This document appears to be a set of attachments related to a federal contract opportunity to repaint the exterior of various buildings at Camp Casey. The attachments include a Scope of Work, Color Schedule, Building Schedule, Building Pictures, and Location Map.

The Scope of Work details the contractor's responsibilities, which include cleaning all surfaces to be painted, repairing minor damages, and applying lead-free and asbestos-free paints and coatings. The Building Schedule lists the various buildings and their specifications, such as dimensions, year built, number of floors, and total square footage. The Building Pictures provide visual references for the facilities that require repainting. The Color Schedule outlines the approved colors and finishes for the project. The Location Map shows the geographical layout of the facilities within Camp Casey.

This contract opportunity is a Request for Proposal (RFP) issued to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) Contractors under Solicitation Number W90VN824R0045.

View the file

Other files

File Type Posted
Signed Amendment.pdf PDF
Solicitation W90VN824R0045.pdf PDF
314791_CIVIL_DWG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

5.

6.

SCOPE OF WORK

FOR THE PAINTING WORK.

CLEAN ALL SURFACES TO BE PAINTED, AND REPAIR ALL MINOR DAMAGES

A-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

LAUNDRY

KSC

PEST

647667

WH-1

WH-2

DPW HQ

A

B

651A

851 860

833T

808 811

715 726

A B

A

B

778 794

1149 1151

A

B

A

B

A

B

A

B

2372A

2373T

A

C

A

B

A

B

2609T

2514 2540

8008T

2540T

1991 1963

A B

497486

456A

463Z

549 546

8114T

1752 1758

560G

A

B

86M

48T

A

B

39 55

134 133

202A

258252

1785 235

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

447A

F

F

497A

497B

458Z

A

B

A B

VEH BR

VEH BR

472?

455?

BARRIER

635A

2002B

A B

48A

A

B

A B

A

B

A

B

A

B

A

B

B A

S K

E T

B A

L L

C O

U R

T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

BARRIER

F

LA

G

F O O T B A

LL

F

IE

LD

(S Y N T H E T

IC

U R F

A R E A

1919LIFT STATION

VEH BR

BARRIER

B

UTILITY

BLDG

65-A

12 CM

ST

STREAM

S T

S

P

V C

227.5

J-4

ST

36 CM

.5

.9

W A

L L

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

GAL275

.8

.5

S T

R C

6 PVC

ST

C M

S T

268.6

STREAM

DISCHARGE TO

65-A

12 CM

ST

STREAM

GRAVES

GRAVES

O.S.

O.S.

PARKING

TT

GATE 2

GATE 1

#2299

FIRE STATION

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

DOOR & FRAME

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

: BUILDING LOCATION

WALL SAND-STONE 23617 TM 5-807-7PROTECTED METAL

COLOR SCHEDULE

SCALE: N/A

LOCATION MAP, CP CASEY

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

GENERAL NOTES

FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD FREE.

A CERTIFICATE OR MATERIAL SAFETY DATA SHEET (MSDS), WRITTEN IN ENGLISH,

SOLIDS) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR SHALL PROVIDE

COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE

THE CONTRACTOR IS REQUIRED TO USE "LEAD FREE" COATINGS (LIQUID PAINTS OR

DOCUMENTATION TO 8 CES/CEAN.

THE CONTRACTOR SHALL PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL

ACCORDANCE WITH THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS).

PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN

AREA WILL NEED TO BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED

WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK

ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CEASE

IS NOT PRESENT IN THE AREAS AFFECTED BY THIS WORK: HOWEVER, IF SUSPECTED

VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS

WILL PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER

PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR

THE CONTRACTOR IS SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN 0.1

8.

PROTECTION DURING CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE TO MEET THE SAFETY CODE OF FALL

9.

DIVISION THRU COR WITH INVENTORY AT FIELD BY CONSTRUCTION INSPECTOR.

SPECIFICATION AND CONTRACTOR SHALL SUBMIT MATERIAL APPROVAL TO ENGINEERING

ALL PAINT SHOULD MEET MPI (MASTER PAINTERS INSTITUTE) AS O&MA STANDARD

S e a r c h r e a

S e a r c h e a

G u a d

H o u s e

4.

MOLD / MILDEW.

FROM RUST, DUST, OILS, GREASE, DIRT, BUSHES, CRACKS, DAMAGES AND

ALL SURFACES TO BE PAINTED AND WATERPROOF COATING SHALL BE FREE

AND COLOR SCHEDULE

GENERAL NOTES, SCOPE OF WORK

LOCATION MAP, CP CASEY

ARCHITECTURAL

SCHEDULE AND PICTURES.

CLEAN DAYLIGHTING SYSTEM OF BUILDINGS AS SHOWN ON BUILDING

& SPECIFICATION BUILDING SCHEDULE.

ALL ROOFS INCLUDING PRIMER AS PER MANUFACTURE'S RECOMMENDATION

APPLY FLUID-APPLIED WATERPROOF FINISH COATING ONLY ON EXISTING

ON BUILDING SCHEDULE AND PICTURES.

LINK FENCE FOR NATURAL GAS GYSTEM AROUND BUILDING AS SHOWN

PAINT ON EXISTING HAND RAIL, GUARD RAIL, GUARD POST AND CHAIN

PICTURES.

AND WINDOW SECURITY BARS AS SHOWN ON BUILDING SCHEDULE AND

DOWNSPOUT, FASCIA, SOFFIT, EXTERIOR STAIRWAY, EXTERIOR COLUMN, BEAM,

URETHANE ROOF, CANOPY, EXTERIOR DOORS WITH FRAME, RAIN GUTTER,

PAINT ON EXISTING EXTERIOR WALL OF BUILDINGS WITH PRIMER INCLUDING

PED BR

AND PICTURES.

AND GUARD BOOTH AROUND BUILDING AS SHOWN ON BUILDING SCHEDULE

PAINT ON EXISTING SUB FACILITIES INCLUDING BICYCLE RACK, TRASH BIN

USAG YONGSAN-CASEY, KOREA

REPAINT EXTERIOR OF VARIOUS FACILITIES ,CP CASEY

PROJECT NO. 314791,

THIS PROJECT

REPAINT EXTERIOR OF VARIOUS FACILITIES

CP CASEY

KWON, CH

ARCHITECTURAL

314791

A-2

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

INSTALLATION BLDG NO UTILIZATION

DIMENSION

(FEET)

YEAR BUILT

NO. OF

FLOOR

SQ FT OF

TOTAL FLOOR

1 CAMP CASEY

2 CAMP CASEY

3 CAMP CASEY

4 CAMP CASEY

5 CAMP CASEY

6 CAMP CASEY

7 CAMP CASEY

8 CAMP CASEY

CAMP CASEY

CAMP CASEY

CAMP CASEY

CAMP CASEY

CAMP CASEY

NO SUB FACILITIES AND REMARKSEXTERIOR WALL FINISH

TRASH BIN

ROOF FINISH

METAL ROOF

00093

00456

00480

00488

00497

00794

01171

01758

02161

02285

02361

02528

02604

VEH MAINT SHOP

BATTLE SIMULATION CENTER

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

VEH MAINT SHOP

CO HQ BLDG/ENLISTED UPH

VEH MAINT SHOP

VEH MAINT SHOP

41X64, 71X17

138X82, 28X59.4, 22X8

65.4X88.8, 15.4X54.6

36X110

58X65.4, 2.8X17.4, 9.4X17.4

50X225, 24.9X50

65.4X98

50X60, 32X10

33x64, 11x14

41X64, 71X17

50.7x200.7x4story

41X64, 71X17

65x40, 16x77

DAYLIGHTING - 6EA

METAL ROOF, BUILT UP ROOF

CMU, METAL 3,831

12,419

6,628

3,960

3,997

12,488

6,402

3,320

2,395

3,831

40,028

3,831

3,831

CMU, METAL

CMU, METAL

DAYLIGHTING - 8EA

METAL ROOF, BUILT UP ROOF

E.I.F.S, METAL TRASH BIN

DAYLIGHTING-8EA

METAL ROOF

DAYLIGHTING - 6EA

METAL ROOF, BUILT UP ROOF

TRASH BIN, GUARD BOOTHCMU, METAL, EIFS

CMU, METAL TRASH BIN

CMU, METAL TRASH BIN

DAYLIGHTING - 10EA

METAL ROOF,

METAL

METAL

CMU, METAL

DAYLIGHTING - 6EA

METAL ROOF, BUILT UP ROOF

E.I.F.S., CONC METAL ROOF TRASH BIN, BICYCLE RACK

CMU, METAL

CMU, METAL METAL ROOF, BUILT UP ROOF

BUILDING SCHEDULE

1_BLDG S-93-1 1_BLDG S-93-2 1_BLDG S-93-3 2_BLDG S-456-1

2_BLDG S-456-3 3_BLDG S-480-1 3_BLDG S-480-2

2_BLDG S-456-2

BUILDING PICTURES-1

DAYLIGHTING - 6EA

METAL ROOF, BUILT UP ROOF

DAYLIGHTING - 8EA

METAL ROOF,

DAYLIGHTING - 12EA

METAL ROOF,

AND BUILDING PICTURES-1

BUILDING SCHEDULE

METAL ROOF

REPAINT EXTERIOR OF VARIOUS FACILITIES

CP CASEY

KWON, CH

A-3

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

6_BLDG S-794-1 6_BLDG S-794-2 6_BLDG S-794-3

BUILDING PICTURES-2

4_BLDG S-488-1 4_BLDG S-488-2 4_BLDG S-488-3 5_BLDG S-497-1 5_BLDG S-497-2

7_BLDG S-1171-1 7_BLDG S-1171-2

7_BLDG S-1171-3 8_BLDG S-1758-1 8_BLDG S-1758-2 9_BLDG S-2161-1 9_BLDG S-2161-2

10_BLDG S-2285-1 10_BLDG S-2285-2 11_BLDG S-2361-1 11_BLDG S-2361-2

BUILDING PICTURES-2

REPAINT EXTERIOR OF VARIOUS FACILITIES

CP CASEY

KWON, CH

A-4

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

BUILDING PICTURES-3

11_BLDG S-2361-3 11_BLDG S-2361-4 12_BLDG S-2528-1 12_BLDG S-2528-2 13_BLDG S-2604-1

BUILDING PICTURES-3

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

DOOR & FRAME

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

WALL SAND-STONE 23617 TM 5-807-7PROTECTED METAL

COLOR SCHEDULE

REPAINT EXTERIOR OF VARIOUS FACILITIES

CP CASEY

KWON, CH

File details come from the government source that posted it. Updated .