314629_DWG-ARCH.pdf

PDF 13 MB Posted

Attached to
Repair Roof and Exterior Paintings S-1064, Camp Casey(MATOC Only)
Solicitation number
W90VN824R0050
Issued by

About this file

This document is a Request for Proposal (RFP) for the repair of the roof and exterior painting of Building S-1064 at Camp Casey. It is issued to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) Contractors under Contract Numbers W91QVN-24-D-0001 through 0020, 0082, 0099, 0103, and 0107. The Department of the Army Materiel Command Army Contracting Command is the issuing agency. The RFP provides a detailed scope of work, including roof repair and exterior painting requirements. Pricing terms, set-aside information, and response/award dates are not included in the provided document. This RFP does not appear to contain a Performance Work Statement or Statement of Objectives.

View the file

Other files

File Type Posted
Amendment W90VN824R0050-0001.pdf PDF
Solicitation W90VN824R0050.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO.

A - 1

A - 2

A - 3

ARCHITECTURAL

DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

FEWR NO. 314629, CAMP CASEY

TITLE SHEET

LOCATION MAP, GENERAL NOTES, SCOPE OF WORK AND COLOR SCHEDULE

TITLE SHEET

BLDG. S-1064

REPAIR ROOF AND EXTERIOR PAINTINGS,

CP CASEYKIM, YK

314629

BLDG. S-1064

REPAIR ROOF AND EXTERIOR PAINTINGS,

BUILDING SCHEDULE, FLOOR PLANS AND ROOF PLAN

BUILDING CROSS SECTIONS AND BUILDING PICTURES

1.

2.

3.

4.

5.

SCOPE OF WORK

FOR THE PAINTING WORK.

CLEAN ALL SURFACES TO BE PAINTED, AND REPAIR ALL MINOR DAMAGES

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

LAUNDRY

KSC

PEST

647667

WH-1

WH-2

DPW HQ

A

B

651A

851 860

833T

808 811

715 726

A B

A

B

1149 1151

A

B

A

B

A

B

A

B

2372A

2373T

A

C

A

B

A

B

2609T

2514 2540

8008T

2540T

1991 1963

A B

456A

463Z

549 546

8114T

560G

A

B

86M

48T

A

B

39 55

134 133

202A

258252

1785 235

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR 1821

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

447A

F

F

497A

497B

458Z

A

B

A B

VEH BR

VEH BR

472?

455?

BARRIER

635A

2002B

A B

48A

A

B

A B

A

B

A

B

A

B

A

B

B A

S K

E T

B A

L

C O

U R

T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

BARRIER

FLAG

FO

O

TBALL

FIELD

(SYN

TH

ETIC

TU

R F

AR

EA)

1919LIFT STATION

VEH BR

BARRIER

B

UTILITY

BLDG

65-A

12 CM

ST

STREAM

S T

S T

P V C

227.5

J-4

ST

CM

.5

.9

W A

L L

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

GAL27

.8

.5

S T

R C

6 PVC

ST

T

C M

S T

268.6

STREAM

DISCHARGE TO

65-A

12 CM

ST

STREAM

GRAVES

GRAVES

O.S.

O.S.

PARKING

TT

GATE 2

GATE 1

#2299

FIRE STATION

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

TM 5-807-7

: BUILDING LOCATION

WALL SAND-STONE 23617 TM 5-807-7PROTECTED METAL

COLOR SCHEDULE

SCALE: N/A

LOCATION MAP, CP CASEY

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

GENERAL NOTES

FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD FREE.

A CERTIFICATE OR MATERIAL SAFETY DATA SHEET (MSDS), WRITTEN IN ENGLISH,

SOLIDS) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR SHALL PROVIDE

COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE

THE CONTRACTOR IS REQUIRED TO USE "LEAD FREE" COATINGS (LIQUID PAINTS OR

DOCUMENTATION TO 8 CES/CEAN.

THE CONTRACTOR SHALL PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL

ACCORDANCE WITH THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS).

PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN

AREA WILL NEED TO BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED

WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK

ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CEASE

IS NOT PRESENT IN THE AREAS AFFECTED BY THIS WORK: HOWEVER, IF SUSPECTED

VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS

WILL PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER

PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR

THE CONTRACTOR IS SHALL USE "ASBESTOS FREE" MATERIALS (LESS THAN 0.1

8.

PROTECTION DURING CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE TO MEET THE SAFETY CODE OF FALL

DIVISION THRU COR WITH INVENTORY AT FIELD BY CONSTRUCTION INSPECTOR.

SPECIFICATION AND CONTRACTOR SHALL SUBMIT MATERIAL APPROVAL TO ENGINEERING

ALL PAINT SHOULD MEET MPI (MASTER PAINTERS INSTITUTE) AS O&MA STANDARD

S e a r c h

A r e a

S e a r c h e a

G u a d

H o u s e

6.

MOLD / MILDEW.

FROM RUST, DUST, OILS, GREASE, DIRT, BUSHES, CRACKS, DAMAGES AND

ALL SURFACES TO BE PAINTED AND WATERPROOF COATING SHALL BE FREE

ARCHITECTURAL

CP CASEYKIM, YK

314629

AND PICTURES.

LINK SCREEN WALL AROUND BUILDING AS SHOWN ON BUILDING SCHEDULE

PAINT ON EXISTING HAND RAIL, GUARD RAIL, GUARD POST AND CHAIN

DOOR/FRAME

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE(COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

OF WORK AND COLOR SCHEDULE

LOCATION MAP, GENERAL NOTES, SCOPE

A-1

AS SHOWN ON BUILDING SCHEDULE AND PICTURES.

BEAM, GUARD RAILS, GUARD POST, SEARCH SHED AND GUARD BOOTH

DOWNSPOUT, FASCIA, SOFFIT, EXTERIOR STAIRWAY, EXTERIOR COLUMN,

URETHANE ROOF, CANOPY, EXTERIOR DOORS WITH FRAME, RAIN GUTTER,

PAINT ON EXISTING EXTERIOR WALL OF BUILDINGS WITH PRIMER INCLUDING

BLDG. S-1064

REPAIR ROOF AND EXTERIOR PAINTINGS,

USAG YONGSAN-CASEY, KOREA

BLDG. S-1064, CP CASEY

REPAIR ROOF AND EXTERIOR PAINTINGS,

PROJECT NO. 314629,

THIS PROJECT

AND BUILDING SCHEDULE.

ROOF SURFACES AS PER MANUFACTURE'S RECOMMENATION & SPECIFICATION

APPLY FLUID-APPLIED WATERPROOF COATING SYSTEM ON EXISTING METAL

SYSTEM OF BUILDINGS AS SHOWN ON BUILDING SCHEDULE AND PICTURES.

CLEAN BRICK WALL, STONE WALL, CONC SURFACES AND SKYLIGHTING

SCHEDULE AND PICTURES.

CONTAINER AND MECH ROOM AROUND BUILDING AS SHOWN ON BUILDING

FUEL TANK, FUEL TANK DIKE, FUEL TANK SCREEN, WALL PAVILION,

PAINT ON EXISTING SUB FACILITIES INCLUDING BICYCLE RACK, TRASH BIN,

A-2

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

CP CASEYKIM, YK

314629

BLDG. S-1064

REPAIR ROOF AND EXTERIOR PAINTINGS,

INSTALLATION BLDG NO UTILIZATION

DIMENSION

(FEET)

YEAR BUILT

NO. OF

FLOOR

SQ FT OF

TOTAL FLOOR

CAMP CASEY

NO SUB FACILITIES AND REMARKSEXTERIOR WALL FINISH

TRASH BIN

ROOF FINISH

VEH MAINT SHOP

BUILDING SCHEDULE

01064 38,340 2001METAL ROOF 481.3x64, 96x64, 21.7x9.8x2, 2

01064T 2010METAL ROOF1 96 TRASH BIN 12x8

SCALE: N/A

SCALE: N/A

SCALE: N/A

1ST FLOOR PLAN (S-1064) 2ND FLOOR PLAN (S-1064)

ROOF PLAN (S-1064)

AND ROOF PLAN

BUILDING SCHEDULE, FLOOR PLANS

A-3

A-3

CMU, EIFS AND METAL

* CLEAN SKY LIGHTING, APPROX. 38 EA.

CMU, EIFS AND METAL

A-3

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

CP CASEYKIM, YK

314629

BLDG. S-1064

REPAIR ROOF AND EXTERIOR PAINTINGS,

BUILDING PICTURES

SCALE: N/A

BUILDING CROSS SECTION

SCALE: N/A

BUILDING CROSS SECTION

BUILDING PICTURES

BUILDING CROSS SECTIONS AND

A R

E A

S U

R F

A C

E

IF

W

L L

A R

E A

W A

U

R F

A C

O T

E C

T

D

T

E A

S U

R F

A C

IF

W

L L

A R

E A

W A

U

R F

A C

O T

E C

T

D

T

PAINT ON METAL SURFACES

SURFACES

PAINT ON EIFS

STEEL POSTS

PAINT ON

PAINT ON METAL SURFACES

SURFACES

PAINT ON EIFS

CONTAINERS

PAINT ON

SCREEN WALL

CHAIN LINK

PAINT ON

CONTAINERS

PAINT ON

SURFACES

PAINT ON EIFS

METAL DOORS

PAINT ON

WATERPROOFING SYSTEM

ACRYLIC FLUID APPLEID

CONTAINERS

PAINT ON

SCREEN WALL

CHAIN LINK

PAINT ON

METAL CANOPY

PAINT ON

FACILITY

STORAGE BIN

PAINT ON

STEEL GUARD POSTS

PAINT ON

T-01
A-01
A-02
A-03

File details come from the government source that posted it. Updated .