.5 | TRAINING: | 41 |
| 4.6 | CONSUMABLE SUPPLIES: | 41 |
| 4.7 | MAINTENANCE (Including Operational Standards & Performance): | 41 |
| 4.8 | COPIER RELOCATION (OPTIONAL TASK(S) | 42 |
| 4.9 | ADDITIONAL COPIER(S) (OPTIONAL TASK(S) | 43 |
| B.6 GENERAL REQUIREMENTS | 43 | |
| 5.1 ENTERPRISE AND IT FRAMEWORK | 43 | |
| 5.2 POSITION/TASK RISK DESIGNATION LEVEL(S) AND CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 44 | |
| 5.2.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 44 |
| 5.2.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 46 |
| 5.3 | METHOD AND DISTRIBUTION OF DELIVERABLES | 47 |
| 5.4 | PERFORMANCE METRICS | 48 |
| 5.5 | FACILITY/RESOURCE PROVISIONS | 49 |
| 5.6 | GOVERNMENT FURNISHED PROPERTY | 49 |
| ADDENDUM A | 50 | |
| ADDENDUM B | 55 | |
| SECTION C - CONTRACT CLAUSES | 69 | |
| C.1 FSS RFQ INTRODUCTORY LANGUAGE | 69 | |
| C.3 52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) | 70 | |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 70 | |
| C.5 52.232-40 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (DEVIATION) (AUG 2012) | 70 | |
| C.6 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 71 | |
| C.7 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 71 | |
| C.8 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 72 | |
| C.9 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 73 | |
| C.10 GUARANTEE (JAN 2008) | 73 | |
| C.11 INSPECTION (JAN 2008) | 73 | |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 74 | |
| SECTION E - SOLICITATION PROVISIONS | 75 | |
| E.1 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010) | 75 | |
| E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (FEB 2012) | 77 | |
| E.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 78 | |
| E.4 52.217-5 EVALUATION OF OPTIONS (JUL 1990 | 78 | |
| E.5 BASIS FOR AWARD | 78 | |
| E.6 PROPOSAL SUBMISSION | 78 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C10B Peter Lewandowski Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.1 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (“FAR”), shall govern this Order. Commercial license agreements may be made a part of this Contract but only if both parties expressly make them an addendum. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap) or any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Order.; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Order. Federal law and regulation, including without limitation, the Contract Disputes Act (41 U.S.C. §601-613), the Anti-Deficiency Act (31 U.S.C. §1341 et seq.), the Competition in Contracting Act (41 U.S.C. §2304), the Prompt Payment Act (31 U.S.C. §3901, et seq.) and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control and render ineffective any inconsistent, conflicting or duplicative provision in any commercial license agreement. In the event of conflict between this clause and any provision in the Order or the commercial license agreement or elsewhere, the terms of this clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. § 516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Order must be made by order modification (Standard Form 30). Nothing in this Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.2 SOFTWARE LICENSE, MAINTENANCE AND TECHNICAL SUPPORT:
| (1) | Definitions. |
| (a) | Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.” |
| (b) | Licensor. The term “licensor” shall mean the contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “contractor” is the party identified in Block 17a on the SF1449. If the contractor is a reseller and not the Licensor, the contractor remains responsible for performance under this order. |
| (c) | Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services. |
| (d) | Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below. |
| (e) | Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise. |
| (f) | Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware. |
| (g) | Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6). |
| (2) | Software License |
| (a) | Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software |
| (b) | The Government may use the software in a networked environment. |
| (c) | Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d). |
| (d) | All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description. |
| (3) | Software Maintenance and Technical Support |
| (a) | If the Government desires to continue software maintenance and support beyond the period of performance identified in this contract or order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received the contractor is neither authorized nor permitted to renew any of the previously furnished services. |
| (b) | The contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the contractor to its commercial customers so as to cause the software to perform according to its specifications, documentation or demonstrated claims. |
| (c) | Any telephone support provided by contractor shall be at no additional cost. |
| (d) | The contractor shall provide all maintenance services in a timely manner in accordance with the contractor’s customary practice or as defined in the Performance Work Statement/Product Description. However, prolonged delay (exceeding 2 business days) in resolving software problems will be noted in the Government’s various past performance records on the contractor (e.g., www.ppirs.gov). |
| (e) | If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse. |
(4) Disabling Software Code. The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5) Manuals and Publications. Upon Government request, the contractor shall furnish the most current version of the user manual and publications for all products/services provided under this contract or order at no cost.
B.3 PRICE/DELIVERY SCHEDULE
BASE PERIOD
| LINE ITEM |
| DELIVERABLE DESCRIPTION |
QTY
UNIT
| UNIT PRICE |
| TOTAL |
| 0001 |
| Project Management shall be provided in accordance with (IAW) Performance Work Statement (PWS) paragraphs 4.1 through 4.1.2. |
Period of Performance shall be from September 12, 2018 to September 11, 2019.
The cost of FFP Contract Line Item Number (CLIN) 0001 and Subcontract Line Item (SLIN) 0001AB shall be included and allocated to all priced CLINs.
| 12 |
| MO |
| NSP |
| NSP |
| 0001AA |
| Roster of Contractor and Subcontractor employees to the COR for background investigations. |
Due three days after exercise of option.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR).
| 1 |
| LO |
| NSP |
| NSP |
| 0001AB |
| Monthly Progress Report IAW PWS paragraph 4.1.2. |
Due the fifth day each month throughout the period of performance.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR) and Contract Specialist (CS)
| 1 |
| LO |
| NSP |
| NSP |
| 0002 |
| Leased Multifunction Copiers IAW PWS paragraph 4.2 (quantity 16) through paragraph 4.4 and paragraph 4.6. |
This FFP CLIN includes all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, all disposal costs at contract conclusion, all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 4.2 and all its subparagraphs.
Period of Performance shall be from September 12, 2018 to September 11, 2019.
| 12 |
| MO |
| $ |
| $ |
| 0002AA |
| Operator’s Manual IAW PWS paragraph 4.2.2. |
Due at time of installation of each copier IAW PWS Section 4.2.2 Electronic submission to: VA Program Manager (PM), COR, CS
| 1 |
| LO |
| NSP |
| NSP |
| 0003 |
| Installation and Removals IAW PWS paragraph 4.4. |
The cost of FFP CLIN 0003 and SLIN 0003AA shall be included and allocated to all priced CLINs.
| 1 |
| LO |
| NSP |
| NSP |
| 0003AA |
| Written Verification of Removal for each site IAW PWS paragraph 4.4. |
Due within 30 days of contract expiration or after device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 0004 |
| Training IAW paragraph 4.5 of the PWS. |
On-site training in English shall take place within 5 days after installation at each site.
| 1 |
| LO |
| $ |
| $ |
| 0004AA |
| Training Session Materials for each site IAW PWS paragraph 4.5. |
Due within five days of contract expiration or prior to device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 0005 |
| Maintenance (Including Operational Standards and Performance) IAW PWS paragraph 4.7. |
Period of Performance shall be from September 12, 2018 to September 11, 2019.
| 12 |
| MO |
| $ |
| $ |
| 0005AA |
| Semiannual Preventive Maintenance Report for each location IAW PWS paragraph 4.7. |
Due semiannually within 15 business days after six months of usage.
| 2 |
| EA |
| NSP |
| NSP |
| 0006 |
| OPTIONAL TASK Copier Relocation IAW PWS paragraph 4.8. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 5.8.
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE 16 |
| EA |
| $ |
| $ |
| 0006AA |
| OPTIONAL TASK Copier Relocation Delivery Report IAW PWS paragraph 4.8. |
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Due ten days after each relocated copier installation.
| NTE16 |
| EA |
| NSP |
| NSP |
| 0007 |
| OPTIONAL TASK: Additional Copiers (up to 3) IAW PWS paragraph 4.9. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 4.9. This CLIN shall be priced based on a 12-month period of performance. However, the price of the optional task, if exercised, will be prorated based on the date the optional task is exercised.
This option may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE12 |
| MO |
| $ |
| $ |
| Base Period Total |
| $ |
OPTION PERIOD 1
| LINE ITEM |
| DELIVERABLE DESCRIPTION |
QTY
UNIT
| UNIT PRICE |
| TOTAL |
| 1001 |
| Project Management shall be provided in accordance with (IAW) Performance Work Statement (PWS) paragraphs 4.1 through 4.1.2. |
Period of Performance shall be from September 12, 2019 to September 11, 2020.
The cost of FFP Contract Line Item Number (CLIN) 1001 and Subcontract Line Item (SLIN) 1001AB shall be included and allocated to all priced CLINs.
| 12 |
| MO |
| NSP |
| NSP |
| 1001AA |
| Roster of Contractor and Subcontractor employees to the COR for background investigations. |
Due three days after exercise of option.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR).
| 1 |
| LO |
| NSP |
| NSP |
| 1001AB |
| Monthly Progress Report IAW PWS paragraph 4.1.2. |
Due the fifth day each month throughout the period of performance.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR) and Contract Specialist (CS)
| 1 |
| LO |
| NSP |
| NSP |
| 1002 |
| Leased Multifunction Copiers IAW PWS paragraph 4.2 (quantity 16) through paragraph 4.4 and paragraph 4.6. |
This FFP CLIN includes all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, all disposal costs at contract conclusion, all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 4.2 and all its subparagraphs.
Period of Performance shall be from September 12, 2019 to September 11, 2020.
| 12 |
| MO |
| $ |
| $ |
| 1002AA |
| Operator’s Manual IAW PWS paragraph 4.2.2. |
Due at time of installation of each copier IAW PWS Section 4.2.2 Electronic submission to: VA Program Manager (PM), COR, CS
| 1 |
| LO |
| NSP |
| NSP |
| 1003 |
| Installation and Removals IAW PWS paragraph 4.4. |
The cost of FFP CLIN 1003 and SLIN 1003AA shall be included and allocated to all priced CLINs.
| 1 |
| LO |
| NSP |
| NSP |
| 1003AA |
| Written Verification of Removal for each site IAW PWS paragraph 4.4. |
Due within 30 days of contract expiration or after device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 1004 |
| Training IAW paragraph 4.5 of the PWS. |
On-site training in English shall take place within 5 days after installation at each site.
| 1 |
| LO |
| $ |
| $ |
| 1004AA |
| Training Session Materials for each site IAW PWS paragraph 4.5. |
Due within five days of contract expiration or prior to device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 1005 |
| Maintenance (Including Operational Standards and Performance) IAW PWS paragraph 4.7. |
Period of Performance shall be from September 12, 2019 to September 11, 2020.
| 12 |
| MO |
| $ |
| $ |
| 1005AA |
| Semiannual Preventive Maintenance Report for each location IAW PWS paragraph 4.7. |
Due semiannually within 15 business days after six months of usage.
| 2 |
| EA |
| NSP |
| NSP |
| 1006 |
| OPTIONAL TASK Copier Relocation IAW PWS paragraph 4.8. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 5.8.
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE 16 |
| EA |
| $ |
| $ |
| 1006AA |
| OPTIONAL TASK Copier Relocation Delivery Report IAW PWS paragraph 4.8. |
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Due ten days after each relocated copier installation.
| NTE16 |
| EA |
| NSP |
| NSP |
| 1007 |
| OPTIONAL TASK: Additional Copiers (up to 3) IAW PWS paragraph 4.9. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 4.9. This CLIN shall be priced based on a 12-month period of performance. However, the price of the optional task, if exercised, will be prorated based on the date the optional task is exercised.
This option may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the option period.
| NTE12 |
| MO |
| $ |
| $ |
| Option Period One Total |
| $ |
OPTION PERIOD 2
| LINE ITEM |
| DELIVERABLE DESCRIPTION |
QTY
UNIT
| UNIT PRICE |
| TOTAL |
| 2001 |
| Project Management shall be provided in accordance with (IAW) Performance Work Statement (PWS) paragraphs 4.1 through 4.1.2. |
Period of Performance shall be from September 12, 2020 to September 11, 2021.
The cost of FFP Contract Line Item Number (CLIN) 2001 and Subcontract Line Item (SLIN) 2001AB shall be included and allocated to all priced CLINs.
| 12 |
| MO |
| NSP |
| NSP |
| 2001AA |
| Roster of Contractor and Subcontractor employees to the COR for background investigations. |
Due three days after exercise of option.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR).
| 1 |
| LO |
| NSP |
| NSP |
| 2001AB |
| Monthly Progress Report IAW PWS paragraph 4.1.2. |
Due the fifth day each month throughout the period of performance.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR) and Contract Specialist (CS)
| 1 |
| LO |
| NSP |
| NSP |
| 2002 |
| Leased Multifunction Copiers IAW PWS paragraph 4.2 (quantity 16) through paragraph 4.4 and paragraph 4.6. |
This FFP CLIN includes all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, all disposal costs at contract conclusion, all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 4.2 and all its subparagraphs.
Period of Performance shall be from September 12, 2020 to September 11, 2021.
| 12 |
| MO |
| $ |
| $ |
| 2002AA |
| Operator’s Manual IAW PWS paragraph 4.2.2. |
Due at time of installation of each copier IAW PWS Section 4.2.2 Electronic submission to: VA Program Manager (PM), COR, CS
| 1 |
| LO |
| NSP |
| NSP |
| 2003 |
| Installation and Removals IAW PWS paragraph 4.4. |
The cost of FFP CLIN 2003 and SLIN 2003AA shall be included and allocated to all priced CLINs.
| 1 |
| LO |
| NSP |
| NSP |
| 2003AA |
| Written Verification of Removal for each site IAW PWS paragraph 4.4. |
Due within 30 days of contract expiration or after device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 2004 |
| Training IAW paragraph 4.5 of the PWS. |
On-site training in English shall take place within 5 days after installation at each site.
| 1 |
| LO |
| $ |
| $ |
| 2004AA |
| Training Session Materials for each site IAW PWS paragraph 4.5. |
Due within five days of contract expiration or prior to device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 2005 |
| Maintenance (Including Operational Standards and Performance) IAW PWS paragraph 4.7. |
Period of Performance shall be from September 12, 2020 to September 11, 2021.
| 12 |
| MO |
| $ |
| $ |
| 2005AA |
| Semiannual Preventive Maintenance Report for each location IAW PWS paragraph 4.7. |
Due semiannually within 15 business days after six months of usage.
| 2 |
| EA |
| NSP |
| NSP |
| 2006 |
| OPTIONAL TASK Copier Relocation IAW PWS paragraph 4.8. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 5.8.
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE 16 |
| EA |
| $ |
| $ |
| 2006AA |
| OPTIONAL TASK Copier Relocation Delivery Report IAW PWS paragraph 4.8. |
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Due ten days after each relocated copier installation.
| NTE16 |
| EA |
| NSP |
| NSP |
| 2007 |
| OPTIONAL TASK: Additional Copiers (up to 3) IAW PWS paragraph 4.9. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 4.9. This CLIN shall be priced based on a 12-month period of performance. However, the price of the optional task, if exercised, will be prorated based on the date the optional task is exercised.
This option may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the option period.
| NTE12 |
| MO |
| $ |
| $ |
| Option Period Two Total |
| $ |
OPTION PERIOD THREE
| LINE ITEM |
| DELIVERABLE DESCRIPTION |
QTY
UNIT
| UNIT PRICE |
| TOTAL |
| 3001 |
| Project Management shall be provided in accordance with (IAW) Performance Work Statement (PWS) paragraphs 4.1 through 4.1.2. |
Period of Performance shall be from September 12, 2021 to September 11, 2022.
The cost of FFP Contract Line Item Number (CLIN) 3001 and Subcontract Line Item (SLIN) 3001AB shall be included and allocated to all priced CLINs.
| 12 |
| MO |
| NSP |
| NSP |
| 3001AA |
| Roster of Contractor and Subcontractor employees to the COR for background investigations. |
Due three days after exercise of option.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR).
| 1 |
| LO |
| NSP |
| NSP |
| 3001AB |
| Monthly Progress Report IAW PWS paragraph 4.1.2. |
Due the fifth day each month throughout the period of performance.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR) and Contract Specialist (CS)
| 1 |
| LO |
| NSP |
| NSP |
| 3002 |
| Leased Multifunction Copiers IAW PWS paragraph 4.2 (quantity 16) through paragraph 4.4 and paragraph 4.6. |
This FFP CLIN includes all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, all disposal costs at contract conclusion, all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 4.2 and all its subparagraphs.
Period of Performance shall be from September 12, 2021 to September 11, 2022.
| 12 |
| MO |
| $ |
| $ |
| 3002AA |
| Operator’s Manual IAW PWS paragraph 4.2.2. |
Due at time of installation of each copier IAW PWS Section 4.2.2 Electronic submission to: VA Program Manager (PM), COR, CS
| 1 |
| LO |
| NSP |
| NSP |
| 3003 |
| Installation and Removals IAW PWS paragraph 4.4. |
The cost of FFP CLIN 3003 and SLIN 3003AA shall be included and allocated to all priced CLINs.
| 1 |
| LO |
| NSP |
| NSP |
| 3003AA |
| Written Verification of Removal for each site IAW PWS paragraph 4.4. |
Due within 30 days of contract expiration or after device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 3004 |
| Training IAW paragraph 4.5 of the PWS. |
On-site training in English shall take place within 5 days after installation at each site.
| 1 |
| LO |
| $ |
| $ |
| 3004AA |
| Training Session Materials for each site IAW PWS paragraph 4.5. |
Due within five days of contract expiration or prior to device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 3005 |
| Maintenance (Including Operational Standards and Performance) IAW PWS paragraph 4.7. |
Period of Performance shall be from September 12, 2021 to September 11, 2022.
| 12 |
| MO |
| $ |
| $ |
| 3005AA |
| Semiannual Preventive Maintenance Report for each location IAW PWS paragraph 4.7. |
Due semiannually within 15 business days after six months of usage.
| 2 |
| EA |
| NSP |
| NSP |
| 3006 |
| OPTIONAL TASK Copier Relocation IAW PWS paragraph 4.8. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 5.8.
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the option period.
| NTE 16 |
| EA |
| $ |
| $ |
| 3006AA |
| OPTIONAL TASK Copier Relocation Delivery Report IAW PWS paragraph 4.8. |
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Due ten days after each relocated copier installation.
| NTE16 |
| EA |
| NSP |
| NSP |
| 3007 |
| OPTIONAL TASK: Additional Copiers (up to 3) IAW PWS paragraph 4.9. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 4.9. This CLIN shall be priced based on a 12-month period of performance. However, the price of the optional task, if exercised, will be prorated based on the date the optional task is exercised.
This option may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE12 |
| MO |
| $ |
| $ |
| Option Period Three Total |
| $ |
OPTION PERIOD FOUR
| LINE ITEM |
| DELIVERABLE DESCRIPTION |
QTY
UNIT
| UNIT PRICE |
| TOTAL |
| 4001 |
| Project Management shall be provided in accordance with (IAW) Performance Work Statement (PWS) paragraphs 4.1 through 4.1.2. |
Period of Performance shall be from September 12, 2022 to September 11, 2023.
The cost of FFP Contract Line Item Number (CLIN) 4001 and Subcontract Line Item (SLIN) 4001AB shall be included and allocated to all priced CLINs.
| 12 |
| MO |
| NSP |
| NSP |
| 4001AA |
| Roster of Contractor and Subcontractor employees to the COR for background investigations. |
Due three days after exercise of option.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR).
| 1 |
| LO |
| NSP |
| NSP |
| 4001AB |
| Monthly Progress Report IAW PWS paragraph 4.1.2. |
Due the fifth day each month throughout the period of performance.
Electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR) and Contract Specialist (CS)
| 1 |
| LO |
| NSP |
| NSP |
| 4002 |
| Leased Multifunction Copiers IAW PWS paragraph 4.2 (quantity 16) through paragraph 4.4 and paragraph 4.6. |
This FFP CLIN includes all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, all disposal costs at contract conclusion, all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 4.2 and all its subparagraphs.
Period of Performance shall be from September 12, 2022 to September 11, 2023.
| 12 |
| MO |
| $ |
| $ |
| 4002AA |
| Operator’s Manual IAW PWS paragraph 4.2.2. |
Due at time of installation of each copier IAW PWS Section 4.2.2 Electronic submission to: VA Program Manager (PM), COR, CS
| 1 |
| LO |
| NSP |
| NSP |
| 4003 |
| Installation and Removals IAW PWS paragraph 4.4. |
The cost of FFP CLIN 4003 and SLIN 4003AA shall be included and allocated to all priced CLINs.
| 1 |
| LO |
| NSP |
| NSP |
Written Verification of Removal for each site IAW PWS paragraph 4.4.
Due within 30 days of contract expiration or after device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 4004 |
| Training IAW paragraph 4.5 of the PWS. |
On-site training in English shall take place within 5 days after installation at each site.
| 1 |
| LO |
| $ |
| $ |
Training Session Materials for each site IAW PWS paragraph 4.5.
Due within five days of contract expiration or prior to device relocation.
| 1 |
| LO |
| NSP |
| NSP |
| 4005 |
| Maintenance (Including Operational Standards and Performance) IAW PWS paragraph 4.7. |
Period of Performance shall be from September 12, 2022 to September 11, 2023.
| 12 |
| MO |
| $ |
| $ |
Semiannual Preventive Maintenance Report for each location IAW PWS paragraph 4.7.
Due semiannually within 15 business days after six months of usage.
| 2 |
| EA |
| NSP |
| NSP |
| 4006 |
| OPTIONAL TASK Copier Relocation IAW PWS paragraph 4.8. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 5.8.
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the base period.
| NTE 16 |
| EA |
| $ |
| $ |
| 4006AA |
| OPTIONAL TASK Copier Relocation Delivery Report IAW PWS paragraph 4.8. |
This option may be exercised from time to time in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Due ten days after each relocated copier installation.
| NTE16 |
| EA |
| NSP |
| NSP |
| 4007 |
| OPTIONAL TASK: Additional Copiers (up to 3) IAW PWS paragraph 4.9. |
This FFP CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS 4.9. This CLIN shall be priced based on a 12-month period of performance. However, the price of the optional task, if exercised, will be prorated based on the date the optional task is exercised.
This option may be exercised in accordance with FAR 52.217-7 Option for Increased Quantity – Separately Priced Line Item Period of performance is from date option is exercised through the end of the option period.
| NTE12 |
| MO |
| $ |
| $ |
| Option Period Four Total |
| $ |
| GRAND TOTAL (Base Period + Options) |
| $ |
Multifunction Copier Services 36C10B18Q3092
Page 1 of Page 1 of Page 1 of
B.4 PERFORMANCE WORK STATEMENT
BACKGROUND
The Human Resources (HR) & Staffing Services (HR&SS) office serves the Veteran’s Health Administration (VHA) customers by providing a full range of HR services. HR&SS functions as a conglomerate of HR and Delegated Examining offices dispersed over a vast geographical area. HR&SS operates with centralized administrative support provided by hub offices and decentralized service execution by the field offices. This wide dispersion and virtual operating environment relies heavily on copy/print, scanning, and fax capabilities, and these services are in fact embedded in our business processes. HR&SS is in the forefront of implementing electronic delegated examining files, and the two HR Offices (VHA Central Office Servicing Human Resources Office (VSHO) and the Austin Human Resources Center (AHRC)) execute a large volume of copy/scanning action in support of electronic Official Personnel Records (eOPF). The hub offices support policy and planning operations and produce a variety of printed media and presentations for the Senior Executive Service (SES) level Director. These efforts require a robust and dependable multifunction device to maintain efficiencies, ensure quality products, and create value for our customers.
The Healthcare Recruitment and Marketing (HRM) Office promotes the recruitment and retention of healthcare professionals. The office is responsible for implementing VHA national medical marketing strategies, online recruitment programs, a national recruiter program, producing public service announcements, placing advertising in professional journals, and creating the VHA job internet site and the VHA Healthcare Recruiter’s Toolkit. The office has a demand for fast, efficient, high quality printing, scanning and faxing capability.
The Education Debt Reduction Program (EDRP) office is a National Program Office which repays education loans for health care professionals in certain hard to fill occupations. The office processes thousands of applications and maintains records/files for multiple years. High quality, reliable and efficient copying, faxing, scanning capabilities are critical functions within the office.
The Healthcare Talent Management (HTM) National Program Office supports VHA’s talent management on a number of fronts, including immediate and long-term succession planning; leadership and workforce development programs; scholarship, and internship programs; automation of HR processes and reporting; and enterprise-wide knowledge management. The office works in concert with the Succession and Workforce Development Management Subcommittee (SWDMS) of the national Workforce Committee (WC). The HTM office is committed to excellence and customer service. The office must have access to copiers that are dependable and capable of producing high quality, efficient copying, faxing and scanning services.
1.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541, “Federal Information Security Management Act (FISMA) of 2002”
2. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
3. FIPS Pub 201, “Personal Identity Verification of Federal Employees and Contractors,” March 2006
4. 10 U.S.C. § 2224, "Defense Information Assurance Program"
5. Software Engineering Institute, Software Acquisition Capability Maturity Modeling (SA CMM) Level 2 procedures and processes
6. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
7. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
8. Department of Veterans Affairs (VA) Directive 0710, “Personnel Suitability and Security Program,” May 18, 2007
9. VA Directive 6102, “Internet/Intranet Services,” July 15, 2008
10. 36 C.F.R. Part 1194 “Electronic and Information Technology Accessibility Standards,” July 1, 2003
11. OMB Circular A-130, “Management of Federal Information Resources,” November 28, 2000
12. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
13. An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule, October 2008
14. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended by the Workforce Investment Act of 1998 (P.L. 105-220), August 7, 1998
15. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
16. VA Directive 6500, “Managing Information Security Risk: VA Information Security Program,” September 20, 2012
17. VA Handbook 6500, “Risk Management Framework for VA Information Systems – Tier 3: VA Information Security Program,” September 20, 2012
18. VA Handbook 6500.1, “Electronic Media Sanitization,” March 22, 2010
19. VA Handbook 6500.2, “Management of Data Breaches Involving Sensitive Personal Information (SPI)”, January 6, 2012
20. VA Handbook 6500.3, “Certification and Accreditation of VA Information Systems,” November 24, 2008
21. VA Handbook, 6500.5, “Incorporating Security and Privacy in System Development Lifecycle” March 22, 2010
22. VA Handbook 6500.6, “Contract Security,” March 12, 2010
23. Technical Reference Model (TRM) (reference at https://www.voa.va.gov/)
24. National Institute Standards and Technology (NIST) Special Publications
25. VA Directive 6508, VA Privacy Impact Assessment, October 3, 2008
26. VA Directive 6300, Records and Information Management, February 26, 2009
27. VA Handbook, 6300.1, Records Management Procedures, March 24, 2010
28. OMB Memorandum, “Transition to IPv6”, September 28, 2010
2.0 SCOPE OF WORK
The contractor shall be responsible for the delivery, installation and maintenance of 16 leased copiers throughout the United States. The monthly base price per unit shall include all travel, training, toner, staples, drum, waste container, training manuals, customer service/call center coverage, and all disposal costs at contract conclusion. The contractor shall deliver and install copiers (to include working in conjunction with the VHA Office of Information and Technology staff to ensure proper network connections) for all 12 locations by September 12, 2018.
3.0 PERFORMANCE DETAILS
3.1 PERFORMANCE PERIOD
The period of performance shall be 12 months from date of award, with four 12-month options.
There are 10 Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, four are set by date:
| New Year's Day | January 1 |
| Independence Day | July 4 |
| Veterans Day | November 11 |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January | |||
| Washington's Birthday | Third Monday in February | |||
| Memorial Day | Last Monday in May | |||
| Labor Day | First Monday in September | |||
| Columbus Day | Second Monday in October | |||
| Thanksgiving | Fourth Thursday in November |
3.2 PLACE OF PERFORMANCE
Tasks under this PWS shall be performed in VA facilities located in the following locations:
COPIER LOCATIONS:
| Organization |
| QTY |
| Point of Contact |
| Location |
| HRMACS Austin |
| 2 |
| Larry Singleton |
Frances Alonso 512-326-6161 501-981-4711 615 Woodward Street Austin, TX 78772
| HROO Coatesville |
| 1 |
| Cheri Fuchs 610-384-7711 x4668 |
| 1400 BlackHorse Hill Rd Building 16, Floor 2, Rm 219 Coatesville, PA 19320 |
| HROO Duluth |
| 1 |
| Alex Lee |
Andrew Jones 678-924-5780 3700 Crestwood PKWY NW Suite 250 Duluth, GA 30096
| HROO Indianapolis |
| 1 |
| Wendi Ratliff |
Valerie Williams Rafael Gonzalez 317-988-1894 2669 Cold Spring Road Building 41 Indianapolis, IN 46222
| HROO Los Angeles |
| 1 |
| Linette Charles |
Francesca Gambula 310-268-4150 11301 Wilshire Blvd. Building 258, Room 128 Los Angeles, CA 90073
| WMC NOLA |
| 1 |
| Cabrina Armstrong-Phillips |
Lindsey Millet 504-507-4902 1250 Poydras Street Suite 1000 New Orleans, LA 70113
| WMC Little Rock |
| 1 |
| Tesha Johnson |
Jeanne Dehart 501-257-4028 501-257-4023 2200 Fort Roots Drive Building 106 North Little Rock, AR 72120
| HROO Sherwood |
| 2 |
| Thomas Newton |
Jacinda Summers 501-918-3259 2402 Wildwood Ave Suite 301 Sherwood, AR 72120
| HCSS Oklahoma City |
| 2 |
| Jana Waterhouse |
Chris Jaqua 405-552-4330 405-552-4345 55 N. Robinson Ave Suite 1010 Oklahoma City, OK 73102
| HROO Topeka |
| 1 |
| Marva Smith |
Edwin Hailey 785-350-3891 Townsite II, 120 SW 6th Street Suite 102 (05/DEU) Topeka, KS 66604
| HROO Ann Arbor |
| 2 |
| Sherry Rice |
Cherly Barbas 734-474-2133 24 Frank Lloyd Right Drive Lobby H, Level 3, Suite 3400 Ann Arbor, MI 48105
| HROO St. Petersburg |
| 1 |
| Thomas Newton |
Jacinda Summers 501-918-3259 140 Fountain Parkway Suite 220 St Petersburg, FL 33716
| Total |
| 16 |
SCHEDULE FOR DELIVERABLES
Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination
Special Shipping Instructions:
Prior to shipping, Contractor shall notify Site POCs, by phone followed by email, of all incoming deliveries including line-by-line details for review of requirements. Contractor shall not make any changes to the delivery schedule at the request of Site POC.
Contractors shall coordinate deliveries with Site POCs before shipment of hardware to ensure sites have adequate storage space.
All shipments, either single or multiple container deliveries, will bear the VA Purchase Order number on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA PO number shall indicate total number of containers for the complete shipment (i.e. “Package 1 of 2”), clearly readable on manifests and external shipping labels.
Packing Slips/Labels and Lists shall also include the following:
IFCAP PO #: ____________ (i.e., 166-E11234 (the IFCAP PO number is located in block #20 of the SF 1449)) Total number of Containers: Package ___ of ___. (i.e., Package 1 of 3)
POINTS OF CONTACT
VA Program Manager/Contracting Officer’s Representative:
Name: Cabrina Armstrong-Phillips Address:1250 Poydras Street, Suite #1000 New Orleans, LA 70113
| Voice: | 504.565.4902 |
| Email: | Cabrina.Phillips@va.gov |
Contracting Officer:
Name: Peter Lewandowski Address: Department of Veterans Affairs Office of Acquisition and Logistics Technology Acquisition Center 23 Christopher Way Eatontown, NJ 07724
| Voice: | (732) 440-9640 |
| Email: | Peter.Lewandowski@va.gov |
Contract Specialist:
Name: William Freer Address: Department of Veterans Affairs Office of Acquisition and Logistics Technology Acquisition Center 23 Christopher Way Eatontown, NJ 07724
| Voice: | (732) 795-1063 |
| Email: | William.Freer@va.gov |
ADDITIONAL ITEMS
1. The Security Investigations Center will require the following forms from the Contractor or to the Contractor’s personnel:
1. Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations. The roster shall contain the Contractor’s Full Name, Full Social Security Number, Date of Birth, Place of Birth, and individual background investigation level requirement (based upon Section 5.2 Tasks).
1. The Contractor should coordinate the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized.
1. For a Low Risk designation, the following forms are required to be completed: 1. OF-306 and 2. DVA Memorandum – Electronic Fingerprints. For Moderate or High Risk, the following forms are required to be completed: 1. VA Form 0710 and 2. DVA Memorandum – Electronic Fingerprints. These should be submitted to the COR within 5 business days after award. (DVA Memorandum – Electronic Fingerprints is filled out by the VA Facility that took the electronic fingerprints)
1. The Contractor personnel will receive an email notification from the Security and Investigation Center (SIC), through the Electronics Questionnaire for Investigations Processes (e-QIP) identifying the website link that includes detailed instructions regarding completion of the investigation documents (SF85, SF85P, or SF 86). (The SF85 does not need to be uploaded because OPM is going paperless and the contractor will complete this questionnaire online when the e-QIP link is sent.) (DVA Memorandum – Electronic Fingerprints is filled out by the VA Facility that took the electronic fingerprints) (Please be advised that the contractor will need all the necessary information easily accessible as the website will time out and they can lose the information they inputted if they take too long to fill it in.)The Contractor personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP).
1. The Contractor is to certify and release the e-QIP document, print and sign the signature pages, and send them to the COR for electronic submission to the SIC. These should be submitted to the COR within 3 business days of receipt of the e-QIP notification email.
1. The SIC will then upload the e-QIP signature pages to e-QIP and release the case file to OPM for investigation.
1. The SIC will notify the CO and Contractor after adjudicating the results of the background investigations received from OMB.
3.3 TRAVEL
The Government does not anticipate travel under this effort.
B.5 SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following:
4.1 PROJECT MANAGEMENT
4.1.1 CONTRACTOR PROJECT MANAGEMENT
The Contractor shall assign a single point of contact to coordinate with the contracting officer and/or designated Contracting Officer’s Representative (COR) in all aspects of this contract. The Contractor shall provide point of contact’s name, title, business address, phone number and email address.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations. The roster shall contain the Contractor’s Full Name, Full Social Security Number, Date of Birth, Place of Birth, and individual background investigation level requirement (based upon Section 5.2 Tasks).
4.1.2 REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.