This document is a Questions and Answers response from the Oregon Department of Transportation (ODOT) regarding Invitation to Bid (ITB) 73000-00008548/35850 for Utility Locating Services in Region 2. The services encompass electrical utility locating and marking for multiple districts (District 1: 514 tickets; District 2: 980 tickets; District 4: 1,138 tickets; District 5: 668 tickets) and include marking of electrical and fiber infrastructures such as streetlights, highway lighting, traffic signals, and electrical lines on state-owned properties. The contractor will be responsible for locating both aerial (5%) and buried (95%) electrical utilities, including secondary service lines and meters located in various areas including roadsides and intersections. Services include marking streetlights and traffic signals, which are accessed by both vehicle and foot. ODOT established a target contract start date of February 9, 2024, and will not conduct a pre-bid conference or scheduled phone calls with prospective bidders; all questions must be submitted via email to the listed point of contact at least five days prior to bid opening, with answers posted to OregonBuys.
This contract will be awarded as a Labor Hours Contract, not on a per-ticket basis or fixed monthly fee basis. ODOT permits the use of subcontractors to service difficult-to-reach areas, provided all invoices and communications flow through the primary awarded contractor, who maintains full responsibility for all subcontractor work. Insurance requirements are specified in the Sample Contract Exhibit C posted to OregonBuys. The contractor must comply with the Statement of Work detailed in the Sample Contract Exhibit A. ODOT has acknowledged that utilities have been damaged from inadequate locating in the past, though specific damage costs by utility type are not documented. Digital utility maps are maintained by the Region Electrical Manager through IMAP/ITIC/One Call Concepts, and buried electric secondary service lines are not identified on existing electric utility maps, requiring contractors to conduct thorough field locating services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35849 Preliminary Bid Results.xlsx | XLSX spreadsheet | |
| 35849_ESB_RFCQ_I5 SB Fencing.pdf | ||
| 35849_ESB_RFCQ_Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1
ITB 73000-00008548/35850
Utility Locating Services for Region 2 Electrical
Question 1: What is the Breakdown for Ticket calls in each region?
Answer:
o District 1 – 514 o District 2 – 980 o District 4 – 1138 o District 5 – 668
Question 2: Are there any other utilities that will require marking other than the Electric? If so, please list?
Answer: Electrical and Fiber Infrastructures that may include Streetlights, Highway Lighting, Traffic Signals, Flashers, Variable Message Road Signs, traffic counting devices, electrical lines on State owned property with office buildings and maintenance yards, etc.
Question 3: What is the Target date if pricing is agreed on?
Answer: February 9, 2024
Question 4: Has the plant ever been damaged? If so what was the high and low cost of repair broken down by utility type?
Answer: If your question is “have utilities been damaged from inadequate locating?”, then yes.
ODOT does not have a price for each damage incurred.
Question 5: You you have digital maps (drawings) to identify the electric utility? What format are they in (For example: AutoCAD, PDF, GIS, KMZ)?
Answer: Region Electrical Manager is the owner of the maps on IMAP/ITIC/One Call Concepts
Question 6: Are the buried electric secondary service lines identified on the electric utility maps?
Answer: No
Question 7: Would we be marking to the meter? If so where typically is the meter located? Depends if the Electrical Distribution is near the meter?
Answer: Meters can be located on the side of highways, intersections, and are not always visible from the roadway.
Question 8: How much of the electric is aerial versus buried?
Answer: 95% Buried
Question 9: Does this RFP include electrical to Street lights?
Answer: Yes
Question 10: If Yes to the above how are they to be accessed?
Answer: Street lighting is accessed by vehicle and by foot
Question 11: Does this RFP include Traffic Signals?
Answer: Yes
Question 12: If yes to the above how are they to be accessed?
Answer: Traffic Signals are accessed by vehicle and by foot
Question 13: Generally, utility locate contracts are bid per ticket. Clarification on this would be appreciated as the online format doesn't seem to match the per ticket method. Also, would you be open to a set price per month, and we would just handle everything?
Answer: This will be a Labor Hours Contract, as it has been bid and awarded in the past. ODOT is NOT open to a set price per month.
Question 14: Where can the Insurance requirements for the Contract be found?
Answer: See the following document posted to OregonBuys – 35850_Sample Contract – Exhibit C – Insurance Requirements.
Question 15: Would ODOT allow the use of sub-contractors to locate in areas that may be difficult for us to service?
Answer: ODOT will allow the use of subcontractors but all invoices and communications must come from and/or through the Contractor that is awarded the Contract. The awarded Contractor will be responsible for all work performed by their subcontractor(s).
Question 16: Would you consider a pre-bid conference?
Answer: ODOT will not do a pre-bid conference. The Statement of work can be found in 35850_Sample Contract – Exhibit A. Any questions need to be emailed to the point of contract listed in OregonBuys 5 days prior to bid opening. Answers will be posted to OregonBuys.
Question 17: If the answer is no to a pre-bid conference. Would ODOT consider a 30-minute scheduled phone?
Answer: No