SOW Gymnasium Audio System_BLDG 143.pdf

PDF 208 KB Posted

Attached to
USCG YARD AUDIO SYSTEM REPLACEMENT Federal contract opportunity
Solicitation number
31800QU260041642
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a Statement of Work (SOW) for an audio system upgrade project at the U.S. Coast Guard Yard Gymnasium (Building 144) in Baltimore, Maryland. The project involves the complete removal of an obsolete public address system and installation of a modern commercial-grade audio system to support voice announcements, music playback, athletic events, ceremonies, and special events at the Columbus Recreation Center.

The contractor must furnish and install four JBL 15"-2 Way full-range loudspeakers, one Origin Acoustics four-channel 750-watt amplifier, one Shure dual-channel wireless vocal microphone system with two handheld microphones, one JBL Professional CSM-28 commercial audio mixer, one LFI USA Zen Air Bluetooth receiver, and one eight-outlet 400 Series Watt Box power conditioner. The SOW specifies "Brand Name or Equal" for equipment, requiring contractor submission of manufacturer specifications for any proposed equivalents. Installation work includes removal of existing equipment, replacement of approximately 700 feet of 14/2 speaker wiring, system programming and configuration, complete operational testing with government witness, and one hour of onsite operator training. The contractor must conduct a mandatory site visit prior to proposal submission to verify installation conditions, existing equipment locations, wiring pathways, electrical power availability, and other field conditions. Deliverables include the complete operational audio system, equipment manuals, warranty documentation, as-built wiring diagram, equipment inventory, operational test report, and training completion documentation. The contractor must provide a minimum one-year warranty on workmanship and installation, with manufacturer warranties transferred to the government. Final acceptance occurs after government inspection verifies installation completion, proper equipment operation, successful testing completion, training delivery, and required documentation submission. The work will be performed at the U.S. Coast Guard Yard Curtis Bay, 2401 Hawkins Point Road, Baltimore, Maryland 21226, during normal facility hours (Monday-Friday 0500-2100, Saturday-Sunday 0700-1700). The Contracting Officer's Representative is Corinne J. Jacobson.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 31800PR260041642

STATEMENT OF WORK

LAST UPDATED: 07/10/2026 PAGE 1/8

STATEMENT OF WORK (SOW)

Audio System Upgrade

Coast Guard Yard Gymnasium

Building 144 Coast Guard Yard Baltimore, Maryland

1.0 GENERAL

1.1 BACKGROUND

The U.S. Coast Guard Yard Morale, Welfare, and Recreation (MWR) Program operates the Columbus

Recreation Center, which hosts official command functions, athletic events, training, ceremonies, recreational activities, and community programs.

The existing public address (PA) audio system has exceeded its useful service life and no longer provides reliable sound quality or adequate coverage throughout the gymnasium. The Government requires replacement of the existing equipment with a modern commercial-grade audio system capable of supporting voice announcements, music playback, athletic events, ceremonies, and special events.

1.2 SCOPE

The Contractor shall furnish and install a complete audio system including removal of obsolete equipment, installation of new equipment, replacement of wiring, testing, commissioning, and operator familiarization.

The Contractor shall perform all work necessary to provide a fully functional turnkey installation.

1.3 OBJECTIVE

Provide all labor, supervision, materials, equipment, tools, transportation, permits (if required), testing, programming, and incidental services necessary to remove the existing audio equipment and furnish and install a complete, fully operational commercial audio system at the Columbus Recreation Center.

The completed system shall provide:

• Uniform audio coverage throughout the gymnasium

• Improved speech intelligibility

• Bluetooth audio capability

• Wireless microphone capability

• Reliable commercial-grade operation

• Expandability for future system additions

2.0 REQUIREMENTS

2.1 Mandatory Site Visit

A site visit is mandatory prior to submitting a quotation.

LAST UPDATED: 07/10/2026 PAGE 2/8

The Contractor shall coordinate the visit with the Contracting Officer’s Representative (COR) to inspect existing equipment, verify installation conditions, and confirm all work requirements.

The site visit shall include verification of:

• Existing speaker locations

• Existing wall-mounted hardware

• Equipment rack accessibility

• Existing amplifier and mixer location

• Existing wiring pathways

• Ceiling heights

• Electrical power availability

• Scissor lift requirements

• Cable routing

• Existing conduit utilization

• Mounting conditions

• Future speaker expansion routing

• Any field conditions affecting installation

Failure to attend the mandatory site visit may render the quotation ineligible for award.

Site visits shall be scheduled during normal Government business hours.

2.2. Existing Equipment Removal

The Contractor shall remove existing speakers, amplifier, mixer, microphone system, obsolete wiring, and associated hardware as necessary to complete the installation.

Dispose of removed materials in accordance with applicable federal, state, and local regulations unless otherwise directed by the Contracting Officer

2.3 Furnish and Install New Equipment

The Contractor shall furnish and install equipment meeting or exceeding the following minimum specifications:

Speakers

• Four (4) JBL 15”-2 Way Full Range Loudspeakers

• Brand Name or Equal

Amplifier

LAST UPDATED: 07/10/2026 PAGE 3/8

• One (1) Origin Acoustics

• Four-Channel

• 750-Watt High-Power Amplifier

• Brand Name or Equal

Wireless Microphones

• One (1) Shure Dual Channel Wireless Vocal Microphone System

• Two handheld microphones

• Receiver

• Required accessories

Commercial Mixer

• One (1) JBL Professional CSM-28 8 input 2-Output Commercial Audio Mixer

• Brand Name or Equal

Bluetooth Receiver

• One (1) LFI USA Zen Air Bluetooth Receiver

Watt Box

• Eight Outlet

• 400 Series Power Conditioner

The Contractor shall provide all equipment required to install including a scissor lift if necessary. Any rental costs shall be included in the contract price

2.4 Speaker Wiring

Replace all existing speaker wiring.

Install approximately 700 feet of 14/2 white direct burial speaker cable or approved equal.

All wiring shall be concealed where practical, properly supported, terminated, labeled, and tested.

2.5 Equipment Rack

Reuse the existing equipment rack.

2.6 Programming and System Configuration

Configure the complete system including:

• Wireless microphones

LAST UPDATED: 07/10/2026 PAGE 4/8

• Bluetooth receiver

• Mixer

• Amplifier

• Speaker balancing

• Equalization

• Gain structure

• Operational testing

2.7 Testing and Commissioning

The Contractor shall perform complete operational testing including:

• Speaker testing

• Microphone testing

• Bluetooth functionality

• Amplifier testing

• Mixer operation

• System balancing

• Audio quality verification

The Government shall witness final testing prior to acceptance.

2.8 Operator Training

Provide one hour of onsite training covering:

• System operation

• Wireless microphones

• Bluetooth operation

• Mixer controls

• Power conditioner

• Basic troubleshooting

2.9 Brand Name or Equal

Equipment identified in this Statement of Work establishes the Government's minimum requirements.

Equivalent products may be proposed provided they meet or exceed the specified performance, functionality, durability, compatibility, and commercial quality requirements.

LAST UPDATED: 07/10/2026 PAGE 5/8

The Contractor shall submit manufacturer specifications for any proposed equivalent products.

2.10 QUALITY ASSURANCE

The Government reserves the right to inspect all work performed.

The COR shall review maintenance reports and may conduct random inspections to verify compliance with contract requirements.

Unsatisfactory work shall be corrected by the contractor at no additional cost to the Government.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

3.2 PROJECT MANAGER

The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting

Officer and the COR. The name of the Project Manager and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager must be provided to the Government. The

Project Manager is further designated as Key by the Government.

3.3 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures

(e.g., fire, safety, sanitation, environmental protection, security, off limits areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees always present a professional appearance and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract.

The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Coordinate with the CSO Office and DHS Instruction Handbook 121-01-007, Department of Homeland

Security Personnel Suitability and Security Program to check appropriate boxes.

Add any additional sections with “-or- “if appropriate and delete the others.

Security Risk and Background Investigation Form Requirements https://www.dhs.gov/sites/default/files/publications/InstructionHandbook121-01-007PersonnelSuitabilityandSecurityProgram.pdf https://www.dhs.gov/sites/default/files/publications/InstructionHandbook121-01-007PersonnelSuitabilityandSecurityProgram.pdf

LAST UPDATED: 07/10/2026 PAGE 6/8

The office requirements anticipate the following:

Check

Applicable

Box

Tier

Investigation

Risk Form

1 Low Risk, Non-Sensitive, Physical/Logical

Access (HSPD-12 Credentialing)

SF85

2 Moderate Risk, Public Trust SF85P

3 Non-Critical Sensitive, L, Confidential and

Secret Information

SF86

4 High Risk, Public Trust SF85P

5 Q, Top Secret, Compartmented Information, Critical Sensitive, Special Sensitive

SF86

Contractor access to unclassified, but Security Sensitive Information may be required under this SOW.

Contractor employees must safeguard this information against unauthorized disclosure or dissemination.

4.2 PLACE OF PERFORMANCE

The primary place of performance will be the United States Coast Guard Yard, Curtis Bay, 2401 Hawkins

Point Rd, Baltimore, MD 21226.

4.4 HOURS OF OPERATION

Normal facility operating hours are:

* Monday through Friday: 0500 – 2100

* Saturday and Sunday: 0700 – 1700

* Federal Holidays: As directed by the COR

5.0 GOVERNMENT FURNISHED RESOURCES

The Government shall provide:

• Access to facilities

• Equipment inventory, if available

• Point of contact for scheduling

• Escort requirements, if applicable

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW 2.0 and

SOW 2.9.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

LAST UPDATED: 07/10/2026 PAGE 7/8

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

8.0 DELIVERABLES

The Contractor shall provide:

• Complete operational audio system

• Equipment manuals

• Warranty documentation

• As-built wiring diagram

• Equipment inventory

• Operational test report

• Training completion

• Clean work area upon completion

9. Warranty

Provide a minimum one-year warranty on workmanship and installation.

Manufacturer warranties shall be transferred to the Government.

10. ACCEPTANCE

Final acceptance shall occur after Government inspection verifies:

• Installation is complete.

• All equipment operates properly.

• All testing has been successfully completed.

• Training has been provided.

• Required documentation has been delivered.

11. CONTRACTING OFFICER'S REPRESENTATIVE (COR)

Corinne J. Jacobson

Email: Corinne.J.Jacobson@uscg.mil

The COR is responsible for technical oversight and inspection of the work but is not authorized to modify the contract.