35850_Q&A 1.pdf
PDF 157 KB Posted
- Solicitation number
- S-73000-00008548
- Issued by
- Lane County, Oregon
About this file
This document is a set of Questions and Answers (Q&A) related to an Invitation to Bid (ITB) for Utility Locating Services for Region 2 Electrical issued by the Oregon Department of Transportation (ODOT). The ITB seeks one qualified contractor to provide a full-service spectrum of underground utility locating services, including retrieving and completing Locate Requests through the OUNC One Call system, project-specific locates, third-party damage investigations, and updating ODOT's maps and diagrams of underground facilities. The contract is for ODOT Region 2, which covers the jurisdictions of Marion County and the City of Salem. The target contract start date is February 9, 2024.
The ITB is a labor hours contract, and ODOT is not open to a set price per month. Subcontractors are allowed, but the awarded contractor will be responsible for all work performed by their subcontractors. ODOT will not hold a pre-bid conference, but bidders can submit questions via email, and answers will be posted on OregonBuys.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35850 bidcover.docx | DOCX document | |
| 35850_ITB Utility Locating Service.pdf | ||
| Att 1 Region 2 Map.pdf | ||
| SO1456-23 - Posting Page.pdf | ||
| 35850 Key staff resumes.docx | DOCX document | |
| 35850 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| 35850_Sample Contract.pdf | ||
| Att 2 District Maps.pdf | ||
| Att 3 ODOT Policy ADM 05-08-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1
ITB 73000-00008548/35850
Utility Locating Services for Region 2 Electrical
Question 1: What is the Breakdown for Ticket calls in each region?
Answer:
o District 1 – 514 o District 2 – 980 o District 4 – 1138 o District 5 – 668
Question 2: Are there any other utilities that will require marking other than the Electric? If so, please list?
Answer: Electrical and Fiber Infrastructures that may include Streetlights, Highway Lighting, Traffic Signals, Flashers, Variable Message Road Signs, traffic counting devices, electrical lines on State owned property with office buildings and maintenance yards, etc.
Question 3: What is the Target date if pricing is agreed on?
Answer: February 9, 2024
Question 4: Has the plant ever been damaged? If so what was the high and low cost of repair broken down by utility type?
Answer: If your question is “have utilities been damaged from inadequate locating?”, then yes.
ODOT does not have a price for each damage incurred.
Question 5: You you have digital maps (drawings) to identify the electric utility? What format are they in (For example: AutoCAD, PDF, GIS, KMZ)?
Answer: Region Electrical Manager is the owner of the maps on IMAP/ITIC/One Call Concepts
Question 6: Are the buried electric secondary service lines identified on the electric utility maps?
Answer: No
Question 7: Would we be marking to the meter? If so where typically is the meter located? Depends if the Electrical Distribution is near the meter?
Answer: Meters can be located on the side of highways, intersections, and are not always visible from the roadway.
Question 8: How much of the electric is aerial versus buried?
Answer: 95% Buried
Question 9: Does this RFP include electrical to Street lights?
Answer: Yes
Question 10: If Yes to the above how are they to be accessed?
Answer: Street lighting is accessed by vehicle and by foot
Question 11: Does this RFP include Traffic Signals?
Answer: Yes
Question 12: If yes to the above how are they to be accessed?
Answer: Traffic Signals are accessed by vehicle and by foot
Question 13: Generally, utility locate contracts are bid per ticket. Clarification on this would be appreciated as the online format doesn't seem to match the per ticket method. Also, would you be open to a set price per month, and we would just handle everything?
Answer: This will be a Labor Hours Contract, as it has been bid and awarded in the past. ODOT is NOT open to a set price per month.
Question 14: Where can the Insurance requirements for the Contract be found?
Answer: See the following document posted to OregonBuys – 35850_Sample Contract – Exhibit C – Insurance Requirements.
Question 15: Would ODOT allow the use of sub-contractors to locate in areas that may be difficult for us to service?
Answer: ODOT will allow the use of subcontractors but all invoices and communications must come from and/or through the Contractor that is awarded the Contract. The awarded Contractor will be responsible for all work performed by their subcontractor(s).
Question 16: Would you consider a pre-bid conference?
Answer: ODOT will not do a pre-bid conference. The Statement of work can be found in 35850_Sample Contract – Exhibit A. Any questions need to be emailed to the point of contract listed in OregonBuys 5 days prior to bid opening. Answers will be posted to OregonBuys.
Question 17: If the answer is no to a pre-bid conference. Would ODOT consider a 30-minute scheduled phone?
Answer: No
File details come from the government source that posted it. Updated .