316552_CIVIL_DWG.pdf

PDF 3 MB Posted

Attached to
Upgrade Cherry Blossom Park, Camp Casey (MATOC Only)
Solicitation number
W90VN824R0055
Issued by

About this file

This document is a set of drawings and design specifications for the Upgrade Cherry Blossom Park project at Camp Casey. The project includes construction of two pavilions with movable wooden tables, 2.0M wide "footnote" pavement, two concrete pads for BBQ grills, installation of two trash cans, relocation of two stone statues, and restoration of solid sodding.

The solicitation is available only to Area I & II MATOC contractors. Key details include constructing two pavilions with four movable tables, 2.0M "footnote" pavement, two 1.0M x 1.5M concrete pads for BBQ grills, installing two trash cans, and relocating two stone statues. The project is for the Department of the Army Materiel Command Army Contracting Command. Refer to the specifications for additional details.

View the file

Other files

File Type Posted
ELEC_316552_DWG.pdf PDF
W90VN824R0055.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXIST/NEW EXTERIOR ELECTRICAL DISTRIBUTION PLAN

ELECTRICAL LOCATION MAP

LEGEND, GENERAL NOTES AND SCOPE OF WORKS

CAMP CASEY

1 T - 1 1 OF 1 TITLE SHEET

CIVIL

T-1

TITLE SHEET

A

B C D

E F G H

SCHEDULE OF DRAWINGS

RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS

SYMBOL BY

DESIGNED BY

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENERGY MANAGER

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ENVIRONMENT

FORCE PROTECTION

CHOE, S M.

AS SHOWN

MISC. DETAILS

FOOTNOTE PAVEMENT

PAVILION DETAILS

SITE LAYOUT PLAN AND SCOPE OF WORK

LOCATION PLAN AND GENERAL NOTES

C - 5

C - 4

C - 3

C - 2

C - 1

UPGRADE CHERRY BLOSSOM PARK

CAMP CASEY

FEWR NO. 316552

UPGRADE CHERRY BLOSSOM PARK

316552

E - 3

E - 2

E - 1

ELECTRICAL

- 1 100 0 100 200 300M

SCALE IN METERS

SCALE = 1 : 3,000

THIS PROJECT

N

CAMP CASEY

CIVIL

C-1

GENERAL NOTES :

SUBMISSION OF CONTRACT PROPOSAL.

DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO

1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND

PRIOR TO COMMENCING WORK ON THE PROJECT.

INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR

UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS

2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY

EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.

DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S

TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION

TO THE PROJECT CONTRACT.

TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST

FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED

OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"

DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT

6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL

LOCATION PLAN

ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.

UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER

CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS

5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND

ADDITIONAL COST.

EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO

CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE

FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO

7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY

CHOE, S M.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

AS SHOWN

12 CM

ST

ST

S T

P V C

.5

.9

W A

L L

GAL

6 PVC

ST

12 CM

GRAVES

GRAVES

COVERED WITH TOP SOIL AND SOLID SODDED.

4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE

REPRESENTATIVE.

A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S

MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN

ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS

8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT

65-A

STREAM

227.5

J-4

ST

36 CM

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

MATCH LINE 'C'

00-49341

3-48PN

00-49341

4-200PN

00-49341

4-200PN

01-49550

00-49341

LAUNDRY

KSC

PEST

647667

UTIL

B&G

WH-1

WH-2

DPW HQ

A

B

629 685

651A

833T

808 811

746 715 726

A B

00-49341

A

B

1149 1151

10291144

A

B

1918 1879

A

B

A

B

A

B

2372A

2373T

A C

2451 2400

A

B

A

B

2648 2605

2609T

2514 2540

8008T

2540T

26462645

1991 1963

A B

18331832

1962 1812

456A

CCTT

CCTT

SIMNET

463Z

SSSC

TSAK MILES 2000

549 546

8114T

560G

A B

86M

48T

A

B

39 55

134 133

186 192

202A

208 215 214

213 212

259 245

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR 1821

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

RAILHEAD

.8

.5

S T

R C

T

M

S T

268.6

STREAM

DISCHARGE TO

65-A

MATCH LINE 'C'

447A

F

F

497A

497B

458Z

2372?

QA00894-0J

QA00893-0J

QA00892-0J

ADMIN

EXER W/LAT

EXER W/LAT

QA00138-9J

QA01300-8J

00-54151 BUP 020122

00-54152 BUP 020122

00-54132 BUP 010801

00-54127 BUP 040430

00-54158 BUP 030104

00-54129 BUP 011109

00-54157 BUP AFTER 2026

00-54156 BUP 031030

00-54130 BUP 020330

00-54131 BUP 020929

00-54155 BUP 030506

03-57200 REPAIR 041007

99-47353

4-200PN

01-QA00604 BUP

XX-QA00606 BUP 0310XX

95-44142

4-184PN

95-44066

4-184PN

96-QA00466 BUP

95-44066

4-184PN

95-44066

4-184PN

95-44066

4-184PN

01-55893 BUP

99-QA00603 BUP

XX-QA00602 BUP 0310XX

99-47353

4-200PN

96-43269

4-184PN

97-44592

4-200PN

XX-QA00287 BUP

01-55894 BUP

99-51682

4-200PN

99-51820

3-48PN

97-44592

4-200PN

99-51682

4-200PN

99-51682

4-200PN

01-55882 BUP

A

B

A B

2022(?)

VEH BR

VEH BR

472?

455?

1839T

1840T

BARRIER

1564 1566

635A

2002B

A B

48A

A

B

A B

A B

A

B

A

B

A

B

174 Z

B A

S K

E T

B A

L

O

U R

T

T E

N N I

U R

T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

LOCATION PLAN AND GENERAL NOTES

UPGRADE CHERRY BLOSSOM PARK

316552

CIVIL

AS SHOWN

CHOE, S M.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SITE LAYOUT PLAN SITE LAYOUT PLAN AND SCOPE OF WORK

CAMP CASEY

SCALE: 1 / 250

1:250

0 20M15105

D100

D100

CB

D100

D100

D100

D100

D100

D150

D150

S-3021

TR

S-3025

T-3012

D250

LP

LP

CP

CP

CP

SP

LP

CP

LP

LP

LP

LP

LP

LP

C B

CONTROL PANEL

STAND

STAND

SCOREBOARD

ELECTRONIC

A/G

600GAL

OIL TANK

LP

CP

S P E E

D B

U M

P

CP

W

PEDESTRIAN GATE

10EA-PICNIC TABLE

DOUBLE SWING GATE

CP

D250

D250

S P E E D B

U M P

D250

D250

D250

D250

D250

D250

S

CL

CL

CL

JL

JL

JL

JL

JL

HD

HD

HDHD

HD

GU

GU

GU

WON1

WON5

WON10

WON6

K

K

HD

HD

HD

HD

E

FS

FS

FS

FS

FS

FS

FS

HS

HS

L

OIL

OIL

OIL

CL

CL

CL

JAE

C

C

C

JL

JAE

AN

AN

AN

AN

C

C

C

CL

CL

CL

CL

CL

AN

AN

AN

AN

A

A

A

FFE 62.944

A

G

G A

L

O

IL

T

A N

K

CP

LP

STAND

STAND

I

I I

CUTTING LINE

NM

JL

JL

AN

AN

AN

SO

NM

NM

JL

JL

JL

JL

JL

X

X

CUT

CUT

CUT

BD

JK

D100

S

LP

NM

D150

D200

D400

ROADING ZONE

C B

CB

D

TMH

TOP 63.303

EMH

61.84

62.07

61.58

61.94

61.380

62.06

62.03

62.04

61.73

61.94

61.85

61.79

61.79

61.84

62.13

62.31

62.23

62.20

62.17

62.33

62.18

62.11

62.31

62.12

61.72

63.18

64.04

62.104

62.227

62.272

62.332

62.363 62.394

62.401 62.437

62.417

S

S

SAND

S

S

LP

D

D

1~3

SCOPE OF WORK

SCHEDULE #1 (CONSTRUCT/ALTERATION)

DURING THE CONSTRUCTION.

6. RESTORE ALL DAMAGED SOLID SODDING

C-2

1FOR BBQ GRILL

CONSTRUCT TWO(2) CON'C PAD(1.0 X 1.5M)

INSTALL TWO(2) TRASH CAN

FOR BBQ GRILL.

3. CONSTRUCT TWO(2) CON'C PAD(1.0 X 1.5M)

4. INSTALL TWO(2) TRASH CAN.

1~9

N

APPROX. 365.0 SM

CONSTRUCT 2.0M W "FOOTNOTE" PAVEMENT,

2. CONSTRUCT 2.0M W "FOOTNOTE" PAVEMENT.

TURF AREA

TURF AREA

TURF AREA

2.00

.0

8.00

.0

FOUR(4) MOVABLE WOODEN TABLES

CONSTRUCT TWO(2) PAVILIONS W/

MOVABLE WOODEN TABLES.

1. CONSTRUCT TWO(2) PAVILIONS W/ FOUR(4)

FROM BRIDGE S-89

RELOCATE TWO(2) STONE STATUE

BRIDGE S-89.

5. RELOCATE TWO(2) STONE STATUE FROM

LINE OF ROOF ABOVE

600600

600600

SCALE : 1/50

SCALE : 1/50

600600

SCALE : 1/50

DOUGLAS FIR WOOD

TENSION STRUT

100x180 STAINED

DOUGLAS FIR WOOD

RAFTER

100x180 STAINED

STAINED DOUGLAS FIR

WOOD FASCIA

40x180

SHEATHING

DIRECTION OF

40x140 FLAT

40 40

600600

100100

CLAY ROOF TILE

GRANITE

1/50SCALE ; 1/50 SCALE ;

GRANITE

CEMENT MORTAR FILL

STAINED DOUGLAS FIR

200x200

WOOD COLUMN

WD SHEATHING

DOUGLAS FIR WOOD

FASCIA

40x180 STAINED

40x180 FLAT SHEATHING

CLAY ROOF TILE

2-PLY ASPHALT FELT

UNDERLAYMENT

W/150X150-4.0 DIAx4.0 DIA WWF

OVER 450 THK NFSM

M I

N

ROOF SLOPE

40 PER 100 40 PER 100

ROOF SLOPE

R O

F

O P

E

E

R O

F

O P

E

E

WOOD COLUMN

STAINED DOUGLAS FIR

200x200

CLAY ROOF TILE

100x180 STAINED

DOUGLAS FIR WOOD

RAFTER

STAINED DOUGLAS FIR

WOOD COLUMN

200x200

SCALE :

200x200 STAINED

(PRESSURE TREATED)

1/10

BOLT M16

PL 6

TENSION TIE

100x180

RAFTER

100x180

STAINED WOOD

RAFTER

40x180 FLAT SHEATHING

100x180

STAINED WOOD

@ SUPPORTS

"A"

W/3-10d EA BOARD

"A"

1/10SCALE :

RAFTER

L C

6.5

6.5

2.3 THK P

PIECE 250 DIA

L9 THK FLAG P

SLOPE TOP

2 V : 12 H

9 THK STIFFENER

STAINED WOOD

100x180

3.0

3.0

250 LONG

SCHED 80 PIPE

SUPPORT SHEATHING

L TO

"B""B"

6.5

6.5

9 THK

STIFFENER

PIECE 250 DIA

SCHED 80 PIPE

250 LONG

100x180 WITH

SLOT FOR 9 THK

FLAG PLATE

6.5

6.5

150 50

RAFTER

100x180

STAINED WOOD

100x180

TENSION TIE

BOLT M16

PL 6

SCALE : 1/10

WOOD POST

40x180

WOOD

M16

BOLT 1

M I

N

SCALE :

1/10

200x200

450 THK

NFSM

STAINED WOOD

COLUMN

100 THK CONCRETE SLAB

W/150X150-4.0 DIAx4.0 DIA WWF

- 6

- 6

- 6

SHADE SHELTER PLAN ROOF PLAN ROOF FRAMING PLAN

E L E V A T I O N CROSS SECTION

PLAN VIEW "A"-"A"S E C T I O N

SECTION

S E C T I O N

PLAN VIEW "B"-"B"

S E C T I O N

100x180 STAINED

DOUGLAS FIR WOOD

RAFTER

200x145 STAINED

(PRESSURE TREATED)

WOOD POST

STAINED DOUGLAS FIR

WOOD FASCIA

40x180

C

STEEL PLATE CAP

200X200MMX6mmTHK

STEEL PLATE SUPPORT

100X100X6mmTHK

BASE PLATE

9mm THK STEEL

D16@250 O.C

D13@300 O.C

STIRRUP

ANCHOR BOLTS

X 300 mm LG.

4ea-18mm Dia

G.L

CIVIL

AS SHOWN

CHOE, S M.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CAMP CASEY

3 3 3

3 3

3 C-3

PAVILION DETAILS

150 THK CONCRETE SLAB

SLOPE SLOPE

AS SHOWN

SCALE: NONE

CIVIL

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CAMP CASEY

CHOE, S M.

SUBGRADE

COMPACT

FOOT NOTES (T54)

SCALE: NONE

SCALE: NONE

VAR. VAR.

FOOTNOTE PAVEMENT PATTERN SAMPLE

FOOTNOTE PAVEMENT SECTIONFOOTNOTE PAVEMENT PATTERN PLAN

SAMPLE PHOTO

FOOTNOTE PAVEMENT

OR APPROVED EQUAL.

www.inoblock.co.kr (031-358-4711)

INOBLOCK CO., LTD.

THE INFORMATION OF FOOTNOTE IS BELOW

* NOTE:

4 4

C-4

SOD

CIVIL

AS SHOWN

CHOE, S M.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

CAMP CASEY

FIN GRADE

SCALE: NONE

#8-150X150 WWF

CON'C

CON'C PAD FOR BBQ GRILL

SCALE: NONE

MISC. DETAILS

C-5

BASE COURSE

BLANKET

SOLID SOD

50 THK MIN

TOP SOIL

300 THK MIN

COMPACTED SUBGRADE

SCARIFIED AND

SCALE: NONE

SOLID SODDING

TRASH CAN

1
2
3
4
5
6

File details come from the government source that posted it. Updated .