35125_Amendment.pdf
PDF 122 KB Posted
- Attached to
- PANG BLD 180 FIRE STATION BAY DOORS REPLACEMENT
- Solicitation number
- S-24800-00001686
- Issued by
- Multnomah County, Oregon
About this file
This is an Addendum No. 1 to a Request for Bids (RFB) issued by the Oregon Department of Transportation for the ESB D5 I-5 MP 199 Stockpile Cleanup project. The addendum modifies the original RFB by extending the bid submission deadline to January 28, 2022, and revising the estimated project quantities to include 2,000 cubic yards of debris and 200 cubic yards of brush. The scope of work has been clarified to prohibit burning on-site and to require the contractor to remove, load, transport, and dispose of all felled trees, chips, debris, tops, limbs, brush, and other slash generated during the project, with all chips required to be removed from the site. The buyer for this procurement is Carolee Will, who can be contacted at Carolee.s.will@odot.oregon.gov or 503-986-6938.
No pricing information, set-aside designations, incumbent vendors, funding sources, or renewal options are specified in this addendum. The document serves solely to modify specific requirements and deadlines established in the original RFB, with all other terms and conditions of the original solicitation remaining in full force and effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Findoor Brochure 2021.pdf | ||
| ITB FIRE STATION ITB FINAL FOR POSTING.pdf | ||
| UFC 4-730-10 Fire Stations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB_ADDENDUM, REV. Mar 2017
DATE: January 19, 2022 OREGON DEPARTMENT OF TRANSPORTATION
REQUEST FOR BIDS (“RFB”)
ADDENDUM NO. 1
RFB NO.: 35125 BID SUBMISSION
DEADLINE:
New January 28, 2022
DESCRIPTION: ESB D5 I-5 MP 199 Stockpile Cleanup
BUYER:
Carolee Will EMAIL: Carolee.s.will@odot.oregon.gov PHONE: 503-986-6938
This Addendum modifies the Request for Bid (RFB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum remain in full force and effect. This Addendum is hereby made an integral part of the RFB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the RFB.
THE PURPOSE OF THIS ADDENDUM IS TO:
1. Moving the bid submission date to January 28, 2022.
2. The estimated quantities have been updated to the following:
• 2000 cubic yards of debris
• 200 cubic yards of brush
3. The following changes have been made to Attachment A, Section 3: Description of Work.
Replace 2 with the following:
• No burning will be permitted on the site.
Replace 3 with the following:
• All felled trees and chips/debris created by the tops, limbs, brush, and other slash must be removed, loaded, transported and disposed of by Contractor. All chips must be removed from site.
mailto:Carolee.s.will@odot.oregon.gov
| OREGON DEPARTMENT OF TRANSPORTATION |
| REQUEST FOR BIDS (“RFB”) |
| ADDENDUM NO. 1 |
| January 19, 2022 |
| DATE: |
File details come from the government source that posted it. Updated .