This document is a draft solicitation for the Department of Veterans Affairs (VA) to acquire Plain old Telephone Service (POTS) replacement services utilizing the General Services Administration's (GSA) Enterprise Infrastructure Solutions (EIS) contract. The solicitation has a base period from date of award to September 30, 2024, with eight one-year option periods and one six-month extension of services, if exercised. The VA is seeking services such as Internet Protocol Service, Broadband Internet Service, Cable & Wiring, Wireless Service, Managed Network Service, Service-Related Equipment, Internet Protocol Voice Service, and Circuit Switched Voice Service. Pricing will be based on the EIS contract, with economic price adjustments and provisions for assigning new network site codes to pricing hubs. The solicitation includes detailed technical, security, delivery, and administrative requirements. Offerors will be evaluated on technical design, service delivery, operations, past performance, and veteran involvement. Offers are due by 10:00 CDT on April 19, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 36C10A24R0003 VA POTS Replacement

VA
01/11/2024

Department of Veterans Affairs

SOLICITATION NUMBER: 36C10A24R0003

for VA POTS Replacement

Using the General Services Administration EIS Contract

DRAFT: Version 6.c.3 04/17/2024

Table of Contents

ASolicitation/Contract Form Continued1
A.1Description1
BSupplies or Services and Prices/Costs2
B.1Inclusive Pricing of Services2
B.2Governing Law8
B.3Economic Price Adjustments9
B.4Special Considerations for Assigning NSCs to PHubs9
B.5Pricing Workbook9
B.6General Pricing Requirements9
B.7Service References10
B.7.1Internet Protocol Service10
B.7.2Broadband Internet Service (BIS)10
B.7.3Cable & Wiring10
B.7.4Wireless Services11
B.7.5Managed Network Service (MNS)11
B.7.6Service Related Equipment11
B.7.7Internet Protocol Voice Service11
B.7.8Circuit Switched Voice Service11
B.8TO Unique CLINs (TUCs)11
B.8.1General Pricing and Other Requirements (GEN)11
B.8.1.1Expedited Service Provisioning Intervals11
CRequirements15
C.1Service(s) Sought.15
C.2Project Title16
C.3Project Overview16
C.4Project Background16
C.5Description of Current Environment16
C.6Project Scope17
C.7Functional Requirements17
C.8Internet Protocol Service (IPS)18
C.8.1Connectivity18
C.8.2Technical Capabilities18
C.8.3Features18
C.8.4Performance Metrics18
C.9Broadband Internet Service (BIS)19
C.9.1Connectivity19
C.9.2Technical Capabilities19
C.9.3Interfaces19
C.9.4Features19
C.9.5Performance Metrics19
C.10Cable and Wiring Service (CWS)19
C.10.1Technical Capabilities20
C.10.1.1.1CW Internal to Service Delivery Point21
C.10.1.1.2CW Outside Minimum Point of Entry (Demarc)22
C.10.2Features22
C.10.3Performance Metrics22
C.11Wireless Service (MWS)23
C.11.1Connectivity23
C.11.2Technical Capabilities23
C.11.3Features23
C.11.4Performance Metrics24
C.12Managed Network Service (MNS)24
C.12.1Connectivity24
C.12.2Technical Capabilities24
C.12.3Features25
C.12.4Performance Metrics25
C.13Service-Related Equipment (SRE)25
C.14Circuit Switched Voice Service (CSVS)25
C.14.1Connectivity25
C.14.2Technical Capabilities25
C.14.3Features26
C.14.4Performance Metrics26
C.15Internet Protocol Voice Service (IPVS)26
C.15.1Connectivity26
C.15.2Technical Capabilities26
C.15.3Features26
C.15.4Performance Metrics27
C.16Security Requirements27
C.16.1Personnel Security Clearances27
C.17Alternative Solutions27
C.18Enterprise Telecommunications Expense Management Solution (eTEMS) Ordering and Billing Support27
C.18.1.1eTEMS Background28
C.18.1.2eTEMS Ordering and Contractors Business Support System (BSS)28
C.18.1.3Contractor BSS Data Field Requirements29
C.18.1.4Data Rights30
C.18.1.5VA Use of Contractor Ordering System30
C.19Enterprise and IT Framework Requirements30
C.19.1VA Technical Reference Model30
C.19.2Federal Identity, Credential, and Access Management (FICAM)30
C.19.3Internet Protocol Version 6 (IPV6)32
C.19.4Trusted Internet Connection (TIC)32
C.19.5Standard Computer Configuration32
C.19.6Veteran Focused Integration Process (VIP)33
C.19.7Process Asset Library (PAL)33
C.20Security Requirements33
C.20.1VA Security and Privacy Requirements33
C.20.1.1Position/Task Risk Designation Level(s)34
C.20.2Contractor Personnel Security Requirements35
C.20.3Personnel Background Investigation Requirements36
C.20.4Protection of Government Information37
C.20.5Confidentiality and Non-Disclosure37
C.20.6Personnel Security Clearances39
C.20.7Section 508 Accessibility39
C.21Applicable Documents39
DPackaging and Marking40
EInspection and Acceptance41
E.1Acceptance41
E.2Review of Deliverables41
FDeliveries or Performance42
F.1Performance42
F.2Place of Performance42
F.3VA TO Specific Deliverables42
F.4Service Level Agreement Report (SLAR) Deliverables43
F.5List of EIS Required Task Order Deliverables44
F.6Performance Monitoring46
GContract Administration48
G.1Contract Administration Data48
G.2Contract Administration Terms48
G.2.1VAAR 852.232-72 Electronic Submission of Payment Requests (NOV 2018)48
G.2.2VAAR 852.201-70 Contracting Officers Representative (Dec 2022)49
G.2.3VA Specific Task Order Administration50
G.2.4Accounting and Appropriation Data50
G.3Ordering50
G.4Requirements for Billing51
G.5Business Support Systems (BSS)51
G.6Service Assurance51
G.6.1Requirements to Support Task Order51
G.6.2Ordering for Services by Authorized Person(s)51
G.6.3Requirements for Deliverables and Data Exchange52
G.6.4Facility/Resource Provisions52
G.6.5Department of Homeland Security Office of Emergency Communications Priority Telecommunications Services53
G.7Inventory Management54
G.8Service Level Management54
G.8.1Task Order Specific Service Level Agreements (SLA)54
G.9Program Management58
G.10Training59
G.11National Security and Emergency Preparedness59
G.12Requirements for Climate Change Adaptation, Sustainability and Green Initiatives59
HSpecial Contract Requirements60
H.1Acquisition Selected60
H.2Period of Performance60
H.3Place of Performance60
H.4Price Management60
H.5Option for Increased Quantities61
H.6Option for Increased Quantity-Separately Priced Line Item61
H.7Accommodating Expected Moves, Adds, Changes, Additional Quantities, and New Locations.62
IContract Clauses63
I.1FAR 52.217-8 Option to Extend Services (Nov 1999)63
I.2FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000)63
I.3FAR 52.237-3 Continuity of Service (Jan 1991)63
I.4VAAR 852.203-70 Commercial Advertising (MAY 2018)64
I.5VAAR 852.215-70 Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors. (JAN 2023) (DEVIATION)64
I.6VAAR 852.215-71 Evaluation Factor Commitments. (OCT 2019)64
I.7852.219-70 VA Small Business Subcontracting Plan Minimum Requirements (JAN 2023) (DEVIATION)65
I.8VAAR 852.237-76 Key Personnel (OCT 2019)65
I.9VAAR 852.239-70 Security Requirements for Information Technology Resources (FEB 2023)66
I.10VAAR 852.239-72 Information System Design and Development (FEB 2023)68
I.11VAAR 852.239-75 Information and Communication Technology Accessibility Notice (FEB 2023)68
JList of Attachments70
Security Assessment and Authorization (formerly known as Certification and Accreditation [C&A]) Requirements70
Network Interface Diagrams70
J.1.1Analog/POTS Lines Diagram71
J.1.2Fax Lines Diagram71
J.1.3Security Alarms Diagram71
J.1.4Elevators Diagram71
J.1.5IPVS Network Interface Diagram72
J.1.6MNS Network Interface Diagram73
J.1.7MWS Network Interface Diagram74
KRepresentations, Certifications, and Other Statements of Offerors or Respondents76
LInstructions, Conditions, and Notices to Offerors or Respondents77
L.1Solicitation Closing Date and Time77
L.2Preparation and Delivery Instructions77
L.3Exceptions78
L.4Authorized Official and Submission of Proposal79
L.5Assumptions and Conditions79
L.6Task Order79
L.7Detailed Instructions – Price Proposal79
L.7.1Price Proposal – Alternative Solutions81
L.8Detailed Instructions – Technical Proposal81
L.8.1Factor 1: Technical Design and Approach82
L.8.1.1Transition Sub-Factor82
L.8.1.2Technical Design Sub-Factor82
L.8.1.3Network & Cyber Security Sub-Factor83
L.8.1.4Performance & Availability Sub-Factor84
L.8.1.5Related SRE Sub-Factor84
L.8.2Factor 2: Service Delivery, Operations and Management Approach85
L.8.2.1Management Approach Sub-Factor85
L.8.2.2Staffing Approach Sub-Factor85
L.8.3Factor 3: Past Performance86
L.8.4Factor 4: Veterans Involvement87
L.9Service of Protest (Sep 2006)87
L.10852.233-70 Protest Content/Alternative Dispute Resolution (Sep 2018)87
L.11852.233-71 Alternate Protest Procedure (SEP 2018).88
MEvaluation Factors for Award89
M.1Evaluation Type89
M.2Technical Evaluation Criteria90
M.2.1Factor 1: Technical Design and Approach90
M.2.1.1Transition Sub-Factor91
M.2.1.2Technical Design Sub-Factor91
M.2.1.3Network & Cyber Security Sub-Factor91
M.2.1.4Performance & Availability Sub-Factor91
M.2.1.5Related SRE Sub-Factor91
M.2.2Factor 2: Service Delivery, Operations and Management Approach91
M.2.2.1Management Approach Sub-Factor91
M.2.2.2Staffing Approach Sub-Factor92
M.2.3Factor 3: Past Performance93
M.2.4Factor 4: Veterans Involvement93
M.3Price Evaluation Criteria94
M.3.1Price Evaluation – Alternative Solutions94

1. THIS CONTRACT IS A RATED ORDER

RATING

PAGE OF

PAGES

UNDER DPAS (15 CFR 700)

2. CONTRACT NUMBER

3. SOLICITATION NUMBER

4. TYPE OF SOLICITATION

5. DATE ISSUED

6. REQUISITION/PURCHASE NUMBER

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

(If other than Item 7) NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

9. Sealed offers in original and _____________________________ copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until local time _______________________ (Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All Offers are subject to all terms and conditions contained in this solicitation.

A. NAME

B. TELEPHONE (NO COLLECT CALLS)

C. E-MAIL ADDRESS

AREA CODE

NUMBER

EXTENSION

(X)

SEC.

DESCRIPTION

PAGE(S)

(X)

SEC.

DESCRIPTION

PAGE(S)

PART I - THE SCHEDULE

PART II - CONTRACT CLAUSES

A

SOLICITATION/CONTRACT FORM

I

CONTRACT CLAUSES

B

SUPPLIES OR SERVICES AND PRICES/COSTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C

DESCRIPTION/SPECS./WORK STATEMENT

J

LIST OF ATTACHMENTS

D

PACKAGING AND MARKING

PART IV - REPRESENTATIONS AND INSTRUCTIONS

E

INSPECTION AND ACCEPTANCE

F

DELIVERIES OR PERFORMANCE

G

CONTRACT ADMINISTRATION DATA

L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

H

SPECIAL CONTRACT REQUIREMENTS

M

EVALUATION FACTORS FOR AWARD

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ________ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

10 CALENDAR DAYS (%)

20 CALENDAR DAYS (%)

30 CALENDAR DAYS (%)

CALENDAR DAYS (%)

(See Section I, Clause No. 52-232-8)

14. ACKNOWLEDGEMENT OF AMENDMENTS

AMENDMENT NO.

DATE

AMENDMENT NO.

DATE

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

UEI:

EFT:

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15A. NAME AND

ADDRESS OF

OFFEROR

(Type or print)

15B. TELEPHONE NUMBER

17. SIGNATURE

18. OFFER DATE

AREA CODE

NUMBER

EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE.

19. ACCEPTED AS TO ITEMS NUMBERED

20. AMOUNT

21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

(4 copies unless otherwise specified) 10 U.S.C. 2304(c) 41 U.S.C. 3304(a) ( )

24. ADMINISTERED BY (If other than Item 7)

25. PAYMENT WILL BE MADE BY

CODE

PHONE:

FAX:

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

(Signature of Contracting Officer)

(REV. 6/2014)

10. FOR INFORMATION CALL:

11. TABLE OF CONTENTS

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 33

Previous edition is unusable Prescribed by GSA-FAR (48 CFR) 53.214(c)

SOLICITATION, OFFER AND AWARD

SOLICITATION

OFFER (Must be fully completed by offeror) AWARD (To be completed by Government)

TAC

N/A

36C10A24R0003

X

Technology Acquisition Center

23 Christopher Way Eatontown NJ 07724 Department of Veterans Affairs Technology Acquisition Center

23 Christopher Way Eatontown NJ 07724 10:00

CDT

04-19-2024 Anthony Browner 512-981-4219 Anthony.browner@va.gov See Attached Table of Contents X

X

X

X

X

X

X

X

X

X

X

Technology Acquisition Center

23 Christopher Way Eatontown NJ 07724 Y Department of Veteran Affairs Financial Services Center P.O. Box 149971

Austin TX 78714-8971

(877) 353-9791

Solicitation Number: 36C10A24R0003

Solicitation/Contract Form Continued Description The purpose of this Task Order (TO) is to provide the Department of Veterans Affairs (VA) with Plain old Telephone Service (POTS) replacement services as defined in Section B, for the duration of the period of performance defined in this order. This TO is placed in accordance with the General Service Administration (GSA) Enterprise Infrastructure Solutions (EIS) Indefinite Delivery Indefinite Quantity contract vehicle.

Supplies or Services and Prices/Costs Inclusive Pricing of Services

Any equipment, material, facility, site preparation, or service required in the performance of this task order for which a price is not specifically identified in the price proposal shall be considered to be included in the price of another item or provided at no cost to the government, except as otherwise provided for in this fair opportunity solicitation.

CLIN
Description of Supplies/Services
QTY
Unit of Issue
Unit Price
Total

Base Period – Date of Award – September 30, 2024.

0001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$0.00
$0.00
Base Period Subtotal
$ 0.00

Option Period One: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2024 – September 30, 2025.

1001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period One Subtotal
$

Option Period Two: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2025 – September 30, 2026.

2001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period TWO Subtotal
$

Option Period Three: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2026 – September 30, 2027.

3001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period THREE Subtotal
$

Option Period Four: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2027 – September 30, 2028.

4001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$

Option Period FOUR Subtotal

Option Period Five: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2028 – September 30, 2029

5001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period Five Subtotal
$

Option Period Six: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2029 – September 30, 2030.

6001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period SIX Subtotal
$

Option Period Seven: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2030 – September 30, 2031

7001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period SEVEN Subtotal
$

Option Period eight: Option for an additional 12 months of service IAW FAR 52.217-9, “Option to Extend the Term of the Contract” – October 01, 2031 – July 30, 2032

8001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option Period SEVEN Subtotal
$

Option for an additional 6 months of service IAW FAR 52.217-8, “Option to Extend Services” – 6 Months. The Government may unilaterally exercise at one time or multiple times.

9001
POTS Replacement Services

The Contractor shall provide services as defined in Section C Statement of Work.

- Non-Recurring Cost (NRC)

- Monthly Recurring Charge (MRC)

- Usage

The quantities identified in this section represent not to exceed amounts based on the individual breakout identified in Section J Attachment Pricing Workbook.

1
LOT
$
$
Option to Extend Service Subtotal
$

Economic Price Adjustments The task order prices have to be at or below the EIS refreshed prices in the years starting July 2022-July 2027 and July 2027-July 2032. The task order prices cannot exceed the EIS contract refreshed prices. If the task order prices exceed the EIS contract refreshed prices then the CLIN price will be adjusted via a task order modification to match the EIS contract refreshed price, and/or the refresh prices will match the discount(s) provided in the original order proposals.

Special Considerations for Assigning NSCs to PHubs

If the contractor assigns a new VA building NSC (Network Site Code) to an existing PHub (Pricing Hub) or to a new PHub, the contractor shall submit an EIS contract modification to GSA. If awarded by GSA, then the TO will need to be modified to add the new access prices at rates mutually agreed upon by the contractor and agency but not to exceed the contract rates awarded by GSA.

Pricing Workbook The contractor shall enter prices using the Pricing workbook provided in Section J.1 of this solicitation.

General Pricing Requirements The Contractor shall deliver in accordance with the price schedule references for the services, related priced features described in Section C – Statement of Work (SOW) of this TO. The Pricing Workbook(s) identifies specific CLINs within each service; however, all EIS contract prices are applicable to the TO. Post-award implementation decisions that are within the broad scope and necessary to meet the overall objectives of the TO may necessitate VA modify the Pricing Workbook to include additional EIS contract CLINs than those specifically built into the price model. In these circumstances, VA will negotiate with the Contractor a bi-lateral modification that updates Section B and the Pricing Workbook.

Any equipment, material, facility, site preparation, labor, training, or service required in the performance of this TO for which a price is not specifically identified in the price tables will be considered to be included in the price of another item or provided at no additional cost to the Government, except as otherwise provided for in this TO. The Contractor may waive any charge at any time.

The quantities contained in the Section J.1Pricing Workbook(s) are estimates that derive the minimum totals dollar value for each period. VA intends to obligate the minimum total dollar value for each period at time of award or at time of option exercise, if VA unilaterally exercises an option period. Actual quantities may vary during the VA TO performance period and will be based on actual SOs placed. VA reserves the right to issue within scope modifications for additional quantities as needed. The quantities for optional CLINs and/or option periods contained in the tables found in Section J.1 Pricing Workbook(s) are VA's best estimates and are not a guarantee of future requirements, and actual quantities ordered placed on SOs for optional CLINs and/or option periods may vary during the TO performance period.

Service References The following table provides a list of section references for the services being sought by this solicitation. For each service, the corresponding Section B and Section C references in the EIS contract as well as this solicitation are listed, along with an indication of whether the service is mandatory or optional to order.

Table B.1VA EIS Services

Service
Service ID
EIS Contract References
Agency Solicitation

References Mandatory or Optional

Sec B
Sec C
Sec B
Sec C
Internet Protocol Service
IPS
B.2.1.7
C.2.1.7
B.7.1
C.8
Optional
Broadband Internet Services
BIS
B.2.1.8
C.2.1.8
B.7.2
C.9
Optional
Cable & Wiring
CW
B.2.12
C.2.12
B.7.3
C.10
Optional
Wireless Service
MWS
B.2.6
C.2.6
B.7.4
C.11
Optional
Managed Network Services
MNS
B.2.8.1
C.2.8.1
B.7.5
C.12
Mandatory
Service-Related Equipment
SRE
B.2.10
C.2.10
B.7.6
C.13
Optional
Internet Protocol Voice Service
IPVS
B.2.2.1
C.2.2.1
B.7.7
C.14
Optional
Circuit Switched Voice Service
CSVS
B.2.2.2
C.2.2.2
B.7.8
C.15
Optional

Internet Protocol Service (IPS)

The technical requirements for IPS are specified in Section C.8 and all subsections, as applicable, of this TO. The Contractor shall use the CLINs defined in Section B.2.1.7 of the EIS Contract and in Table B-6 below for IPS pricing.

NRC CLIN
MRC CLIN
Description
Charging Unit
Case Number
Notes
IP99990
IP10015
T3 subrate 20 Megabits per second Mbps port w/ Managed (Mgd) Router
ICB
VA- IP FT3 20m
MRC CLIN is the standard EIS CLIN fFT3–24 Mbps
IP99990
IP10049
Port w/Mgd Router, Ethernet 100Mbps
ICB
VA- IP 100m
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10043
Port w/Mgd Router, Ethernet 50Mbps
ICB
VA- IP 50m
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10040
Port w/Mgd Router, Ethernet 20Mbps
ICB
VA- IP 20m
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10003
Port w/Mgd Router, FT3 (4xDS1)
ICB
VA- IP FT3
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10002
Port w/Mgd Router, FT3 (2xDS1)
ICB
VA- IP FT3
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10001
Port w/Mgd Router, T1
ICB
VA- IP T1
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP10019
Port w/Mgd Router, T3
ICB
VA- IP T3
MRC CLIN is the standard EIS CLIN for the speed provided
IP99990
IP99991
Additional Static IP Address
ICB
VA- ADDITIONAL STATIC IP ADDRESSES
IP99990
IP99991
5 Static IP Addresses
ICB
VA- 5 STATIC IP ADDRESSES
IP99990
IP99991
1 Static IP Addresses
ICB
VA- 1 STATIC IP ADDRESS
IP99990
IP99991
Static IP Addresses
ICB
VA- STATIC IP ADDRESSES

Broadband Internet Service (BIS)

The Contractor shall provide Broadband Internet Service (BIS) per Section C.2.1.8 of the EIS contract and Section C.9 in the SOW. The Contractor shall use the CLINs defined in Section B.2.1.8 of the EIS Contract for BIS pricing.

Cable & Wiring The Contractor shall provide Cable and Writing (CW) per Section C.2.12 of the EIS Contract and Section C.10 in the SOW. The Contractor shall use the CLINs defined in Section B.2.12 of the EIS Contract when proposing CW pricing.

Wireless Services (MWS) The Contractor shall provide Wireless Service per Section C.2.6 of the EIS Contract and Section C.11 in the SOW. The Contractor shall use the CLINs defined in Section B.2.6 of the EIS Contract when proposing MWS pricing.

Managed Network Service (MNS)

The Contractor shall provide Manage Network Service (MNS) per Section C.2.8.1 of the EIS Contract and Section C.12 in the SOW. The Contractor shall use the CLINs defined in Section B.2.8.1 of the EIS Contract when proposing IPVS pricing.

Service Related Equipment (SRE) The Contractor shall provide Service Related Equipment (SRE) per Section C.2.10 of the EIS Contract and Section C.13 in the SOW. The Contractor shall use the CLINs defined in Section B.2.10 of the EIS Contract when proposing SRE pricing.

Internet Protocol Voice Service The Contractor shall provide Internet Protocol Voice Service (IPVS) per Section C.2.2.1 of the EIS Contract and Section C.14 in the SOW. The Contractor shall use the CLINs defined in Section B.2.2.1 of the EIS Contract when proposing IPVS pricing.

Circuit Switched Voice Service The Contractor shall provide Circuit Switched Voice Service (CSVS) per Section C.2.2.2 of the EIS Contract and Section C.14 in the SOW. The Contractor shall use the CLINs defined in Section B.2.2.2 of the EIS Contract when proposing CSVS pricing.

Task Order Unique CLINs (TUCs)

In accordance with the EIS Contract, the Contractor shall provide Task Order Unique CLINS (TUCs) for delivery of services as defined in Section C of this TO when applicable and approved by the OCO.

General Pricing and Other Requirements (GEN)

The Contractor shall use the definitions, requirements, and CLINS defined in Section B.4.1.14 of the EIS Contract.

A.1.1.1 Expedited Service Provisioning Intervals

The Contractor shall provide priority provisioning to meet internal project schedule requirements. Approximately 1,500 SOs (or less than 25 percent) are expedited annually. Expedited SOs are listed in Table B-7 General TUC Pricing Reference and their associated AAs. The following cases apply to each of the services listed:

1) New service/feature initiation with direct circuit involvement, but no local coordination, T1/E1 or above but less than T3/E3

2) New service/feature initiation with direct circuit involvement and one local coordination, T1/E1 or above but less than T3/E3

3) Additional charge for expedite of each additional local coordination in the Service Order, T1/E1 or above but less than T3/E3

4) Due date change of an expedite with direct circuit involvement, but no local coordination, T1/E1 or above but less than T3/E3

5) New service/feature initiation with direct circuit involvement, but no local coordination >=T3/E3

6) New service/feature initiation with direct circuit involvement and one local coordination >=T3/E3

7) Additional charge for expedite of each additional local coordination in the Service Order >=T3/E3

8) Due date change of an expedite without access and/or transport circuit involvement >=T3/E3 Expedited Provisioning should be priced as a Non-Recurring charge.

Table B-7. General TUC List

NRC CLIN
CASE NUMBER
Description
Contractor proposed expedited service provisioning intervals
Charging Unit
GN99990
VA- EXPEDITE PROV NO LOCAL COORD =>T1 and < T3
Expedite for a new service/feature initiation with direct circuit involvement, but no local coordination, T1/E1 or above but less than T3/E3
VA- EXPEDITE PROV NO LOCAL COORD =>T1 and < T3
Occurrence
GN99990
VA- EXPEDITE PROV =>T1 and < T3
Expedite for a new service/feature initiation with direct circuit involvement and one local coordination, T1/E1 or above but less than T3/E3
VA- EXPEDITE PROV =>T1 and < T3
Occurrence
GN99990
VA- EXPEDITE PROV- ADD LOCAL COORD =>T1 and < T3
Additional charge for expedite of each additional local coordination in the service order, T1/E1 or above but less than T3/E3
VA- EXPEDITE PROV- ADD LOCAL COORD =>T1 and < T3
Occurrence
GN99990
VA- DUE DATE Change of VA- EXPEDITE =>T1 and < T3
Due date change of an expedite with direct circuit involvement, but no local coordination, T1/E1 or above but less than T3/E3
VA- DUE DATE Change of VA- EXPEDITE =>T1 and < T3
Occurrence
GN99990
VA- EXPEDITE PROV NO LOCAL COORD => T3/E3
Expedite for a new service/feature initiation with direct circuit involvement, but no local coordination >=T3/E3
VA- EXPEDITE PROV NO LOCAL COORD => T3/E3
Occurrence
GN99990
VA- EXPEDITE PROV => T3/E3
Expedite for a new service/feature initiation with direct circuit involvement and one local coordination >=T3/E3
VA- EXPEDITE PROV => T3/E3
Occurrence
GN99990
VA- EXPEDITE PROV- ADD LOCAL COORD => T3/E3
Additional charge for expedite of each additional local coordination in the service order >=T3/E3
VA- EXPEDITE PROV- ADD LOCAL COORD => T3/E3
Occurrence
GN99990
VA- DUE DATE Change w/o Access
Due date change of an expedite without access and/or transport circuit involvement >=T3/E3
VA- DUE DATE Change w/o Access
Occurrence
GN99990
VA- EXPEDITE PROV – OCONUS
Expedite Provisioning – OCONUS
VA- EXPEDITE PROV - OCONUS
Occurrence
GN99990
VA- INSIDEMOVE =<T1/E1
Inside access move greater than DS0 up to and including T1/E1
VA- INSIDEMOVE =<T1/E1
Occurrence
GN99990
VA- INSIDEMOVE =>T1/E1 <T3/E3
Inside access move greater than T1/E1 up to but not including T3/E3
VA- INSIDEMOVE =>T1/E1 <T3/E3
Occurrence
GN99990
VA- CANCEL SITE SURVEY
Cancel site survey
VA- CANCEL SITE SURVEY
Occurrence

Section G.8.2.2 of the EIS Contract includes Standard Service Provisioning intervals;

Requirements This is the VA solicitation for POTS Replacement services utilizing the General Services Administration’s Enterprise Infrastructure Solutions (EIS) contract.

The baseline requirements for the services sought herein are defined in Section C of the EIS contract. The VA expects that all EIS contractors provide the baseline level of service. The VA has additional agency-specific requirements that are described in this solicitation and will be assessed as part of the technical evaluation process defined in Section M Evaluation Factors for Award of this solicitation. This solicitation describes the full range of services required.

The contractor shall provide all personnel, transportation, equipment, tools, materials, supplies, installation, management, supervision, engineering, maintenance, testing, and services necessary to make circuits/services fully operational and to perform all tasks and functions as defined in this solicitation.

Consistent with Section C.2.11of the EIS contracts, the contractor shall provide, at no additional cost to the government, all service-related labor necessary to implement the services. The contractor shall propose any Service-Related Equipment (SRE) necessary to implement and manage the service.

Service(s) Sought.

VA seeks to acquire the following EIS service(s):

NOTE: If any service below is marked with a star (*), it is designated as optional, i.e., a service that VA may order. Optional services represent a legitimate need based on such things as potential future requirements, forecasted data and estimated quantities but are ordered if and when VA chooses to do so. In contrast, the services that are not marked with a star are mandatory, i.e., services that the agency intends to order. Offerors shall include all services (mandatory and optional) in their proposals.

Service
Service ID
Mandatory or Optional
*Internet Protocol Service
IPS
Optional
*Broadband Internet Services
BIS
Optional
*Cable & Wiring
CW
Optional
*Wireless Service
MWS
Optional
Managed Network Service
MNS
Mandatory
Service-Related Equipment
SRE
Mandatory
Internet Protocol Voice Service
IPVS
Mandatory
Circuit Switched Voice Service
CSVS
Mandatory

The table below associated the service identified in this solicitation with their applicable periods of performance. The base period and option period intervals are defined in Section H.2 of this solicitation.

Option Period

Services
Base Period
1
2
3
4
5
6
7
8
IPS
X
X
X
X
X
X
X
X
X
BIS
X
X
X
X
X
X
X
X
X
CW
X
X
X
X
X
X
X
X
X
MWS
X
X
X
X
X
X
X
X
X
MNS
X
X
X
X
X
X
X
X
X
SRE
X
X
X
X
X
X
X
X
X
IPVS
X
X
X
X
X
X
X
X
X
CSVS
X
X
X
X
X
X
X
X
X

Project Title VA POTS Replacement Project Overview This effort is for a turn-key vendor managed and maintained solution to replace existing VA POTS lines.

Project Background VA currently depends on legacy technology known as POTS over traditional copper wires to meet part of the agency’s mission telecommunications goals.

Voice services over traditional analog loops which are also known as Plain Old Telephone Service (POTS) have been sunsetting and services have been increasing in cost and decreasing in availability.

This effort is to replace POTS with alternative technologies to provide service for Fire, Life, Safety Applications, Fax, Security Alarms, Fire Alarms, Elevators, Security Gate/Door Access Box/ Blue light phones, Voice contingency, Enhanced 911 (E911), and remote access system.

Description of Current Environment VA provides high-availability critical communications services (i.e., medical centers, regional offices, administrative offices, and top-level National Cemetery Administration (NCA) sites) with multiple locations in CONUS, OCONUS in Alaska, Hawaii, and US Territories of Puerto Rico, Virgin Islands, American Samoa, and Republic of the Philippines.

VA continues to expand the number of locations to better meet it’s Mission to service our nation’s Veterans and their families.

Project Scope The scope of this TO is to provide POTS replacement services for the VA enterprise as identified in this SOW.

The baseline requirements for the services required under this TO are defined in Section C of the EIS Contract. Specific sections are annotated in the associated service sections below. The Contractor shall provide the level of service and support specified in the EIS Contract, and as more specifically described below as VA agency-specific related requirements.

The Contractor shall provide successful, timely, and orderly transformation of all VA’s POTS to a replacement service that is acceptable to the VA. The scope of this TO includes all legacy voice and related services from VA contracts and any new, optional, or enhanced services as defined in this TO.

During the Period of Performance of this TO, the Contractor shall identify and propose within scope technology refresh of voice services that refine and enhance the Contractors offerings in order to keep current with technological changes and updates. VA will negotiate and award modifications based on the Contractor’s technology refresh. Technology refresh modifications will allow VA to continue to acquire, implement, and manage in-scope enhancements and services as needed to meet VA mission needs. Accordingly, the scope of this TO includes the current functionality described in this SOW, as well as those future services and capabilities offered through the GSA EIS Contract that will replace or improve functionality for VA voice services. In-scope future services may only be added to the TO through formal modification as necessary.

In addition, specific services in this TO will be provided as unique TO Projects as defined in Section G.3.3.3.3 of the EIS Contract. Each TO Project service proposal shall be requested by SOs that define the type and location of services to be delivered.

Applicable Documents In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:

44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002” “Federal Information Security Modernization Act of 2014” Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules” FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004 FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006 FIPS Pub 201-3, “Personal Identity Verification of Federal Employees and Contractors,” January 2022 10 U.S.C. § 2224, "Defense Information Assurance Program" 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974.”

Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964” VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010 VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016 VA Directive, “Internet/Intranet Services,” August 5, 2019 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017 Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” November 28, 2000 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)” NIST SP 800-66 Rev. 2, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” February 2024 Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017 Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004 VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021 VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021 VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” June 30, 2023 VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010 VA Handbook 6500.6, “Contract Security,” March 12, 2010 VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011 VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018 VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017 VA Office of Information and Technology (OIT) Process Asset Library VA Technical Reference Model (TRM) VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014 VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016 VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017 VA Directive 6300, “Records and Information Management,” September 21, 2018 VA Handbook, 6300.1, “Records Management Procedures, “March 24, 2010 NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018 NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020) VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015 VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014 OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005 OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019 OMB Memorandum, “M-17-15, Rescission of Memoranda Relating to Identity Management,” January 19, 2017 Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with updated Architecture NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access, “June 2018 NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020 NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014 Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014 IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019 Trusted Internet Connections (TIC) 3.0 Core Guidance Documents OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019 OMB Memorandum M-17-26, Reducing Burden for Federal Agencies by Rescinding and Modifying OMB Memoranda,” June 15, 2017 Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007 Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005 Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018 Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001 VA Directive 0057, “VA Environmental Management Program,” October25, 2022 Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014 Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103 “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021 VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, “DevSecOps Product Line Management Playbook” version 2.0, May 2021 NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020 OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version 6 (IPv6),” November 19, 2020 Social Security Number (SSN) Fraud Prevention Act of 2017 Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018

Functional Requirements

VA currently has multiple contracts that provide POTS service withing VA. VA requires the provision of EIS services to meet the needs stated in this section. The Contractor’s services shall meet the minimum requirements described in the referenced section for the service in the EIS Contract, as well as any VA specific related requirements detailed in this TO. Contractors are expected to propose an appropriate mix of services to replace existing POTS Lines.

The contractor shall engineer, design, configure, deliver, and maintain POTS Line Replacement at all locations listed in Section J.1 Pricing Workbook. Any solution proposed shall meet and/or comply with the following:

FCC Part 15B Class B FCC EMC Conformity NFPA72 National Fire Alarm and Signaling Code® ASME A17.1 Elevator Code PCI Payment Card Industry Encryption HIPAA Health Privacy UL1610 Central-Station Burglar-Alarm Systems UL985 Fire Warning Control Systems UL1023 Household Burglar Alarm Systems UL864 Accessories for Fire Alarm Systems UL2525 Two-Way Emergency Communications/Area of Refuge

The Contractor shall ensure the locations and services defined in Section J.1 Pricing Workbook(s) shall be designed and configured to provide 99.999% availability from the point of demarcation (POD), demarcation extension, or demarcation to all other locations.

The Contractor shall provide the services defined in the sub-sections below, in the quantities and locations identified in Section J.1 Pricing Workbook. Managed Services, as defined in SOW Section C.12 of this TO, shall be delivered as blocks of services to ensure a unified service.

In addition to the standards listed is the referenced sections of the EIS Contract, the Contractor shall be compliant with the applicable documents listed in Section J of this TO.

Internet Protocol Service (IPS)

The contractor's proposed IPS solution shall meet the requirements described in Section C.2.1.7 Internet Protocol Service of the EIS contract.

Connectivity

The contractor's proposed offering shall meet the connectivity requirements as described in Section C.2.1.7.1.3 Connectivity within the IPS section in the EIS contract.

Technical Capabilities

The contractor’s proposed service shall include the technical capabilities as described in Section C.2.1.7.1.4 Technical Capabilities within the IPS section of the EIS contract.

Features

The contractor’s proposed offering shall include the features in the EIS contract. These features are described in Section C.2.1.7.2 Features within the IPS section of the EIS contract.

Performance Metrics

The contractor's proposed IPS solution shall meet the performance levels as specified in the EIS contract in IPS Section C.2.1.7.4 Performance Metrics and Section G.8.2.1 Service Performance SLAs.

Broadband Internet Service (BIS)

The contractor's proposed BIS solution shall meet the requirements described in Section C.2.1.8 Broadband Internet Service of the EIS contract.

Connectivity

The contractor's proposed offering shall meet the connectivity requirements as described in Section C.2.1.8.1.3 Connectivity within the BIS section in the EIS contract.

Technical Capabilities

The contractor’s proposed service shall include the technical capabilities as described in Section C.2.1.8.1.4 Technical Capabilities within the BIS section of the EIS contract.

Interfaces

The contractor’s proposed service shall include the UNIs at the SDP for BIS provisioning described in Section C.2.1.8.1.3 Interfaces within the BIS section of the EIS contract.

Features

The contractor’s proposed offering shall include the features in the EIS contract. These features are described in Section C.2.1.8.2 Features within the BIS section of the EIS contract.

Performance Metrics

The contractor's proposed BIS solution shall meet the performance levels as specified in the EIS contract in BIS Section C.2.1.8.4 Performance Metrics and Section G.8.2.1 Service Performance SLAs.

Cable and Wiring Service (CWS)

Cable and Wiring Service (CWS) consists of contractor-provided connectivity using the appropriate cabling and wiring, related trenching, ducting, grounding, as well as lightning protection systems in accordance with the TO and appropriate standards. The site preparation work done by the contractor under this contract must conform to applicable federal, regional, and local codes, and must conform to accepted industry installation and construction practices. All planned work and code compliance will be subject to OCO review and approval prior to the start of work. The contractor will be required provide all tools and test equipment necessary to perform the site preparation as specified in the TO and will retain ownership of the tools and test equipment unless otherwise specified in the TO. The agency will furnish facilities and utilities to the contractor that already are installed at the site, including light, heat, ventilation, and power. Additionally, the contractor must provide a warranty period of at least one (1) year for the premises wiring/cabling after service acceptance. The detailed requirements for CWS as described in Section C.2.12 of the EIS contract apply.

The VA will use CWS to support a wide range of cable and wiring requirements to enable VA and related users to meet mission critical responsibilities.

The contractor's proposed CWS solution shall meet the requirements described in Section C.2.12 Cable and Wiring of the EIS contract.

Technical Capabilities

The contractor’s proposed service shall comply with the requirements as described in Section C.2.12 of the EIS contract and in accordance with Section C.2.10 Service-Related Equipment of the EIS contract for CWS.

NRC CLIN
Description
Charging Unit
Notes
CW00103
ICB Wiring Install
Each
Contractor shall assume a wiring installation that exceeds the minimum parameters established for wiring install requirements of the EIS Fixed Price Wiring Install CONUS NRC CLIN CW00101. This effort consists of a wiring installation that can be accomplished on the customer's premises in 6 to 8 hours and up to 328 feet of wiring. To support this requirement, the Contractor must perform at VA’s designation either a Fixed or ICB Site Survey, as defined in the EIS Task Order Section B.2.12 Cable and Wiring and provide a Site Survey Estimate prior to performing any cable and wiring. The estimate must include sufficient detail to establish that the wiring install price is fair and reasonable. The estimate must be approved by the COR, and VA PM prior to any work being performed, including delivery dates. The price shall include all termination, jacks, testing, labor, travel, and material costs. All cable and wiring shall comply with VA standards as defined in Office of Information and Technology (OIT) Infrastructure Standard for Telecommunications Spaces v3.1 (1 Jul 2021)
CW00303
ICB Wiring Repair
Each
Contractor shall assume a wiring repair that exceeds the parameters established for wiring repair requirements of the EIS Fixed Price Wiring Repair CONUS NRC CLIN CW00301. This effort consists of wiring repair activities that will restore operational services by dispatching qualified personnel to resolve a VA identified problem in less than 4 hours on site. A Site Survey shall not be required to support this activity. The price shall include all wiring, cables, terminations, jacks, testing, labor, travel, and material costs. All cable and wiring used for repairs shall comply with VA standards as defined in Office of Information and Technology (OIT) Infrastructure Standard for Telecommunications Spaces v3.1 (1 Jul 2021)

CW Internal to Service Delivery Point

The Contractor shall provide CW to support VA user premise cable and wiring requirements to enable VA and related users to meet mission critical responsibilities. As identified in the SO, the CW provided to VA by Contractor shall include:

1. Providing VA user premise installation services for equipment necessary to provide telecommunications services and related supporting IT services.

2. Providing required connectivity using cabling and wiring, and related trenching, ducting,…