This Addendum #1 to Invitation to Bid (ITB) S-63500-00018257 is issued by the Oregon Department of Fish and Wildlife (ODFW) in coordination with the Bureau of Land Management (BLM) for the High Desert Sage Steppe Habitat Restoration project. The addendum addresses questions raised during the mandatory pre-bid conference held on November 3, 2026, and provides clarifications regarding project scope and implementation. The work involves hand severing, lopping, piling, and covering of western juniper on approximately 5,693 acres of BLM land in 10 prioritized units south of U.S. Highway 20 near Brothers, Oregon. The project aims to reduce wildfire risk and improve habitat for mule deer, greater sage-grouse, and other sage steppe-dependent species. Bids are due November 25, 2026, at 2:00 p.m., and work must be completed by June 30, 2027, with invoices due by July 31, 2027. The addendum indicates that no changes were made to the original ITB closing date and time.
Key clarifications provided include that the total number of units treated will be bid-dependent based on available funding of $90,000.00, with treatment prioritized by unit order (1–10). The addendum confirms that no piling and cover requirement applies to this project, only live-standing material must be cut, and roads will remain open during project execution. Motorized vehicle access (ATVs) and horses are permitted with prior written approval from BLM, with the requirement to exit treated areas via different routes to prevent trail creation. Georeferenced maps are available upon request, and unit boundaries will not be flagged by agencies. Exemptions to work during big game winter range closures and within raptor buffers may be granted at agency discretion following appropriate surveys and weather consideration. The addendum specifies that BLM is confirming whether work within the powerline right-of-way is required, with additional information to follow.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
ITB S-63500-00018257
HIGH DESERT SAGE STEPPE
HABITAT RESTORATION
November 5, 2026
This addendum modifies the Invitation to Bid (ITB) document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.
Deleted language is shown within [brackets and strikethrough]. New language is show in Bold and Underlined.
ADDENDUM
1. No Changes have been made to the Invitation to Bid document(s).
Closing Date and Time: Remain unchanged
QUESTIONS AND ANSWERS:
Following are questions asked during the Mandatory pre-bid conference held on November 3, 2026, and ODFW’s answers. The answers and clarifications provided below by ODFW are for informational purposes ONLY and DO NOT constitute a change to the terms, conditions, technical specifications, or requirements of the ITB.
1. Question: How many units are you hoping to get to?
Answer: The goal is to treat as many units as possible by priority order (1-10) given available funding; total unit numbers treated will be bid dependent.
2. Question: How much funding is available?
Answer: $90,000.00
3. Question: Which roads will be open for usage/access?
Answer: ODFW does not anticipate any road closures during this project
4. Question: Should any dead material be trimmed?
Answer: No, only live-standing material is required to be cut.
ADDENDUM #1 – ITB S-63500-00018257 2
5. Question: Are we supposed to cut/clear within the powerline ROW?
Answer: BLM is confirming if work within the powerline boundary is required, more info to be provided.
6. Question: Is motorized vehicle access allowed (ATVs)?
Answer: Yes, with prior written approval from BLM. If driving into unit areas, drive out a different way so as not to create trails.
7. Question: Are using horses allowed?
Answer: Yes
8. Question: Will it be OK to bring fire equipment (tanks, trailer)?
Answer: Yes
9. Question: Are Georeferenced maps available?
Answer: Yes, maps are available by request. Email the SPC to make request.
10. Question: Will ODFW or BLM would be flagging unit boundaries or leave trees?
Answer: Agencies will not be flagging unit boundaries (including private property lines), and there is very minimal flagging within the units designating leave trees due to a nest being located within the tree.
11. Question: Will exemptions to allow work to continue during winter range closure periods be granted?
Answer: Yes, Permission to continue working during big game winter range closures can be requested through BLM and ODFW. The Agencies will and their discretion, taking into consideration current and expected weather conditions. Exemptions for work within raptor buffers will be granted after BLM surveys and finds no nesting raptors present.
CLARIFICATIONS
1. There is no requirement to pile and cover for this project.
Addendum prepared by:
Jake Howard PCS III emailaddress@odfw.oregon.gov
END OF ADDENDUM No. 1 mailto:emailaddress@odfw.oregon.gov
Closing Date and Time: Remain unchanged