Scope of Work for Fort Lauderdale Int’l (FLL) Air Traffic Control Tower (ATCT)

Base Building Administrative Area HVAC Replacement

Scope of Work:

1. Replace the existing base building administrative area condensers, air handler, and other items necessary to make the new condensers and air handler function properly.

2. Dispose of all removed items.

Notes:

- The contractor must provide the prices of replacing the electrical circuits for the air handler and condenser individually since it is currently unknown if this work is necessary.

- Contractor must reuse existing controls.

- The concrete pad for the condenser will have to be replaced, as shown in the drawings.

- The concrete pad for the air handler must be large enough for the new air handler. However, it is the responsibility of the contractor to verify this prior to submitting their bid.

- No testing and balancing (TAB) is required for this project.

- All products to be approved by contracting officer’s representative prior to construction start.

- Existing conditions are to be determined by contractor prior to bid.

- All work is to be performed in accordance with operational risk management procedures established by the FAA.

Point of Contact: Josh Blighton Joshua.blighton@faa.gov

(404) 305-7275