CLARIFICATION FAA Power service roof replacement questions_ Reply 04222018.pdf
PDF 39 KB Posted
- Attached to
- INSTALLATION OF FIVE ROOFS AT SALT LAKE CITY, UT
- Solicitation number
- 32111
About this file
CLARIFICATION FAA Power service roof replacement questions_ Reply 04222018 (pdf)
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAA Power service roof replacement questions
1. The drawings show 4ea ladder replacements is this correct? If so is there any approximant height measurements. Or should we just use the building elevations.
Reply: Yes, 4 ladders and Refer to Drawing “….LADDER DETAILS” DWG # ZLC-1402606-S001 for details.
Ladders must meet all minimum safety requirements as specified in the Specifications.
2. The drawings are showing fiberglass railings on 3 of the 5 roofs that are being reroofed. There is also a drawing that indicates handrail on the administration building, are we to include the administration building in our proposal?
Reply: Yes, these roofs need to have the railing added (Dimensions shown on the drawing no. ZLC- 1402606-A009)
File details come from the government source that posted it.