32_63-306-935-001.pdf
PDF 176 KB Posted
- Solicitation number
- IFB197195
- Issued by
- Santa Clara County, California
About this file
This is an Invitation for Bids (IFB) document issued by the City of Palo Alto Utilities Department for the repair and refurbishment of Adobe Creek Transformer-21, a 15 MVA Allis Chalmers substation transformer located in Santa Clara County, California. The scope of work includes complete replacement of the existing 1967 TLH-21 on-load tap changer (OLTC) with a certified remanufactured unit, comprehensive oil handling and processing for approximately 4,348 gallons from the main tank and 760 gallons from the OLTC tank, replacement of radiator valves and gaskets, removal and replacement of the 60 kV SMD fuse holder, and execution of pre- and post-work diagnostic testing including power factor testing, turns ratio (TTR) testing, excitation testing, winding resistance measurement, sweep frequency response analysis (SFRA), dissolved gas analysis (DGA), and oil quality analysis. Electronic bid submissions are due by 3:00 p.m. on April 9, 2026, with questions and clarifications due by 1:00 p.m. on March 30, 2026. Work is anticipated to commence on or about July 1, 2026, with completion required within eighty (80) calendar days from the Notice to Proceed, subject to liquidated damages of five hundred dollars ($500) per day for unexcused delays beyond the contract completion date.
The contract will be awarded to the lowest responsive and responsible bidder based on demonstrated ability, experience, capacity, equipment, resources, and satisfactory performance record. Bidders must submit a Bid Bond of not less than ten percent (10%) of the aggregate bid amount for bids exceeding $25,000, and the selected contractor must furnish Performance and Payment Surety Bonds equal to 100% of the Contract Sum within ten (10) business days of award. Contractors must be registered with the California Department of Industrial Relations (DIR) to perform public work and must comply with prevailing wage requirements under California Labor Code Sections 1720 et seq., though no specific contractor license type is mandated. The contract sum must include all labor, materials, equipment, prevailing wage costs, bonds, insurance, taxes, and overhead necessary for complete project delivery. The City will be responsible for de-energizing, disconnecting, isolating, and grounding the transformer prior to work commencement and disposing of any transformer oil not intended for reuse. The contract is governed by California law with venue in Santa Clara County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Adobe_Creek_Transformer-21;_15_MVA_LTC_Replacement_&_Radiator_Flange_Repair_Regasket_(Addendum_#1_Revision).pdf | ||
| Adobe_Creek_XF_21-5.jpg | JPG image | |
| Adobe_Creek_XF_21-4.jpg | JPG image | |
| Adobe_Creek_XF_21-3.jpg | JPG image | |
| Adobe_Creek_XF_21-2.jpg | JPG image | |
| Adobe_Creek_XF_21-1.jpg | JPG image | |
| 31_63-306-932-405.pdf | ||
| Adobe_Creek_Transformer-21;_15_MVA_LTC_Replacement_&_Radiator_Flange_Repair_Regasket.pdf | ||
| Performance_Bond.docx | DOCX document | |
| Bid_Bond_Form.docx | DOCX document | |
| Payment_Bond.docx | DOCX document | |
| Specifications_For_The_Repair_of_Substation_Transformer_AC_21_(2).pdf | ||
| Construction_Contract,_General_Conditions,_and_Change_Orders.pdf | ||
| Specifications_For_The_Repair_of_Substation_Transformer_AC_21.pdf | ||
| Bid_Form_For_AC_21_LTC_Repair.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .