PWS Draft - CL604 - PL Fusion V4.pdf
PDF 85 KB Posted
- Solicitation number
- 34943
About this file
PWS Draft - CL604 - PL Fusion V4 (pdf)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Draft - CL604 - PL Fusion V6 (RFI).RFI | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AJF Flight Program Operations Aircraft Operations Aviation Technology Group Oklahoma City, OK 73169
Federal Aviation Administration
Performance Work Statement (PWS)
Installation of Rockwell Collins Pro Line Fusion and Mission
Specific Equipment On Bombardier Challenger CL-604 Aircraft
Oct 11, 2019
Rockwell Collins Pro Line Fusion and Mission Specific Equipment Challenger CL-604 Aircraft October 1, 2019
Revision History
No. Date Affected Sections Description
1 Oct 11, 2019 All Initial Release
1. GENERAL:
1.1 Ordering Office:
Federal Aviation Administration, AJF Flight Program Operations, Aircraft Operations, Aviation Technology Group, (AJF-1300), has a requirement for a contractor to install Rockwell Collins Pro Line Fusion Avionics and mission specific equipment on one (1) Challenger CL-604 aircraft.
1.2 Date Required:
Completion of installation on FAA’s aircraft must be accomplished no later than Sep 30, 2020.
1.3 Scope of Work:
This requirement is for installation of Rockwell Collins Pro Line Fusion Avionics and mission specific equipment on one CL-604, S/N 5588 (N88). Pro Line Fusion must be installed via Nextant STC ST04356CH.
Mission specific equipment will include installation of:
• Honeywell LaserRef V IRUs
• Military transponder IFF Mode 5
• Flight inspection transponders
• ILS Offset
• GLU-2100 GLS approach
• TACAN
• gogo AVANCE L5
Requirements are specifically defined for some equipment removal of existing equipment.
1.4 Location:
FAA will deliver the aircraft to the Contractor’s designated facility to have the installation work performed. Except when specifically stated (e.g. GFE), the contractor shall be responsible for all cost associated with provisioning their designated facility with materials, supplies, labor, and equipment necessary to complete project at the contractor’s facility.
1.5 Design Review and Approval:
The contractor is responsible for meeting all aircraft certification requirement to deliver the aircraft on a Standard Airworthiness Certificate. In additional to CFR Part 25 requirements the contractor shall ensure that any aircraft modifications are capable of meeting CFR Part 135 requirements
2. DEFINITION OF TERMS:
FPO – FAA Flight Program (FAA organizational symbol AJF)
FAA – Federal Aviation Administration, referred to with regards to contracting and overall FAA airworthiness and certification requirements.
QAF – Quality Assurance Fight
3. GOVERNMENT FURNISHED PROPERTY:
The FPO will deliver the following items to the contractor’s facility. Actual date of delivery will be April 30, 2020 or 45 days after contract award whichever is later unless determined by negotiation between FAA and the contractor.
Tail Number Description Quantity Cost
N-88 Challenger CL-604 S/N 5588 1 $15,000,000
To minimize downtime on the aircraft during modification, the contractor is expected to have design work completed prior to delivery of the aircraft. Prior to aircraft delivery, the FPO will provide necessary data to assist the contractor with design work. This data may include but is not limited to current aircraft configuration, existing drawings, and service bulletins installed.
Part Number Description Quantity Cost
HG2195AB04 Laser IRU 3 $270,250
822-2532-100 GLU 2100 1 $104,664
4079100-0530 Mode 5 Level II Transponder 1 $82,680
4087561-0502 Mode 5 Level II Control Panel 1 $45,692
4088953-0501 Mode 5 Level II Personality Module 1 $2,481
24835-41-U16G Mode 5 Level II GPS Receiver 1 $28,000
AT2775-41W-TNCF-
000-RG-40-NM
Mode 5 Level II GPS/PPS, L1/L2 Antenna (software version 1.6 or later)
1 $1,550
33868-00 Trimble TA-24 Connector Kit 1 $500
FA67.12A ILS Offset Panel 1 $100
822-0709-003 ILS Offset BCU 1 $85,000
4. DELIVERABLES:
Except where specifically stated in Section 3 (GFE), the Contractor must furnish all labor, tools, parts, software/hardware/firmware, expendable/consumable items, and other technical and administrative support necessary to complete the project.
4.1 Pro Line Fusion STC Requirements
The contractor will install Pro Line Fusion per Nextant STC ST04356CH with auto throttle.
The following capabilities shall be included and function as designed:
- FANS 1/A+ and Link 2000+ capability and certification
- MultiScan Weather Radar
- XM Geographical Weather
- TCAS Version 7.1 or later
- Auto throttle system upgraded to most recent version available
- Retain current HUD fully functional (VMC only is acceptable)
- Retain Runway/Event Mark buttons in cockpit
- Retain FMS Circle Search Pattern
4.2 IRU Upgrade Requirements
The three Litton LTN101 IRUs shall be replaced with three GFE Honeywell HG2195 Special Mission Laseref V IRUs. Aircraft navigation certifications must remain equivalent or better than what is currently certified with the LTN101 IRU. The contractor is not required to return the three LTN101 IRUs to the FPO.
There is no requirement for the IRS Mode Select Unit (MSU) to remain operative, but the MSU must be removed if it will be inoperative with the HG2195s installed.
The Triple IRS reversion selectors and functions shall remain unchanged.
The HG2195 “Hybrid” output must function continuously. The Hybrid output is not used by the aircraft systems but is provided and needed by the Flight Inspection System (FIS).
FPO experience has been that “Hybrid” is not continuously available when providing the HG-2195 with both GPS-4000S #1 and #2. Providing a single GPS-4000S does provide continuous Hybrid position output. If the contractor provides only a single input, it shall be from GPS-4000S #1.
4.3 Civil Transponder Requirements
The contractor will replace the existing transponders with Honeywell TRA-100 capable of Low Power and Sensitivity switching for radar flight inspection. Two TDR-94D transponders removed shall be returned to the FPO. The contractor will add cockpit controls in a logical location for selection of Low Power and Sensitivity adjustment. Details of location of cockpit controls will be agreed upon? As Defined in the final review
The contractor shall provide airworthiness certification for both transponders. TCAS V7.1 functionality and indications shall be remain operational.
The power and sensitivity adjustment shall be as follows:
LO PWR SELECT
OFF
LO PWR SELECT
ON
FLT INSP SELECT
OFF
ERP 200-500W
MTL -71 to 77 dBm NOT SELECTABLE
FLT INSP SELECT
ON
ERP 250 W
MTL -69 to -71 dBm
ERP 70-90 W
MTL -69 to -71 dBm
4.4 Military Transponder Requirements
A third transponder for military operations shall be installed. The existing military transponder system installed by STC09491AC-D shall be removed and all components returned to the FPO. It shall be replaced with an ADS-B and IFF Mode 5 capable system.
Necessary hardware including transponder, control head, personality module, GPS TA-24 receiver, TA-24 connector kit and GPS antenna will be GFE.
The contractor shall provide airworthiness certification for the transponder installation and all functions of a civil transponder including Mode 3A, Mode C, and ADS-B Out. All military capabilities shall provide intended function. The FPO will accept responsibility for military certification requirements after project completion. The FPO may conduct AIMS ground testing concurrent with contractor civil certification ground testing; however, the FPO and contractor must agree to this schedule at least 30 days in advance.
When the military transponder is selected and used, TCAS V7.1 functionality and indications shall remain operational.
4.5 TACAN Nav Source Requirements
The contractor shall install a TACAN receiver capable of selection as a Navigation source on both Pilot Flight Displays (PFD). Airworthiness certification is required for intended function only. The contractor is responsible for providing antenna installation if an additional antenna is required.
4.6 ILS Offset Requirements
October 1, 2019
An ILS Offset Panel and Bus Conditioning Unit (BCU) will be installed for ILS flight inspection operations. The contractor shall provide airworthiness certification and the system must be limited to VMC operation only. The FPO will provide the BCU, ILS Offset Panel, and design data used in other FPO flight inspection aircraft.
Selection of offset must be displayed on the left side PFD. The lateral offset will provide a centered indication when 150 micro-amps left/right of the localizer course. The vertical offset will provide a centered indication when 75 micro-amps below/above the glideslope.
Using the provided BCU will provide the required offset performance. The ILS control panel shall be mounted in a location that provides selection by either pilot and the amber offset indications in the pilot’s primary field of view.
4.7 GLS Nav Source Requirements
The contractor shall install GFE GLU-2100 receiver and provide selection of GLS as navigation source on either Pilot Flight Display (PFD). If GLS channel selection is not integrated into the Pro Line Fusion avionics, the contractor shall provide a means of GLS channel selection. Airworthiness certification is not required for primary IFR navigation.
The contractor is responsible for providing antenna installation if an additional antenna is required.
4.8 Voice/Data Upgrade Requirements
The contractor will install and integrate a GOGO AVANCE L5 system. If a new system is available at the time of installation, it may be used providing it has equivalent or better function and the FPO agrees. The installed system shall function as intended in the GoGo North American operational network.
The contractor shall remove the following components from the INMARSAT system installed when the aircraft was initially certified. This system is currently deactiated.
- Remove SATCOM System Items (SRT-2100 P/N 822-2023-001, Tray P/N 6117-103.
Antenna Assembly P/N 0476-A-00377, Antenna Driver P/N 0811-A-0001, LNA/Duplexer P/N A476-A-00364)
- Remove Magnastar System Items (Air Radio Telecom Unit P/N 724855-804, ARTU Mounting Tray P/N 724868-802, Duplexer P/N 620317-2, Antenna P/N 902131-2, Cabin DB Repeater 3 P/N 72864-810, Cabin DB Repeater 2 P/N 902205-803)
4.9 Supporting Data and Manuals
October 1, 2019
Following modification, the contractor will complete an actual aircraft weight measurement to establish the aircraft new empty weight. The empty weigh information will be provided to the FPO for incorporation into the FPO Weight and Balance program.
The contractor will provide the following documentation, as required, in searchable PDF format:
- Aircraft Flight Manual Supplements
- Operator Guides
- Pilot Guides
- Maintenance Manuals, including available component maintenance manuals
- Instructions for Continued Airworthiness
- Drawings and Dictionaries including the Pro Line Fusion data dictionary
5. Project Management
5.1 Technical and Cost Proposal
The contractor will provide the FAA with a preliminary project management plan with the technical proposal. Both are due by the closing date and time set by the SIR. The preliminary project management plan and technical proposal shall be provided as a separate document from the contractor’s cost proposal.
5.2 Management Roles
Contractor Project Manager (PM) – The contractor shall designate a PM to be the central point of contact for managing communication with the FAA/FPO. The PM shall be prepared at all times, given reasonable notice, to present and discuss with the FAA/FPO the status of contract activities.
FAA Contracting Officer (CO) – The FAA will designate the primary CO.
FPO Contracting Officer’s Representative(s) (COR) – The FPO will designate the primary COR and any alternate CORs.
FPO Technical Monitor(s) (TM) – The FPO will designate a primary TM and system specific TMs as required for communication on technical matters relating to project requirements.
5.3 Aircraft Delivery and Downtime
The contractor shall complete certification plans, design work, and FPO design reviews to perform installation, testing, and FAA approvals in the minimum aircraft downtime possible.
Downtime is defined as the time from aircraft delivery to the contract facility and when the aircraft is returned to the FPO on a standard airworthiness certificate. The aircraft downtime shall not exceed 150 total days; however project goal is aircraft downtime no more than 120 total days.
A quality assurance flight (QAF) will be conducted on the flight delivering the aircraft to the contractor’s facility. The QAF pilot will document all aircraft discrepancies into the Aircraft Logbook within 24 hours of delivery.
5.4 Design Review Process
The contractor may use any design review process required to achieve the desired and/or required downtime goal. As a minimum the contractor shall complete a preliminary design review within 60 days of contract award and a critical design review no later than 30 days prior to aircraft delivery to the work location.
5.5 Installation and Quality Control
The contractor shall provide the FPO with a workspace for an on-site FPO quality control representative during the installation phase of this effort.
All equipment removed from the aircraft, if serviceable, shall be tagged utilizing the FAA form 8130-3 and returned to the government, in accordance with FAA Order 8130.2H or
October 1, 2019 later revision, Para 3-4. Issuance of FAA Form 8130-3 for Used Products and Articles Removed from a U.S.-Certificated Aircraft for Installation on Another U.S.-Certificated Aircraft.
FAA Form 8130-3 may be issued for approval for return to service of those products and articles removed from a U.S.-certificated aircraft (under an operating certificate in accordance with part 121 or part 135) for use on another aircraft operated under the same air carrier certificate. The removal and installation of products and articles must be accomplished in accordance with the air carrier’s approved maintenance program or other acceptable methods, techniques, and practices; or FAA-approved/accepted data that is acceptable to the air carrier’s approved maintenance program. The use of FAA Form 8130-3 for this purpose is optional.
Those products and articles removed from a U.S.-certificated aircraft other than those referenced in paragraph 3-4a must have an airworthiness determination made in accordance with § 43.13(a) and (b) by an FAA-approved air agency or U.S. air carrier.
This also includes compliance with applicable ADs, modification status, and total time/cycles for those products and articles as required by §§ 91.417, 121.380, and
135.439. The use of FAA Form 8130-3 for this purpose is optional, but the FAA recommends its use.
5.6 Ground Testing
The contractor shall allow FPO personnel to participate in final ground testing to identify acceptance issues at the earliest opportunity for correction. This will include FPO AIMS testing for certification requirements on the military transponder.
5.7 Flight Testing
The contractor may require one or more flight tests for show compliance to meet certification requirements. The contractor shall have full responsibility for conducting all required flight tests. If requested, the FPO will provide a test pilot to act as SIC for some or all flight test activities.
5.8 FAA/FPO Acceptance
FPO will provide the contractor with acceptance QAF criteria at least 14 days prior to expected delivery date.
After the contractor has completed the installation, ground test, flight test, and returned the aircraft to standard airworthiness certificate, the contractor will complete a walk around safety check. Following the contractor’s walk around safety check, the FPO will complete an acceptance QAF. Any aircraft discrepancies relating to Pro Line Fusion components or mission specific equipment added in this project will be the responsibility of the contactor to resolve.
| 1. GENERAL: |
| 1.1 Ordering Office: |
| 1.2 Date Required: |
| 1.3 Scope of Work: |
| 1.4 Location: |
| 1.5 Design Review and Approval: |
| 2. DEFINITION OF TERMS: |
| 3. GOVERNMENT FURNISHED PROPERTY: |
| 4. DELIVERABLES: |
| 4.1 Pro Line Fusion STC Requirements |
| 4.2 IRU Upgrade Requirements |
| 4.3 Civil Transponder Requirements |
| 4.4 Military Transponder Requirements |
| 4.5 TACAN Nav Source Requirements |
| 4.6 ILS Offset Requirements |
| 4.7 GLS Nav Source Requirements |
| 4.8 Voice/Data Upgrade Requirements |
| 4.9 Supporting Data and Manuals |
| 5. Project Management |
| 5.1 Technical and Cost Proposal |
| 5.2 Management Roles |
| 5.3 Aircraft Delivery and Downtime |
| 5.4 Design Review Process |
| 5.5 Installation and Quality Control |
| 5.6 Ground Testing |
| 5.7 Flight Testing |
| 5.8 FAA/FPO Acceptance |
File details come from the government source that posted it.