This document is an Amendment to Solicitation for a federal contract opportunity to replace the variable refrigerant flow (VRF) HVAC system on the 3rd floor of the Heavy Assembly Building (HAB) at Fermi National Accelerator Laboratory in Batavia, IL.
The amendment revises the proposal due date and provides responses to 13 questions submitted by subcontractors, covering topics such as fire alarm system modifications, cubicle relocations, ceiling grid and tile specifications, floor protection requirements, and training. It confirms that the existing Daikin control system can be removed, and provides details on the location of the existing Metasys controller. The solicitation is being advertised as a Small Business Set-Aside with a Lowest Price Technically Acceptable (LPTA) source selection. A pre-proposal meeting and site visit are scheduled for June 18, 2024. The contractor will be responsible for protecting existing surfaces and furnishings during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP HAB VRF HVAC Replacement.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT TO SOLICITATION
AMENDMENT NO. 01 DATE OF AMENDMENT: July 8, 2024
SOLICITATION NO. 355523 DATE ISSUED: July 8, 2024
PROJECT NO. OPENING DATE: July 25, 2024
TITLE OF PROJECT: HAB 3rd Floor VRF Replacement
Bidders must acknowledge this Addendum before the hour and date set forth in the solicitation by one of the following methods:
1. Immediately upon receipt of the amendment via email to the FRA Procurement Specialist.
2. Return the Amendment with a signature on the acknowledgment signature line.
3. In the Offeror’s Proposal Letter that accompanies an Offeror’s proposal.
If by this Addendum you desire to change a bid already submitted, such change may be made by email or letter, provided such email or letter refers the Solicitation and this Amendment and is received before the time set for opening.
The above reference Solicitation is amended as follows:
REQUEST FOR PROPOSAL (RFP) 355523, HAB 3RD FLOOR VRF REPLACEMENT, SECTION 8.
PROPOSAL DUE DATE
First paragraph of this section is hereby replaced and shall read as follows:
The offeror’s proposal is to be emailed to the Procurement Specialist no later than 3:00 PM CST on July 25, 2024. Partial or incomplete proposals will not be considered.
QUESTIONS/RESPONSES
1. Subcontractor Question
Per drawing E-002 #12.2.1 All visual devices shall remain synchronized throughout the project. Can all smoke detectors related to the 3rd floor ceiling be removed for construction or will they need maintained protection during the construction process?
FRA Response
Smoke detection can be removed during construction as the 3rd floor is also sprinklered. Notification devices most likely will need to stay in place. The Fire Techs will need to be called to make this disablement.
Please give them ample notice so they have time to remove devices if need be.
2. Subcontractor Question
Will FNAL fire techs assist with the fire alarm panel if the devices are to be temporarily taken out of service?
See response to question #1.
3. Subcontractor Question
Will the cubicles be removed/relocated for the construction project? If so, who is responsible for moving and disconnecting the cubicles?
No cubicles will be removed.
4. Subcontractor Question
Will the entire 3rd floor be accessible for construction at the same time? Can the entire ceiling on the 3rd floor be removed at the same time?
Yes, to both.
5. Subcontractor Question
Can FNAL confirm if there are permanent roof anchors/tie off points permanently mounted on the HAB roof?
There are permanent anchor ties approximately 6’-1 East of column line 3. The attached A-01 drawing from the roof replacement project shows the location (FY CFM Roofing – HAB (323) Roof Plan dated
September 16, 2022.
6. Subcontractor Question
Please confirm that the existing Daikin control system can be removed. Please confirm that there are no existing mechanical units not being replaced that currently operate off of the existing Daikin controller.
The existing Daikin Central Controller can be removed. Only the existing 3rd Floor VRF units and associated condenser units are on this controller.
7. Subcontractor Question
Can FNAL confirm the location of the existing Metasys controller?
The existing Metasys controller is in the 3rd floor electrical closed on the opposite wall as the Daikin
Central Control.
8. Subcontractor Question
Can FNAL provide a spec for the existing 3rd floor ceiling grid?
CMC 4500 Series, 9/16", White, Class "A" Grid System, with 1/4-inch Slot (see attached – 09511-1-R1-
Acoustical Panel Ceiling – NET MCP).
9. Subcontractor Question
Can FNAL provide a spec/part number for the existing 3rd floor ceiling tile?
ACT Tile: Armstrong #3251 Optima Open Plan, 2x2x1", Revealed Edge, White, Class "A" Tile (See attached - 09511-1-R1-Acoustical Panel Ceiling – NET MCP).
10. Subcontractor Question
What type of floor covering is required for the 3rd floor construction? Who is to provide and install the floor covering?
Plastic sheeting should be placed over any area that work is taking place that could cause debris to fall onto the floor or someone’s cubicle area. This should be the responsibility of the contractor as they are the one who will know exactly where they need to set themselves up at any given moment.
11. Subcontractor Question
Please confirm if any special FNAL training is required for this project?
HAB Training will be required for access to the building. (approx. 1 hour, online)
12. Subcontractor Question
Will all the condensate drains be gravity feed, or will each wall mount have a condensate pump and will pump to a condensate tank then pumped outside?
The basis of design fan coils listed in the equipment schedules have integral condensate pumps. Attached is a cutsheet for one of the fan coils for reference (ODC-IDU – BS Box Cuts).
13. Subcontractor Question
Will the contractor be responsible for floor protection?
The Subcontractor shall be responsible for the protection of all existing surface, furnishings, equipment, installations, and etc.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Fermi National Accelerator Laboratory
P.O. Box 500
Batavia, IL 60510
M.S 210
Robert Ropos
Procurement Specialist III
(630) 840-5249
Email: rropos@fnal.gov
Kindly acknowledge receipt of this Amendment by signing and returning one (1) copy of this Amendment.
Company Name
Signature
Name & Title of Individual
Date