3123599_QAIRQMT_REPORT.pdf
PDF 82 KB Posted
- Solicitation number
- FA812121R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3123598_RDL_REPORT.pdf | ||
| 3123593_UIIEC_REPORT.pdf | ||
| 3226762_CDRL1_REPORT.pdf | ||
| 3226966_ATTACH.pdf | ||
| 3226970_ATTACH.pdf | ||
| 3226958_ATTACH.pdf | ||
| 3123588_QUALRQMT.pdf | ||
| 3226957_ATTACH.pdf | ||
| 3245625_ATTACH.pdf | ||
| 3178713_WAGEDET.pdf | ||
| 3219086_JUSTAPPR.pdf | ||
| 3226969_ATTACH.pdf | ||
| 3226964_ATTACH.pdf | ||
| 3226961_ATTACH.pdf | ||
| 3242128_PWS.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
2840012769822NZ
3. POINT OF INSPECTION
SOURCE DESTINATION
X
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
SOURCE DESTINATION
X
5. ITEM MANAGER / PHONE
Franzoni, Jacob R / 405-734-5507
6. EQUIPMENT SPEC / PHONE
Carl, Berger / 405-734-8715
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
CERTIFICATE OF CONFORMANCE
FAR 52.246-15
CONTRACT RESPONSIBILITY
FOR INSPECTION
FAR 52.246-1
STANDARD INSPECTION
FAR 52.246-2,-3,-4,-5 OR -6
AS APPLICABLE TO CONTRACT
X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
ISO 9001:2000
COMMERCIAL ITEM INSPECTION
FAR 52.212-4
OTHER (Describe in Block 8)
8. REMARKS
Olsson, James DNAME: 10 NOV 2020DATE:
This is a Critical Safety Item (CSI) part.
Nguyen, Hanson VNAME: 22 SEP 2017DATE:
CSI:F
8a. OZONE DEPLETING SUBSTANCES (ODS)
X STATEMENT
"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN
ONLY BE MET BY THE USE OF A CLASS I ODS."
WAIVER (SEE AF FARS 5323)
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
9. QUALITY PRE-AWARD SURVEY
YES NEW SOURCE
X PREVIOUS SOURCEX NO
AFMC PARTICIPATION
RECOMMENDED
10. CODES
A. I&A
B. CQR
G
11. SIGNATURE OF TECHNICAL AUTHORITY
Olsson, James D
ORGANIZATION / SYMBOL
AFLCMC / LPEA2
PHONE
405-622-7829 / 892-7829
DATE
10 NOV 2020
Page 1 of 1AFMC FORM 807, 20060111, V1 Version 5Generated by PRPS using Jasper Reports on 27 May 2021
File details come from the government source that posted it. Updated .