This document is a schedule of line items and related Q&A for a federal contract opportunity issued by the Department of Veterans Affairs National Acquisition Center. The contract seeks HTME (Health Technology Management Equipment) and turnkey services for medical imaging equipment at several VA medical facilities across multiple VISN (Veterans Integrated Service Network) regions. The document provides detailed technical specifications for the required equipment, including CTs, MRIs, PET/CTs, RF hybrid ORs, and other imaging modalities. It also includes a series of Q&A responses addressing issues such as site conditions, construction requirements, and equipment integration. The contract opportunity is Solicitation Number 36A79724Q0007, with an anticipated award in January 2024. Responses to the technical and commercial requirements are requested from qualified vendors.

View the file

Other files

File Type Posted
Amendment 0001 - Continuation Page.pdf PDF
503B40006 - 672FC3008 Updated.zip ZIP file
Additional As Builts 12.zip ZIP file
Additional As Builts 4.zip ZIP file
Additional As Builts 16.zip ZIP file
Additional As Builts 2.zip ZIP file
Additional As Builts 7.zip ZIP file
Additional As Builts 6.zip ZIP file
Additional As Builts 8.zip ZIP file
Additional As Builts 5.zip ZIP file
Additional As Builts 14.zip ZIP file
Additional As Builts 1.zip ZIP file
Additional As Builts 3.zip ZIP file
Additional As Builts 11.zip ZIP file
Additional As Builts 15.zip ZIP file
Additional As Builts 9.zip ZIP file
36A79724Q0007 0001.docx DOCX document
Additional As Builts 10.zip ZIP file
Additional As Builts 13.zip ZIP file
Memorandum for Training.pdf PDF
VA Directive 6550 - New Appendix A - published Jun. 2023.pdf PDF
691B40027 - 691B10030.zip ZIP file
NAC Extended Installation and Turnkey Rubric.pdf PDF
36A79724Q0007_1.docx DOCX document
JAN 2024 Extended Install and Turnkey Consolidation Schedule of Line Items.xlsx XLSX spreadsheet
503B40006 - 672FC3008.zip ZIP file
Vendor Workup Spreadsheet - 36A79724Q0007.xlsx XLSX spreadsheet
Vendor Folders.zip ZIP file
521B42003.zip ZIP file
JAN 2024 Extended Install and Turnkey Consolidation Schedule.pdf PDF
JAN 2024 Extended Install and Turnkey Consolidation - RFO.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Requirements

HTME VISNStationEquip POTKY POEquipment TypeQTYSite Visit POCSite Visit DateSite Visit Time
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007XR RAD1Wayne.Wholaver@va.gov3/26/248am - 12pm EST
VISN 8: VA Sunshine Healthcare Network516 BAY PINES, FL516B40027516B40024XR MRI1ian.montanezdelvalle@va.gov3/20/241pm – 2pm EST
VISN 7: VA Southeast Health Care Network521 BIRMINGHAM, AL521B42003521B42007NM SPECT CT1Matthew.Raggio@va.gov3/18/2412 PM CST
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168RF HYBRID OR1leslie.mcgee@va.gov3/25/24 & 3/26/2410am - 2pm EST & 10am - 2pm EST
VISN 7: VA Southeast Health Care Network534 CHARLESTON, SC534B42001534B42005XR RAD1rahiemin.talukder@va.gov3/25/24 & 4/1/249am EST & 9am EST
VISN 7: VA Southeast Health Care Network534 CHARLESTON, SC534B42002534B42006XR RAD1rahiemin.talukder@va.gov3/25/24 & 4/1/241pm EST & 1pm EST
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006XR CATH LAB IR1Lester.Obispo@va.gov3/28/24 & 4/4/246:30am -7:30am PST, 6:30am - 7:30am PST
VISN 8: VA Sunshine Healthcare Network672 SAN JUAN, PR672FC3006672B3T006NM PET CT1hiram.lopez@va.gov3/19/2410am AST
VISN 8: VA Sunshine Healthcare Network672 SAN JUAN, PR672FC3008672B3T015XR RAD1hiram.lopez@va.gov3/26/2410am AST
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036XR RAD1Moriah.Jewett@va.gov & Tom.Phan@va.gov3/26/248am – 11am PST
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034XR RAD1tom.Phan@va.gov3/26/2412pm – 3pm PST
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033XR RAD1Moriah.Jewett@va.gov & Tom.Phan@va.gov3/29/2412pm – 3pm PST
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40030691B40035NM BONE DEN1hau.doan@va.gov & Tom.Phan@va.gov3/29/248am – 11am PST

Q&A

VISNStationEquipment Requisition NumberTurnkey Requisition NumberEquipment QuestionsTurnkey QuestionsGOVT Equipment ResponseGOVT Turnkey Response
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please clarify 1.h. (system weight) - is this the weight of the patient table, C-arm or both? If both, please set a weight limit of 5000 lbs to allow for competition.System weight - gantry and C-Arm. Increased to 5000lb as requested.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Section 3 refers to specific CT benchmarks that indicate this is a CT/Angio combination room. Please clarify if you are looking for a CT/Angio combination system or a stand-alone angio system. If it is a stand-alone angiography system, please remove section 3 points a through g.3D reconstruction technology plus angio.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.Does the table height, under Tech Requirements, bullet point “i”, need to reach 50” from the floor. The max table height on most systems is around 43”.
2.In the Tech Requirements section, regarding bullet point "j" about lateral movement, is the specified 11-inch lateral movement a combination of both left and right movements, or does it refer to an 11-inch motion in one direction from the table isocenter?
3.In the Tech requirement section, regarding bullet point “u” about mobile gantry, what is meant by “mobile gantry”?1. Updated to range of 35-50 in tech specs. 2. Updated to range of +/- 20-35 in tech specs to account for both left and right movement. 3. 360 rotation around table
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please verify if the Computed Tomography specifications are valid for this offer. If not, please remove CT section.
Please change Minimum solid Storage GB from 512 to 500GB to allow full and fair competitionCT section removed. Updating to 500GB min SSD for primary OS. Secondary 1TB M.2 NVMe Drive added to specifications
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide as-built information as it relates to the suite including floors above and below OR suite. Please include Architectural, MEP’s, Med Gas and sprinkler.Asbuilts provided to NAC HTME. Space Below: 1st Floor spaces are VA Police Armory and Admin offices.

Spaces Adjecent: other operating theaters with the OR Spaces above: Flat Roof building is only 2stories in this location

VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide detailed list of panels 01-02C-223C-1201-LIM-XX-001 and 01-02C-STWL7-1201-PNLB-XX-001Documents provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide electrical drawings including power riser diagrams of OR suite.Documents provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide latest OR suite TAB reportDocuments provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide Structural drawings for floor and ceiling of OR suiteDocuments provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide new finish material requirements for the counters/floors/paint/wall protections and ceilings.Counters should be Solid Surface material, floors should be Infection Control Appropriate Welded Vinyl or Epoxy with integrated covebase, Paint is Sherwin Williams Super Paint, Wall Protection SS Sheeting or Acrovyn wall guard. Vendor should follow aplicable VA Specifications from VA til, and expect to provide submitals on each finsish product to COR, this will decide colors, details and provide final approval of product. I can provide a specification list if this is more appropriate.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide facility ICRA requirements.Assume Class V, ICRA form for definition of requirements provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide floor plan and rooms/room #’s for services above are below the OR suiteDocuments provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Will there be any 3rd party equipment provided by VA Buffalo in the OR suite that we need to be aware of?Question is unclear. Please elaborate.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Will med-gas fixtures be modified in the OR suite?there is no VA driven intent to modify existing Med Gas
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide existing equipment drawings for structural review of weights.Documents provided to NAC HTME, see naming convention "Weight"
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide information on freight elevator including weight restrictions and size for delivery requirements.Interior Dimensions :Width 80in, Length 90in, Height 86in;

Weight capacity listed 5000lb.

VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide VA’s SOW for Hybrid OR project.SOW discussed at Site Visit.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide VA’s finish material requirements.Intent of this project is to provide only a site preperation and not a complete gut and renovation. Under these circumstances the BUF VA's intent will be to follow aplicable VA specifications and match existing finishes as needed. Once work is awarded the BUF VA's COR can answer any vendor specific RFI's
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide VA’s ICRA/ILSM requirements.Assume Class V, ICRA form for definition of requirements provided to NAC HTME

ISLM's are reviewed and implemented when an element of life safety will be affected, if you will be affecting life safety expect to provide a months notice and be able to justify the nessecity of the imapct and proof alternate options less impactful to lafe safety have been exhuasted.

VISN 2: VA Healthcare Network Upstate New York 528 BUFFALO, NY 528B40167 528B40168 What rooms/services are below, above, and either side of the Hybrid OR room? Space Below: 1st Floor spaces are VA Police Armory and Admin offices.

Spaces Adjecent: other operating theaters with the OR Spaces above: Flat Roof building is only 2stories in this location

VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Will a full load UPS be part of project. If so, where is it to be located and will that space need to be air-conditioned?I would assume for continuity of equipment operation a UPS is a nessecity. As far as locating it that depends on its dimensions. It would be best to store the UPS with the associated electrical encloses which should be already in a conditioned space.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168What 3rd party equipment is being incorporated into Hybrid OR that we need to be aware of?Question is unclear. Please elaborate.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Will new Hybrid OR room need to be on and independent HVAC system or is existing HVAC to remain and be reused?Existing HVAC to remain
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168Please provide as-built information as it relates to the below items (a.) - (e.)Project files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168a.) ArchitecturalProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168b.) StructuralProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168c.) Radiation ShieldingProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168d.) Fire SprinklerProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168e.) PlumbingProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168f.) Medical GasesProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168g.) HVACProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168i.) ElectricalProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168j.) Power Riser DiagramDocuments provided to NAC HTME
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.Please provide as-built information as it relates to the suite including floors above and below OR suite. Please include Architectural, MEP’s, Med Gas and sprinkler.
2.Provide detailed list of panels 01-02C-223C-1201-LIM-XX-001 and 01-02C-STWL7-1201-PNLB-XX-001
3.Provide electrical drawings including power riser diagrams of OR suite.
4.Provide latest OR suite TAB report
5.Provide Structural drawings for floor and ceiling of OR suite
6.Provide new finish material requirements for the counters/floors/paint/wall protections and ceilings.
7.Provide facility ICRA requirements.
8.Provide floor plan and rooms/room #’s for services above are below the OR suite
9.Will there be any 3rd party equipment provided by VA Buffalo in the OR suite that we need to be aware of.
10.Will med-gas fixtures be modified in the OR suite?
11.Provide existing equipment drawings for structural review of weights.
12.Provide information on freight elevator including weight restrictions and size for delivery requirements.Duplicate Question.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.a Request minimum heat unit range be updated to 3.0-3.7 MU to promote fair and just competition.Updated to specify exam room and include range of 2000-6500 BTU/hr
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.b Request isocenter range be updated to 82-105cm to promote fair and just competition.Updated to 82-105cm.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.c Request heat dissipation rate be updated to greater than 460 KHU/min to promote fair and just competition.Updated to specify exam room and include range of 2000-6500 BTU/hr
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.h Please specify what system weight refers to specifically: C-arm weight, table weight, etc.System weight - gantry and C-Arm. Increased to 5000lb as requested.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.i Request minimum table vertical movement 41-50 inches to promote fair and just competition.Updated to 35-50 inches
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.j Request minimum table lateral stroke 7-11 inches to promote fair and just competition."Lateral Stroke" terminology not used in the specifications.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682.b Please confirm that this lab is a single plane angio C-arm combined with a full CT scanner in the room.3D reconstruction technology plus angio - single plane.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682.i Request C-arm gantry depth be updated to 89-100cm to promote competition.Specifications updated
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682.m Request PA gantry cranial-to-caudal angulation be updated to +/-500 to promote fair and just competition.Specifications updated
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682.n Request C-arm PA gantry SID be updated to range of 90cm to 120cm to promote fair competition.updated to 90-130
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682.u Please specify definition of “mobile” gantry?360 rotation around table.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401686.d Please confirm if this is additional monitors (clone) or if this is the amount of sources necessary to display on the exam room monitor.Monitors to be used as both live and reference.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401689.b Please consider camera in room, placement not specific to a surgical boom.High preference for surgical boom to allow for maximum usability.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681. VA’s SOW for Hybrid OR project.SOW discussed at Site Visit.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401682. VA’s finish material requirements.Intent of this project is to provide only a site preperation and not a complete gut and renovation. Under these circumstances the BUF VA's intent will be to follow aplicable VA specifications and match existing finishes as needed. Once work is awarded the BUF VA's COR can answer any vendor specific RFI's
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401683. VA’s ICRA/ILSM requirements.Assume Class V, ICRA form for definition of requirements provided to NAC HTME

ISLM's are reviewed and implemented when an element of life safety will be affected, if you will be affecting life safety expect to provide a months notice and be able to justify the nessecity of the imapct and proof alternate options less impactful to lafe safety have been exhuasted.

VISN 2: VA Healthcare Network Upstate New York 528 BUFFALO, NY 528B40167 528B40168 4. What rooms/services are below, above, and either side of the Hybrid OR room. Space Below: 1st Floor spaces are VA Police Armory and Admin offices.

Spaces Adjecent: other operating theaters with the OR Spaces above: Flat Roof building is only 2stories in this location

VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401685. Will a full load UPS be part of project. If so, where is it to be located and will that space need to be air-conditioned.I would assume for continuity of equipment operation a UPS is a nessecity. As far as locating it that depends on its dimensions. It would be best to store the UPS with the associated electrical encloses which should be already in a conditioned space.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401686. What 3rd party equipment is being incorporated into Hybrid OR that we need to be aware of.Question is unclear. Please elaborate.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401687. Will new Hybrid OR room need to be on and independent HVAC system or is existing HVAC to remain and be reused.Existing HVAC to remain
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401688. Please provide as-built information as it relates to:Project files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168a. ArchitecturalProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168b. StructuralProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168c. Radiation ShieldingProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168d. Fire SprinklerProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168e. PlumbingProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168f. Medical GasesProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168g. HVACProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168h. ElectricalProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B40168i. Power Riser DiagramProject files with naming convention 528.06-104 provided to NAC HTME.
VISN 2: VA Healthcare Network Upstate New York528 BUFFALO, NY528B40167528B401681.Please supply VA’s SOW for Hybrid OR project.
2.Please supply VA’s finish material requirements.
3.Please supply VA’s ICRA/ILSM requirements.
4.What rooms/services are below, above, and either side of the Hybrid OR room.
5.Will a full load UPS be part of project. If so, where is it to be located and will that space need to be air-conditioned.
6.What 3rd party equipment is being incorporated into Hybrid OR that we need to be aware of.
7.Will new Hybrid OR room need to be on and independent HVAC system or is existing HVAC to remain and be reused.
8.Please provide as-built information as it relates to:
a.Architectural
b.Structural
c.Radiation Shielding
d.Fire Sprinkler
e.Plumbing
f.Medical Gases
g.HVAC
h.Electrical
i.Power Riser DiagramDuplicate: See line 49-58, Documents provided to NAC HTME
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Subsection 1d – “Minimum reconstruction rate (images/sec.)” – please explain if this requirement is specific to 2D imaging or 3D imaging?3D Imaging
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Subsection 1g – “Minimum number of workstation inputs” – please explain what “inputs” are being referred to here? Is this requirement referring to the number of Video Inputs to the Large Display? Or is it referring to the number of workstation monitors that need to be located in Control Room?Workstation inputs are referring to Computing Workstations.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Subsection 2j – “Contrast Injector Table Mounted” – Is there a preference for a specific Contrast Injector vendor that is being requested for this room?No preference for contrast injector as long as it is compatible with the fluoroscopy system.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Subsection 2k – “Hemodynamic monitoring system (hardware and software)” – is the NAC requesting that each vendor quote a full Hemodynamic Monitoring/Recording System? If so, is the new Hemodynamic system to support just this lab in Surgery (i.e. per Obligation #600B40004) , or is it to support other labs (e.g. Cath lab(s) in the Cardiology Department)? Also, would the new hemodynamic system need a remote workstation to be located in the Exam Room so that pressures could be snapped and monitoring and recording can take place from within the Procedure Room?Yes, the hemodynamic monitor is requested from each vendor.

This is to support just this room in surgery.

Does not need a remote monitoring system.

VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please clarify this is not a CARM replacement
Please clarify if this system is meant to be a Surgical HOR systemThis is a replacement of our existing surgical C-arm system in OR.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please provide As-Built drawings (MEP drawings) for the area. Request the documents provided provide as-built information as it relates to: 1) Architectural, 2) structural, 3) Radiation Shielding, 4) Fire Sprinkler, 5) Plumbing, 6) Medical Gases, 7) HVAC, 8) Electrical 9) Power Riser DiagramAsbuilt provided to NAC HTME.

As-Builts - OR4

VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please provide SOW for project.SOW not provided.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please provide finish material requirements.Document provided to NAC HTME.

2024-04-24-Version 6-LBVA Materials and Finishes Schedule VISN 22: VA Desert Pacific Healthcare Network 600 LONG BEACH, CA 600B40004 600B40006 Please provide ICRA/ILSM requirements. Document provided to NAC HTME.

2020 – ILSM & Hot Work Permit VISN 22: VA Desert Pacific Healthcare Network 600 LONG BEACH, CA 600B40004 600B40006 What rooms/services are below, above, and either side of the procedure room? Asbuilt provided to NAC HTME.

LB-126-04AR

LB-126-05AR

LB-126-06AR

VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006What 3rd party equipment is being incorporated into project that the station will purchase separately from this HTME contract?Booms and surgical lights.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please provide the functional program and intended classification for the space. (For example, Class 2 or Class 3)?Class 3
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006If existing HVAC to be reused does it meet current VA HVAC requirements?Yes
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Can the boom vendor be confirmed as it will impact the configuration the solution Philips would propose for compatibility?No vendor confirmed; pending award.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please confirm if there are as-built drawings available for the X-Ray Room. If so, please provide.Asbuilt provided to NAC HTME.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please confirm if there is an Physicist's Report, to confirm existing lead lining and requirements for this project. If so, please provide. If not, will one be done by the onwer?Local RSOs confirmed existing lead lining. Contractor will need to do a pre-shielding design for the new equipment and post-installation testing.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please confirm if there is a Haz Mat report available for this room. If so, please provide. If not will one be done by the owner?No
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please verify if the existing room and restroom will need to be brought up to current ADA requirements.N/A; no restroom
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Are the new base casework counter tops in the main room and control room to be solid surface with coved backsplash, or plam? Provide required finish specs.Document provided to NAC HTME.

2023-06-20 Version 10-LBVA Engineering Shop Standards

VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please verify if we are to replace the exisitng HVAC CAV with a new one, and if so, provide requirementsYes
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Are HVAC Pre-Read air balance reports required? Also, are Post-Read reports required? Please confirm if we are to replace the exisitng peddle operated sink with a new sink (non-peddle operated).Yes
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Please confirm if the proposed project will be designated as a hybrid OR, cath lab or something else.This is a replacement of our existing surgical C-arm system in OR.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Will the project be required to meet the VA design guidelines for a hybrid OR or whatever the room will be used for? VA Design Guidelines: approx. 32’-2” x 28’-8” Monoplane Hybrid OR excluding x-ray control room.No
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006The room has Philips imaging equipment & control, Skytron ceiling surgical lights and anesthesia boom. Will this project include replacement of the surgical lights and anesthesia boom?Yes
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006The existing imaging control equipment is currently placed within the hybrid OR with no separate x- ray control room. Will this project maintain the same set up or will require a separate x-ray control room with a leadlined window looking into the OR?Yes, same setup
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Will the new equipment be required or requested to be on UPS?Yes
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006Confirm who will contract with a physicist to provide report for design and pre & post radiation testing.Awarded contractor will be required to perform design, pre- and post- radiation testing
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006If possible, please provide As-Built documentation reflecting existing conditions.Asbuilt provided to NAC HTME.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006If possible, please provide Philips Final Equipment Drawings which reflect existing systemUnable to release the drawings without expressed permission from Philips
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40004600B40006If possible, please identify use of area directly below treatment space, and associated floor plan.Asbuilt provided to NAC HTME.

LB-126-04AR

LB-126-05AR

LB-126-06AR

VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please change wireless detector weight from 6.5lb to 8.4lbs to allow full and fair competitionThe technical specification for the additional wireless detector must remain no more than 6.5 pounds. Increasing the weight to 8.4 pounds would increase the expected weight by approximately one-third over the original request. The portable detector is for exams that require more maneuverability, so asking a patient to help hold a heavier detector could be an issue, especially given the general older patient population this equipment will serve. Bids can still be placed for heavier detectors to allow a fair opportunity for other technical specifications to excel, but the technical requirement for a portable detector with a maximum weight of 6.5 pounds still stands.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please verify if Edge Guard polycarbonate panels are acceptable for work area barriers, or if framing & drywaal is required.Ed Guard Polycarbonate panels are acceptable. This is level IV ICRA. The contractor must install ante room with negative pressure, -0.01 or lower relative with the adjacent rooms. Contractor can use plastic fire retardant above ceiling or interstials to meet ICRA level IV requirements. See attached ICRA.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please confirm if there are as-built drawings available for the X-Ray Room. If so, please provide.As-buitlt drawings are available. As-builts were provided on April 4th, 2024 to all contractors attending the job walk. I also sent to NAC/ Andrew Moser.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Are exisitng equipment rails to remain, or are we to replace them? Is additional supports above the ceiling required for equipment and are siesmic drawings required?The existing equiment rails and unistrut must be removed and replaced with new including metal anchorage in accordance with equipment and California Structrural Engineers required.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please confirm if there is an Physicist's Report, to confirm exisintg lead lining and requirements for this project. If so, please provide. If not, will one be done by the owner?Additional lead lining is not required for this project. VA GLA physicist will provide the physicist's report after new x-ray requirement installs.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please confirm if there is a Haz Mat report available for this room. If so, please provide. If not will one be done by the owner?Hazardous material report is not available. If found, they will be abated by owner.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please verify if the existing room and restroom will need to be brought up to current ADA requirements.Confirmed. The existing room and restroom comply with ADA.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Are the new base casework counter tops in the main room and control room to be solid surface with coved backsplash, or plam? Provide required finish specs.Casework, cabinets, and countertops must comply with VA Standards, https://www.cfm.va.gov/til, specification section 06 20 00 with plastic laminate and interior millwork, unextended melamine resin.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please verify if we are to replace the exisitng HVAC CAV with a new one, and if so, provide requirementsThe existing HVAV system will remain as is, unchanged exept for furnishing and installing new supply diffusers and return/ exhaust grilles.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Are HVAC Pre-Read air balance reports required? Also, are Post-Read reports required?The contractor shall perform pre-reading of air supply and return/ exhaust. The contractor must perform final air balancing within the site. Please submit ceritified member of AABC, NEBB, or TABB.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40027691B40036Please confirm if we are to provide and install new flooring. If so provide specs and verify if we should include for coved or rubber base.Finishes includes: 1. flooring: remove the existing flooring and replace with Welded seam sheet flooring with 4 inch height at the wall base including new moisture barrier. 2. wall: must be primed coat, and no more than two different colors as selected by owner. 3. Existing ceiling grid will be remain. The contractor shall remove and replace with new ceiling titles. 4. all doors and frames shall be remain as is. all doors and frames shall be repainted.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please verify this is a Chest Only configuration- no table needed.Yes - this is a chest x ray
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please verify if Edge Guard polycarbonate panels are acceptable for work area barriers, of if framing and drywall is required.Ed Guard Polycarbonate panels are acceptable. This is level IV ICRA. The contractor must install ante room with negative pressure, -0.01 or lower relative with the adjacent rooms. Contractor can use plastic fire retardant above ceiling or interstials to meet ICRA level IV requirements. See attached ICRA.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please confirm if we are to install new larger lead lined window at the control room.Confirm. Lead lined window shall be removed and replaced with new lead lined window.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Should the exisitng damaged door closer be replaced?Yes. Replace the existing damaged door closer.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please confirm if we are to replace the exisitng peddle operated sink with a new sink (non-peddle operated).Yes. Replace the existing peddle operated sink with a new sink with anti scald mixing valve.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Is the new casework counter top in the control room to be solid surface with coved backsplash, or plam? Provide required finish specs.Casework, cabinets, and countertops must comply with VA Standards, https://www.cfm.va.gov/til, specification section 06 20 00 with plastic laminate and interior millwork, unextended melamine resin.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Are HVAC Pre-Read air balance reports required? Also, are Post-Read reports required?The contractor shall perform pre-reading of air supply and return/ exhaust. The contractor must perform final air balancing within the site. Please submit ceritified member of AABC, NEBB, or TABB.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please verify if we are to replace the exisitng HVAC CAV with a new one, and if so, provide requirementsThe existing HVAV system will remain as is, unchanged exept for furnishing and installing new supply diffusers and return/ exhaust grilles.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40028691B40034Please confirm if we are provide and install new flooring, if so provide specs. Also verifyy if new flooring should have coved base or rubber base. Exisitng is coved.Finishes includes: 1. flooring: remove the existing flooring and replace with Welded seam sheet flooring with 4 inch height at the wall base including new moisture barrier. 2. wall: must be primed coat, and no more than two different colors as selected by owner. 3. Existing ceiling grid will be remain. The contractor shall remove and replace with new ceiling titles. 4. all doors and frames shall be remain as is. all doors and frames shall be repainted.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please change wireless detector weight from 6.5lb to 8.4lbs to allow full and fair competitionThe technical specification for the additional wireless detector must remain no more than 6.5 pounds. Increasing the weight to 8.4 pounds would increase the expected weight by approximately one-third over the original request. The portable detector is for exams that require more maneuverability, so asking a patient to help hold a heavier detector could be an issue, especially given the general older patient population this equipment will serve. Bids can still be placed for heavier detectors to allow a fair opportunity for other technical specifications to excel, but the technical requirement for a portable detector with a maximum weight of 6.5 pounds still stands.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please verify if Edge Guard polycarbonate panels are acceptable for work area barriers, of if framing and drywall is required.Ed Guard Polycarbonate panels are acceptable. Modular wallsystems are acceptable forms of infectious control barriers so long as the system fully encloses the area with no penetration/leaks. Please make sure all forms of infectious control pre-requisites are met (negative air machine, HEPA filters, permits, forms etc)
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please confirm if there are as-built drawings available for the X-Ray Room. If so, please provide.As-buitlt drawings are available. As-builts were provided on April 4th, 2024 to all contractors attending the job walk. I also sent to NAC/ Andrew Moser.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please confirm if there is an Physicist's Report, to confirm existing lead lining and requirements for this project. If so, please provide. If not, will one be done by the onwer?Additional lead lining is not required for this project. VA GLA physicist will provide the physicist's report after new x-ray requirement installs
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please confirm if there is a Haz Mat report available for this room. If so, please provide. If not will one be done by the owner?The contractor shall perform pre-reading of air supply and return/ exhaust. The contractor must perform final air balancing within the site. Please submit ceritified member of AABC, NEBB, or TABB.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please verify if the existing room and restroom will need to be brought up to current ADA requirements.Confirmed. The existing room and restroom comply with ADA.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Are the new base casework counter tops in the main room and control room to be solid surface with coved backsplash, or plam? Provide required finish specs.Solid surfaces to be used. Preferably Corian. Casework, cabinets, and countertops must comply with VA Standards, https://www.cfm.va.gov/til, specification section 06 20 00 with plastic laminate and interior millwork, unextended melamine resin.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please verify if we are to replace the exisitng HVAC CAV with a new one, and if so, provide requirementsContractor responsibility is to confirm the specification of the new equipment to be installed and the compatibility of new equipment with existing HVAC CAV. If new equipment is not compatible, please provide the specs required for the new HVAC CAV
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Are HVAC Pre-Read air balance reports required? Also, are Post-Read reports required? Please confirm if we are to replace the exisitng peddle operated sink with a new sink (non-peddle operated).Pre-reads and post read reports are mandatory. Any modification to the HVAC system will also require a TAB procedure and report
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40029691B40033Please confirm if we are to include new flooring in the room and provide specs.Finishes includes: 1. flooring: remove the existing flooring and replace with Welded seam sheet flooring with 4 inch height at the wall base including new moisture barrier. 2. wall: must be primed coat, and no more than two different colors as selected by owner. 3. Existing ceiling grid will be remain. The contractor shall remove and replace with new ceiling titles. 4. all doors and frames shall be remain as is. all doors and frames shall be repainted.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40030691B40035The rubic criteria states that installing a different imaging modality than what is currently in the space is Segregable. Please advise what "different imaging modality" means. System currently installed is an Rad/Fluoro room & they are requesting a bone density system replace it, would this be a different imaging modality? If it is determined not to be a different imaging modality, can anything that was associated with the use of the existing system be removed?The current/ existing equipment in room A305 is Rad/ Fluor Picker. The requested equipment is Bone Densitometer/ Dexa Scanner. They were both x-ray technology. Yes, both systems are different imaging modality.
VISN 22: VA Desert Pacific Healthcare Network691 LOS ANGELES, CA691B40030691B40035Room where bone density will be installed has an existing R/F system, please confirm that this system will be de-installed & removed by the VA or other party.The existing sytem shall be de-installed and removed by Turnkey contract.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400071AC and 1BC - Please reduce Max wireless detector weight to 9lbs with battery to increase competition

2a – Is there a preference for generator power beyond the stated minimum of 50kw? We ask this question in conjunction with below Construction question regarding available power 2e – Please reduce minimum spatial resolution lp/mm to 3.6 to maximize competition

2f – Please reduce maximum pixel size to 139µm to maximize competitionPlease confirm that the only power to the building is 208/120 and that the transformer which ultimately brings power to the existing 70amp breaker in the room is converting to 240v.
(If that is the case we will need a new transformer/power run to get the required 80a/480v)Technical specification updated.

Technical specification to remain as is.

Technical specification updated.

Technical specification updated.

As builts provided to NAC HTME. Please refer to electrcial drawings E100, E101, and E700 in provided as builts for details. Power does step up from 208v to 240v.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007Could the requirement for wireless be changed to allow for a fixed detector in bucky wall stand to improve workflow and better efficiency but also decrease risk of detector damage? There would be 2 other wireless detectors in configuration able to accommodate table bucky and table top imaging.Technical specification to remain as is.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007Is the stand and ruler needed for ortho stitching?No
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007Please change patient load capacity from 771 to 661 to allow full and fair competition
Please change minimum tube height from floor from 14in to 15” to allow full and fair competition1. Please Provide as built (mechanical, electrical, structural) drawings?

2. PlaseProvide installation drawings for the system presently installed in the room?

3.Please provide Manufacturer name, floor name, color of floor, time in the room and can an accent color be provided in area of the floor where the existing table was removed?Acceptable changeAs-builts provided to NAC HTME. At this time no existing equipment documentation can be located. New floor will be uniform throughout room, and new flooring will be ESD type (see attached Forbo data sheet on the flooring used in a X-Ray room turn key for a recent Altoona VAMC project, Forbo Colorex SD)
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007Since this equipment will be placed in a government leased facility, is there an agreement with the landlord for the government to conduct renovations within the leased space?Please consult with VA Altoona logistics department for lease agreement details.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400071.Please provide as-built information as it relates to the X-Ray suite and floor plan for facility. Please include Architectural, MEP’s, Med Gas and sprinklerAs-Builts provided to NAC HTME
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400072.Is 480v power available in the facility or building? Please provide detailed information on facility electrical panels.As-Builts provided to NAC HTME
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400073.Provide electrical drawings including power riser diagrams.As-Builts provided to NAC HTME
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400074.Provide latest TAB reportData not available at this time
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400075.Provide new finish material requirements for the counters/floors/paint/wall protections and ceilings.VA Interior Designer to work with COR to determine finalized finish materials.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400076.Provide facility ICRA requirements.Completed ICRA permit outlining requirements will be provided before work starts. After a preliminary review by the VA COR, it appears that it will be a Level IV ICRA (refer to provided ICRA form)
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400077.Provide existing equipment drawings for structural review of weights.No existing equipment drawings can be located at this time.
VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B40007Provide information on delivery requirements/locations.Address

5690 Shaffer Road DuBois, PA 15801-3870

This was provided on the technical specifications document.

VISN 4: VA Stars & Stripes Healthcare Network503 ALTOONA, VA503B40006503B400071. Please provide as-built information as it relates to the X-Ray suite and floor plan for facility. Please include Architectural, MEP’s, Med Gas and sprinkler. 2.Is 480v power available in the facility or building? Please provide detailed information on facility electrical panels.
3.Provide electrical drawings including power riser diagrams.
4.Provide latest TAB report
5.Provide new finish material requirements for the counters/floors/paint/wall protections and ceilings.
6.Provide facility ICRA requirements.
7.Provide existing equipment drawings for structural review of weights.
8.Provide information on delivery requirements/locations.1. As builts provided to NAC HTME. 2. As builts provided to NAC HTME. 3. As builts provided to NAC HTME. 4. Data not available at this time. 5. VA Interior Designer to work with COR to determine finalized finish materials. 6. Competed ICRA permit outlining requirements will be provided before work starts. After preliminary review by the VA COR, it appears it will be a level IV ICRA (refer to provided ICRA form) 7. As builts provided to NAC HTME. 8. Address located on technical specifications document.
VISN 7: VA Southeast Health Care Network521 BIRMINGHAM, AL521B42003521B420071. In line 70, you ask about quantification software, so can you please clarify what you mean by which "NM scanner licenses" from line 41 are required? 2. If the system has its own disconnect built in, is a main disconnect panel still required? 3. Please specify if you would like Cedars, Emory TB or 4DM registration? 4. Specification requires advanced neurology applications. Please specify. 5. What is meant by advanced cardiac configuration? What type of software are you looking for? 6. Will you be doing MUGA? 7. Will you be doing Mycardial Flow Reserve procedures? 8. Based on the site drawing included with the consolidation documents, is the new SPECT/CT going in scanner room #1 (101) or scanner room #2 (103)?1. In line 70, you ask about quantification software, so can you please clarify what you mean by which "NM scanner licenses" from line 41 are required?

Applicable license for Xeleris workstations…