SOW Confined Space Entry Rescue 2027.docx

DOCX document 45 KB Posted

Download DOCX, 45 KB

Attached to
US COAST GUARD NSFCC CONFINED SPACE TRAINING
Solicitation number
34359RFQ270000002
Issued by

About this file

This is a Statement of Work (SOW) for confined space entry and rescue training support services to be provided to the U.S. Coast Guard's National Strike Force. The contractor shall deliver three separate course convenings across three geographic locations (Fort Dix, New Jersey; Mobile, Alabama; and Novato, California) within a one-year period of performance ending September 30, 2027. Each convening will accommodate up to 20 students for Confined Space Entry Training and up to 12 students (who completed Entry Training) for Confined Space Rescue Training, with both courses and a final skills exercise completed within five days per location. Training must comply with 29 CFR 1910.146 and NFPA Standards 350, 1006, and 1670, emphasizing hands-on practical exercises comprising at least 60 percent of curriculum. The contractor must provide a Project Manager designated as Key Personnel and qualified instructors with minimum five years combined experience in confined space entry and rescue operations while in personal protective equipment levels A and B. All training materials, including course curriculum, PowerPoint presentations, student handbooks, written tests, certificates, and equipment, are contractor-furnished except for government classroom facilities and certain NSF-provided resources upon request.

Deliverables include a proposed course agenda and evaluation questionnaire submitted with the quote, course manuals and materials provided at training, completed student evaluations within 15 days after course completion, a consolidated evaluation report with enhancement recommendations within 15 days post-course, completion certificates within 15 days post-course, and an assessment of each team's confined space equipment for standardization within 15 days. The contract is solicited as RFQ 34359RFQ270000002 through the Department of Homeland Security U.S. Coast Guard with a 100 percent small business set-aside. The solicitation is structured as a combined synopsis/request for quotation with award anticipated as a firm-fixed-price purchase order, and quotations should be submitted via email to contacts listed in SAM.GOV.

View the file

Other files

File Type Posted
SOW Confined Space Entry Rescue 2027.docx DOCX document

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR SUPPORT SERVICES FOR THE U.S. COAST GUARD’S NATIONAL STRIKE FORCE CONFINED SPACE ENTRY AND CONFINED SPACE RESCUE COURSES Dated: 17 Aug 2026

1.0 GENERAL

1.1 SCOPE

The National Strike Force (NSF) requires contract support services to provide Confined Space Entry and Rescue Training Classes for personnel in personal protective equipment (level “A” and “B” responses). The final day will be dedicated to a skills exercise to evaluate how well participants apply the knowledge gained during the week's training. The contract will have a one-year period of performance. The Contractor will provide three (3) course convenings of up to twenty (20) students for Confined Space Entry Training and up to 12 students (that had the Confined Space Entry Course) for Confined Space Rescue Training. Both courses and exercise should be completed within 5 days (example: 2 days Entry, 2 days Rescue and 1 day skill exercise or something similar) and be completed prior to the last day of September 2027. The USCG will own the training courses, and a copy of all training materials created for the course shall be provided to the NSF. An audit will be completed to update material as needed due to regulation changes, mission changes and all other unforeseen circumstances. All training classes shall take place at USCG facilities.

1.2 BACKGROUND

The National Oil and Hazardous Substances Pollution Contingency Plan, more commonly called the National Contingency Plan (NCP), is the federal government’s blueprint for responding to both oil spills and hazardous substance releases. The NCP includes a framework for responding to hazardous substance spills as well as oil discharges, in addition to releases at hazardous waste sites requiring emergency removal actions.

Within the NCP, the NSF Strike Teams (NSFST) are designated as Special Teams required to maintain the standing ability to support Coast Guard, Environmental Protection Agency (EPA), and the Department of Defense pre-designated Federal On-Scene Coordinators for any discharge or substantial threat of discharge of oil into a navigable waterway of the U.S., or a release or substantial threat of a release of a hazardous substance, pollutant, or contaminant into the environment of the U.S.

Confined spaces are one of the most hazardous operational environments NSFST personnel may be required to enter. NSFST members are required to maintain capabilities to enter and conduct response operations in confined spaces on shore as well as in a maritime domain. Additionally, NSFSTs are required to have personnel trained to perform confined space rescue operations in case of emergency. In order to maintain standardization amongst the NSF, students have been identified who will complete Confined Space Entry and Confined Space Rescue training at each of the NSFSTs.

1.3 CONTRACTOR PERSONNEL QUALIFICATIONS

1.3.1. Project Manager. The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this contract. The Project Manager shall be a single point of contact for the Contracting Officer (KO) and the NSF Center of Expertise (COE) Point of Contact (POC). It is anticipated that the Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the Contractor in the absence of the Project Manager, shall be provided to the Government as part of the Contractor's proposal. During any absence of the Project Manager, only one alternate shall have full authority to act for the Project Manager on all matters relating to work performed under this contract. The Project Manager and all designated alternates shall be able to read, write, and speak and understand English, and be citizens of the United States. Additionally, no alternate shall replace the Project Manager without prior acknowledgement from the KO. The Project Manager is designated as Key Personnel.

1.3.2 Qualified Personnel. The Contractor shall provide qualified personnel to perform all requirements specified in this contract. The instructor must have at least five (5) years combined experience as an instructor in the field related to this task order and in conducting Confined Space Entry and Confined Space Rescue operations while in personal protective equipment (level “A” and “B” responses). The instructors shall be designated as Key Personnel.

1.3.3 Employee Identification. Contractor employees visiting Government facilities shall have a valid driver’s license; comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent, display their identification and visitor badges in plain view above the waist at all times.

1.3.4 Employee Conduct. Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, securing, “off limit areas”, possession of weapons) if visiting or working at Government facilities. The contractor shall ensure contractor employees present a professional appearance at all times and that their conduct does not reflect discredit on the United States, the Department of Homeland Security, or the USCG.

1.3.5 Removing Employees for Misconduct or Security Reasons. The Government may, at its sole discretion, direct the Contractor to remove any Contractor employee from USCG facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under this contract. Contractor access to Sensitive but Unclassified (SBU) information may be required.

Contractor employees shall safeguard this information against unauthorized disclosure or dissemination.

The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

1.3.6 Key Personnel. Before replacing any individual designated as Key by the Government, the Contractor shall notify the KO no less than 15 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes shall possess qualifications equal to or superior to those of the Key person being replaced. The Contractor shall not replace Key Contractor personnel without acknowledgment from the KO and POC. The Project Manager and Instructors are considered Key Contractor personnel for this contract.

1.4 CONFLICT OF INTEREST.

The Contractor shall not employ any person for work under this contract who is an employee of the United States Government if that employment would or could appear to cause a conflict of interest.

1.5 PLACE OF PERFORMANCE.

The primary place of performance will be at the three NSFSTs where the trainings shall take place. The Government will provide all classroom facilities. There will be one convening per location. The locations of the three NSFSTs are:

1. Atlantic Strike Team: Fort Dix, New Jersey

2. Gulf Strike Team: Mobile, Alabama

3. Pacific Strike Team: Novato, California

2.0 GOVERNMENT TERMS AND DEFINITIONS

2.1 COE POC- Center of Expertise Point of Contact

2.2 NSF- National Strike Force

2.3 NSFST- National Strike Force Strike Team

2.4 FOSC- Federal On-Scene Coordinator

2.5 NCP- National Contingency Plan

2.6 PWS- Proposed Work Statement

2.7 EPA- Environmental Protection Agency

2.8 KO- Contracting Officer

2.9 TC- Training Coordinator

2.10 NFPA – National Fire Protection Association

3.0 GOVERNMENT FURNISHED RESOURCES & INFORMATION.

The Government will provide notice to the Contractor requesting a course convening not less than twenty-one (21) calendar days in advance. At least fourteen (14) days prior to each course convening, the Government POC will provide the Contractor with the student roster for each class with the names of students registered for each course. The roster will consist of personnel of varying experience levels. The initial roster may change prior to the course date due to cancellations and substitutions based on operational requirements.

The Government will provide, at the request of the Contractor, resources such as projectors or computers for the intended purpose of class instruction. The NSFSTs Confined Space equipment will be available at each team and preferred for use during the training. The Instructor shall provide feedback on condition and maintaining the standardization of the Confined Space Equipment within the three teams.

4.0 CONTRACTOR FURNISHED PROPERTY.

With the exception of Government Furnished Resources specified in section 3.0 of this work statement, the Contractor is responsible for providing the following to fulfill the requirements of this purchase order:

4.1 The Contractor shall have all required gear, instruments, personal protective equipment, and any other necessary resources to provide instruction. The Government has included an NSF Confined Space Equipment Manifest to assist the Contractor with familiarization of NSF confined space equipment (see attachment). Any deviations from this must be approved by the Government POC prior to awarding the quote.

4.2 The Contractor will provide members with confined space training materials which will include the following at a minimum: course curriculum, power point presentations, student handbook, and written tests.

5.0 REQUIREMENTS

5.1 GENERAL REQUIREMENTS

5.1.1 Period Of Performance. The period of performance for this contract shall be between the date this contract is awarded and September 30, 2027. No additional changes to this Statement of Work, course curriculum, or cost adjustments will be authorized or paid, unless approved in writing by the contracting officer, CWO Mandi McKinsey.

5.1.2 Course Currency. The Contractor shall develop the course based on the most recent and applicable references outlined in compliance with 29 CFR 1910.146 and ProBoarded to NFPA 1006 Standards for Confined Space Rescue Awareness and Operations levels.

5.1.3 Course Length, Curriculum And Syllabus. The course length, curriculum, and syllabus will be determined by current course requirements in 5.1.2. but shall not exceed 5 days. Any changes must be submitted to the Government POC for approval no less than thirty (30) days prior to class convening.

5.1.4 Target Audience. The course shall be suitable and adapted to accommodate the learning needs of students with both limited and extensive Confined Space Entry and Confined Space Rescue knowledge. Students will have completed Confined Space Awareness Training prior to course dates and are HAZMAT Technicians. Please note that the previously mentioned Confined Space Awareness Training does not meet the job performance requirements (JPRs) listed in NFPA 1006 Chapter 7.1.

5.1.5 Course Content. The curriculum shall be a mix of hands-on/practical exercises and classroom/written examinations. Hands-on training should be stressed whenever possible. At a minimum, hands-on/practical exercises shall make up at least sixty (60%) of the course curriculum. Members should be thoroughly familiar and in compliance with 29 CFR 1910.146 and applicable NFPA Standards upon completion of training. The purpose of this training is to provide students with the knowledge and skills in the tactics, techniques, and procedures to safely execute confined space entry and rescue operations on shore as well as in a maritime domain. Proficiency should be evaluated and documented by using a written assessment and a skill demonstration, which will be provided by the Contractor. The assessment and demonstration should evaluate the knowledge and individual skills developed while training. The Contractor shall specify in writing the minimum level of proficiency required to successfully complete the course.

These additional NSF capabilities shall be included:

1. Demonstrate the ability to act as an Entry Member. (All Members)

2. Perform the role of the Attendant Member. (Response Technicians and above)

3. Perform the role of a Confined Space Entry Supervisor. (Response Supervisors and Officers)

4. State the required training and documentation for personnel assigned to the Confined Space Rescue Team. (Response Supervisor) The additional Confined Space Rescue Team capabilities shall be in accordance with 29 CFR 1910.146 (k)(2)(ii) and NFPA standards. Personnel attending only the rescue team portion of the training will be validated by the employer as current in their certification as at least a confined space entrant.

5.2 TRAINING MATERIALS

5.2.1 Course Preparation. The Contractor shall be responsible for setting up the training facility, classroom furniture layout, laying out participant materials, and preparing equipment and instructor aids. (The Training Coordinators at each NSFST will provide information to the contractor on facility locations, training venues for practical demonstrations, and other logistics.)

5.2.1

5.2.2 Student Materials. The Contractor shall prepare and provide all required student materials (course manuals, workbooks, handouts, quizzes, tests, completion certificates, a final roster of participants, and course critique forms).

5.2.3 Equipment. The Contractor shall provide all materials and equipment required for training as listed in Section 4.1.

5.3 COURSE EVALUATION

5.3.2 Proposed Evaluation. The Contractor shall provide a proposed course evaluation questionnaire with all submitted proposals and bids.

5.3.3 Evaluation Content. The Contractor shall provide a course evaluation questionnaire to be completed by all participants at the end of each course. The questionnaire shall be directed toward eliciting participants’ comments as to the value of the material taught, recommended changes and/or additions, and the quality of the instruction.

5.3.4 Evaluation Consolidated Report. The Contractor shall provide a consolidated report of the evaluation responses with recommendations for course enhancement no later than fifteen (15) days after the course ends to the Government POC.

5.4 COURSE CERTIFICATES

The Contractor shall provide a certificate attesting to successful completion of the course no later than fifteen (15) days after completion of the course. The certification shall contain the following:

· Student’s name.

· Course title (specify completion of Confined Space Entry, Rescue, or both).

· Course date.

· Statement that the student has successfully completed the course.

· Name and address of the training provider.

· An individual identification number for the certificate.

· State references covered for the course (as in 6.0).

· State requirements met for Confined Space Rescue Awareness & Operations Levels IAW NFPA Standard 1006 (only applies to students completing both Confined Space Entry and Rescue requirements)

· If met, state that an 8 hours HAZWOPER refresher course has been met by 29 CFR 1910.120.

6.0 REFERENCES.

Title 29 CFR Part 1910.146, Permit-required Confined Space Entry and Rescue NFPA Standard 350, Guide for Safe Confined Space Entry and Work.

NFPA Standard 1006, Standard for Technical Rescue Personnel Professional Qualifications NFPA Standard 1670, Standard on Operations and Training for Technical Search and Rescue Incidents.

(All references are latest versions)

7.0 DELIVERABLES.

The Contractor shall provide the following in their quote and upon course completion:

ITEM
DELIVERABLE / EVENT

BY

1
Proposed Course Agenda
5.1.3
In quote.
2
Proposed Course Evaluation
5.3.1
In quote.
3
Course manuals, handouts, quizzes, tests
5.2
In quote (one example of each) and provide at training to each student.
4
Completed Student Course Evaluations
5.3.3
NLT 15 days after course completion.
5
Course Consolidated Report
5.3.4
NLT 15 days after course completion.
6
Course Completion Certificate
5.4
NLT 15 days after course completion.
7
Evaluate each team’s Confined Space Equipment for standardization
3.0
NLT 15 days after Provide Statement

Attachments:

(1) NSF Standard Equipment Manifest for Confined Space mission.

(2) NSF Performance Qualification Standard for Confined Space.

File details come from the government source that posted it. Updated .