21 INCH BALLISTIC SCUTTLE Federal contract opportunity
Solicitation number
SPMYM2-23-Q-2260
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a justification for urgency statement for a federal procurement. The statement identifies the need to procure one 21 inch ballistic scuttle, NSN 2040-01-663-7914, by December 18, 2023 for use on a DDG ship. The current scuttle is deteriorated and its safety latch has failed, located in the helicopter flight operations area. Failure to replace the scuttle by the required delivery date could impact personnel safety, as it is an emergency escape scuttle for that space. The statement details how the need was identified by ship's force during planned maintenance in July 2023, repair was attempted but unsuccessful, and it was scheduled for the earliest available maintenance period in December 2023. The minimum quantity to be procured is one scuttle due to the urgent need to replace it by the required delivery date.

View the file

Other files for this federal contract opportunity

Other files attached to 21 INCH BALLISTIC SCUTTLE, newest first.
File Type Posted
SPMYM2-23-Q-2260.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR URGENCY (SIMPLIFIED ACQUISITIONS $10,000 to $250,000) Ref: FAR 13.106

The service or material listed on (Document number) ___3248-5921_______________________ is urgent and advertising requirements are precluded for reasons indicated below. If the service/material is not received by the Required Delivery Date (RDD), specific damages to the Navy will result.

1. Suggested Source(s) (complete with addresses, phone and fax numbers):

(1)_PACSHIP:1625 Rigel Street, San Diego CA. 92113, # (619) 232-3200, EXT 240, FAX (619) 450-4141 POC: Marko Sevilla

In the spaces above, provide the name of all known suppliers of the required product, preferably a minimum of three manufacturers. (Although the purchasing office maintains a list of sources, it is best to provide sources you know meet your requirements so that valuable time is not wasted in soliciting and evaluating offers from companies who can't meet your needs.

Attach a copy of any market research conducted on potential offerors.)

2. Brief descriptive narrative of service or material required:

____ NSN: 2040-01-663-7914__21 Inch Ballistic Scuttle, _BIW # 22184-059, DWG#8100-1253-0253-0237 ASSY 56

3. Required Delivery Date (RDD):_18 Dec, 2023_____________________________________________

4. Describe the resulting damages if the above required delivery date is not met. Explain why the service/material is needed impact to base support, personnel safety issues, potential environmental damages, etc.) The impact should be expressed as the daily cost (labor, material, etc.) to the government for each day of delay beyond the RDD.

Entire Deteriorated Scuttle requires replacement. Safety Latch has failed. /54 CAL Magazine Loader Equipment Compartment. Availability start date is 18 DEC, 2023. Scuttle is an Emergency Escape Scuttle for this space.

Scuttle is located in the Helicopter Flight Operations Area.

5. Lack of prior planning does not support urgency. Please provide a time-line beginning on the date the need was first identified and ending on the date the requisition was submitted to the Purchase Branch. Why is the claimed "urgency" not the result of a lack of advanced planning?

The current DDG Maintenance Cycle is based on CMAV Availabilities. Material availability is a primary factor for identifying maintenance that gets scheduled. Ships force identified the condition while conducting Planned Maintenance. Ships Force attempted to repair the equipment using the Damage Control Technician on board. When that effort was not successful, the Damage Control Assistant notified the Port Engineer (23 JUL23) and the 21 Inch Escape Scuttle was scheduled for the soonest posable availability. (4A1) (18DEC23) the Project Team Planned the Work and with a manufacture quote, identified this equipment as Long Lead Time Material. (8/15/23) Request was made to purchase the 21 Inch Ballistic Escape Scuttle.

Material. The Port Engineer provided funding, (8/31/2023)

6. Only our minimum current requirements can be purchased under conditions of urgency. What is the minimum quantity that must be obtained by the RDD? Why can't some of the total required quantity be procured under urgency while procuring the remaining items/services through the normal procurement process?

One Each 21 Inch Ballistic Escape Scuttle

I CERTIFY THAT STATEMENTS CHECKED ABOVE ARE COMPLETE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND DO NOT CONTAIN CLASSIFIED INFORMATION. I UNDERSTAND THAT PROCESSING THIS URGENCY STATEMENT COULD PRECLUDE THE FULL ADVERTISEMENT OF THIS PROCUREMENT.

CONTRACTING OFFICER:

DLA Maritime Puget Sound Urgency Statement

DATE:

05/21/2018

09/08/2023

File details come from the government source that posted it. Updated .