35897_Exhibit 2 Plans Revised~1.pdf

PDF 4 MB Posted

Attached to
Linn and Benton EPA Coalition Grant Implementation
Solicitation number
S-R02706-00009124
Issued by
Lane County, Albany City, Oregon

About this file

Exhibit 2 Plans - Access Control System Installation

This file contains reference drawings from 1999 prepared for a state or local contract opportunity, depicting planned access control system installations across multiple buildings. The project involves installation of new card reader systems on four doors in a Maintenance Building, one door in a Fuel Building, and associated data/communication infrastructure at a mezzanine location. The drawings show electrical distribution panel locations, new underground data conduit runs between the Maintenance Building and Fuel Building, and specifications for door types, including metal exterior doors with metal frames and wood interior doors with metal frames. The document explicitly notes that all drawings are for reference purposes only and serve to identify building locations and general infrastructure layouts, with bidders instructed to verify existing conditions for actual conduit routing.

The plans indicate installation of a new Lenel panel to be mounted to existing panel boards in the Data/Communication Room at the mezzanine. A new one-inch underground data conduit is specified to run from the Maintenance Building to the Fuel Building, with a data sleeve pipe connecting from the Fuel Building to the communication room at the Maintenance Station Building. The drawings reference an associated Electrical Site Plan for additional details on conduit runs and electrical distribution. The document provides minimal information regarding contract timeline, pricing, or procurement requirements, functioning primarily as technical reference documentation for bidders preparing access control system proposals for the identified facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE TO BIDDERS - THIS 1999 DRAWING IS

FOR REFERENCE ONLY TO SHOW THE

BUILDINGS SCHEDULED FOR ACCESS WORK

MAINTENANCE BUILDING -

E FOUR (4) DOORS

FUEL BUILDING -

E ONE (1) DOOR

SEE ELECTRICAL

SITE PLAN FOR NEW

UNDERGROUND

CONDUIT RUNS

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNTED TO EXISTING PANEL BOARD

RED CIRCLED DOORS ARE DOORS

SCHEDULED FOR NEW

CARDREADERS, TYPICAL OF FOUR

(4) THIS BUILDING.

EXTERIOR DOORS ARE METAL,

INTERIOR DOORS ARE WOOD, AND

ALL DOOR FRAMES ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING IS

FOR REFERENCE ONLY TO SHOW

LOCATION OF DOORS AT THE

MAINTENANCE BUILDING, DATA/

COMMUNICATION ROOM, & ELECT PANELS

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA -

SEE ELECT PLAN

DATA SLEEVE PIPE

FROM FUEL

BUILDING IN THIS

AREA

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

RED CIRCLED DOOR IS DOOR

SCHEDULED FOR NEW

CARDREADER, TYPICAL OF

ONE (1) THIS BUILDING.

EXTERIOR DOOR AND FRAME

ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW

LOCATION OF DOOR AT FUEL BUILDING

DATA SLEEVE PIPE TO

COMM. ROOM AT

MAINTENANCE STATION

BUILDING IN THIS AREA.

FOR REFERENCE ONLY TO SHOW THE

GENERAL LOCATION OF CONDUIT.

NEW 1" UNDERGROUND DATA

CONDUIT RUN FROM

MAINTENANCE BUILDING TO

FUEL BUILDING.

VERIFY EXISITING CONDITIONS

FOR ACTUAL CONDUIT PATH.

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNT TO EXISTING PANEL BOARD

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL LOCATION OF DATA ROOM &

ELECTICAL PANELS.