CLARIFICATION FAA Power service roof replacement questions_ Reply 04222018.pdf

PDF 39 KB Posted

Attached to
INSTALLATION OF FIVE ROOFS AT SALT LAKE CITY, UT
Solicitation number
32111
Issued by

About this file

CLARIFICATION FAA Power service roof replacement questions_ Reply 04222018 (pdf)

View the file

Other files

File Type Posted
ZLC PSB Roof Package 08082018.pdf PDF
RFI 2 Q.docx DOCX document
customer satisfaction survey.docx DOCX document
1442 697DCK-19-R-00137.pdf PDF
wage determinations.txt TXT text file
Sol_697DCK-19-R-00137 revised.pdf PDF
21 SF-30 AMEND-ROOFING JOB SLC.pdf PDF
21 SF-30 AMEND-ROOFING JOB 2 SLC.pdf PDF
Sol_697DCK-19-R-00137 revised.pdf PDF
CLARIFICATION FAA Power service roof replacement questions_ Reply 04222018.pdf PDF
ZLC PSB Roof Package 08082018.pdf PDF
1442 697DCK-19-R-00137.pdf PDF
customer satisfaction survey.docx DOCX document
wage determinations.txt TXT text file
21 SF-30 AMEND-ROOFING JOB SLC.pdf PDF
customer satisfaction survey.docx DOCX document
ZLC PSB Roof Package 08082018.pdf PDF
Sol_697DCK-19-R-00137 revised.pdf PDF
wage determinations.txt TXT text file
1442 697DCK-19-R-00137.pdf PDF
wage determinations.txt TXT text file
Sol_697DCK-19-R-00137 revised.pdf PDF
ZLC PSB Roof Package 08082018.pdf PDF
1442 697DCK-19-R-00137.pdf PDF
ZLC PSB Roof Package 08082018.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAA Power service roof replacement questions

1. The drawings show 4ea ladder replacements is this correct? If so is there any approximant height measurements. Or should we just use the building elevations.

Reply: Yes, 4 ladders and Refer to Drawing “….LADDER DETAILS” DWG # ZLC-1402606-S001 for details.

Ladders must meet all minimum safety requirements as specified in the Specifications.

2. The drawings are showing fiberglass railings on 3 of the 5 roofs that are being reroofed. There is also a drawing that indicates handrail on the administration building, are we to include the administration building in our proposal?

Reply: Yes, these roofs need to have the railing added (Dimensions shown on the drawing no. ZLC- 1402606-A009)