EXHIBIT B, ATTACHMENT NO. 2

MISSION SUPPORT AND TEST ERVICES, LLC

TIME-AND-MATERIAL CONSTRUCTION SUBCONTRACT

CONTRACTOR-FURNISHED ITEMS

SPECIFICATION FOR DRILLING RWMC MONITOR WELL (UE5MW-4)

The CONTRACTOR shall furnish, at the work sites, the following items, facilities, and services for the work under this Subcontract:

1. Maintained access roads to the surface location and water loading facilities.

2. Surface location adequate for SUBCONTRACTOR to perform work under this specification (Paragraph 1.8 of the Specification). This includes a 200 ft. X 200 ft. cleared and graded drill pad with the borehole location in the center of the pad and sump per SUBCONTRACTOR specifications.

3. Installation of 13-3/8 inch – 16 inch outside diameter (OD) conductor casing in 26 inch borehole from surface to approximately 118 feet below surface with conductor casing X borehole annulus cemented from total depth to the surface.

4. Water availability at loading facilities at Contractor-approved locations within one-quarter (1/4) mile of the well site.

5. Tubular goods for construction and completion as specified, including handling equipment such as spiders, slips, elevators, and lifting subs for all Contractor-furnished tubular goods. This includes all production casing.

a. Conductor casing per Item 3.

b. Five and nine sixteenths (5-9/16) inch OD stainless steel, flush joint production casing, plain and slotted.

6. Geophysical, gyroscopic logging services and stemming monitoring services, as required.

7. Geologic sampling and processing, as required.

8. Collection and analysis of groundwater samples as required.

9. Transportation of applicable Contractor-furnished items, except water, to and from the well sites.

10. Housing, meals and recreational facilities at regular cost and to the extent available on the NNSS. SUBCONTRACTOR personnel to be responsible for payment for any housing, meals and recreational expenses.

11. A minimum of two portable toilets with routine servicing at the drill site for SUBCONTRACTOR’s use.

12. Two days of training just prior to mobilization to the drill site as detailed in Paragraph 1.4.1 of the Specification.

13. Electricians/Wiremen and materials to hook-up SUBCONTRACTOR’s equipment and facilities to the on-site grounding grid.