36C10A18R0043-004.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
Substance Use Disorder Treatment Proof of Concept
Solicitation number
36C10A18R0043
Issued by

About this file

36C10A18R0043 S02 36C10A18R0043 Exhibit A Price Exhibit.xlsx

View the file

Other files

File Type Posted
36C10A18C0067-000.docx DOCX document
36C10A18R0043-A00004000.docx DOCX document
36C10A18R0043-A00003000.docx DOCX document
36C10A18R0043-A00002000.docx DOCX document
36C10A18R0043-A00002002.docx DOCX document
36C10A18R0043-A00002001.docx DOCX document
36C10A18R0043-A00001000.docx DOCX document
36C10A18R0043-A00001001.docx DOCX document
36C10A18R0043-A00001002.docx DOCX document
36C10A18R0043-003.docx DOCX document
36C10A18R0043-002.docx DOCX document
36C10A18R0043-001.docx DOCX document
36C10A18R0043-000.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions_Notes to Preparer

PROCUREMENT SENSITIVE
FOUO

INDEPENDENT GOVERNMENT COST ESTIMATE (IGCE)

DEPARTMENT OF VETERANS AFFAIRS

INSTRUCTIONS:
1. Ensure tasks are aligned with PWS paragraphs (i.e. 5.1, 5.2, etc.). Subparagraph level should reflect that requested in Evaluation Plan (i.e. 5.X, 5.X.X, etc.)
2. Optional tasks must be broken out to allow for clear distinction between base funding and any task(s) requiring future funding. For optional tasks that can be exercised once at any time during the POP, place the task into the timeframe it would most likely be exercised. For optional tasks that can be exercised throughout the POP, place the task in each period with hours illustrating the most likely scenarios for the times it will be exercised.
3. Consider level of effort (labor categories and hours) required for base period and any option periods/optional tasks
4. Reference the applicable labor tab(s) for available labor categories and composite labor rates. If using the T4 rates tab for T4 task orders, be sure to apply on-site (Govt site) or off-site (Contractor site) rates accordingly. If using the GSA sample labor rate tab for non-T4 estimates, there are additional instructions are on that tab. Enter labor rate for base period of the IGCE format tab and the identified escalation rate will be applied for subsequent ordering periods.
5. Average full time equivalent (FTE) = 1920 hours
6. Reference ITARS library for Product Service Code (PSC) guidancePSC Guidance
7. Sample data has been provided in blue italics on the subsequent tabs. Please remove all sample data and markings before submssion to the TAC.

IGCE Version Number: 2.4

Version History
Template Version #Version DescriptionRelease Date
2.4Updated GSA Labor Rates Tab (2016), included T4NG rates tab2-May-16
2.3Updated GSA Labor Rates Tab (2015)30-Jul-15
2.2Updated note for national air fare average.23-Jun-14
2.1Added Instructions, GSA sample data, and Labor Rate Tabs26-Feb-14
2.0Initial Release
PROCUREMENT SENSITIVE
FOUO

http://vaww.vhaco.va.gov/ITAAE/New%20Acquistion%20Process%20Library.htm Price.xls

Offeror:
TaskLabor categoryBase Labor HoursBase Loaded Labor RateBaseOption Period 1 Labor HoursOption Period 1 Labor RatesOption Period1Option Period 2 Labor HoursOption Period 2 Labor RatesOption Period 26 MO Option Labor Hours6 MO Option Labor Rates6 MO Option
5.1 Project Management$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Hardware/Software(Use A Detailed Worksheet )$0.00HW/SW$0.00HW/SW$0.00Not Applicable
Travel(Use A Detailed Worksheet )$0.00Travel$0.00Not ApplicableNot Applicable
Total CLIN 0001$0.00Total CLIN 2001$0.00Total CLIN 3001$0.00$0.00
5.2 Mgt and Oversight Structure RecommendationsNot applicableNot ApplicableNot Applicable
$0.00
$0.00
$0.00
$0.00
$0.00
Total CLIN 0002$0.00
5.3 Mobile Medical Digitaly Capability (per sprint)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Price Per Sprint$0.00
# of Sprints
Total CLIN 00003$0.00
5.4 Patient Care Model Support$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total CLIN 0004$0.00Total CLIN 2004$0.00Total CLIN 3004$0.00$0.00
5.5 Post-Proof of Concept Results$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
Total CLIN 0005$0.00Total CLIN 2005$0.00Total CLIN 3005$0.00$0.00
5.6 Optional Task: Proof of Concept TrainingNot ApplicableNot Applicable$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
Total CLIN 1001$0.00$0.00Total Proposed Amount:
CLIN Sub-total$0.00Total Option Period 1$0.00Total Option Period 2$0.00$0.00$0.00

Travel Worksheet Travel

Price Per Trip Estimate Basis:Base PeriodOption Period 1
Washington, DCSan DiegoWashington, DCSan Diego
Estimated Roundtrip Airfare:
Estimated Car Rental:
Estimated Per Diem:
Total Estimated Price per Trip:$0.00$0.00$0.00$0.00
Base Period
Round Trip LocationNumber of TripsNumber of PersonsNumber of DaysPrice per TripTotal
VACO Washington, DC355$0.00$0.00
Site 1 San Diego555$0.00$0.00
$0.00
$0.00
$0.00
Total Price:$0.00
Option Period 1
Round Trip LocationNumber of TripsNumber of PersonsNumber of DaysPrice per TripTotal
VACO Washington, DC345$0.00$0.00
Site 1 San Diego555$0.00$0.00
$0.00
$0.00
$0.00
Total Price$0.00

HW&SW Worksheet Hardware and Software Worksheet

Item # Description/ Part Number Quantity Unit Price Base Amount Option Year 1 Option Year 2

Total Price $0.00 $0.00 $0.00