This is a Statement of Work for the renovation of two restrooms located in Building 20 at US Coast Guard Base Los Angeles Long Beach. The contractor shall provide all labor, materials, and equipment to complete the project, which includes repairing and re-tiling the men's restroom wall, installing a 24"x36" plumbing access panel and a government-furnished urinal, and replacing floor tile with new 2'x1' ceramic tiles in both restrooms. The work requires temporary removal and reinstallation of toilets and partitions in both facilities, and the contractor must perform operational tests on all reinstalled fixtures witnessed by the Contracting Officer's Representative (COR). The project is located at 1001 South Seaside Avenue, San Pedro, California 90731, and the COR is LT Brandon C. Mckee, with Contracting Officer Ruijin Garcia (Ruijin.G.Garcia@uscg.mil).

All work must be scheduled to minimize facility disruption, with one restroom renovated at a time during hours of 7:00 AM to 4:00 PM, Monday through Friday. The contractor must submit personnel lists for security clearance five days prior to commencing work, provide 48 hours' advance notice of all deliveries, and notify the COR five business days in advance of start and completion dates. All products must comply with the Buy American Act, and the contractor is responsible for waste disposal in accordance with federal, state, and local regulations. Safety compliance with OSHA Standards (29 CFR Part 1926) and California Construction Safety Orders is mandatory. All bids must include a cost breakdown for labor and materials. Contractors must be registered in SAM.gov and have a DUNS number prior to award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

BASE LOS ANGELES LONG BEACH

1001 South Seaside Ave.

SAN PEDRO, CALIFORNIA 90731

Scope of Work

FOR

Renovate two restrooms located in Building 20

Dated: 06/04/2026

Base Los Angeles Long Beach
Initial
Date

TBD

Contracting Officer (KO)

Ruijin Garcia Ruijin.G.Garcia@uscg.mil Contracting Officers Representative (COR)

LT Brandon C. Mckee

BASE FACILITY ENGINEER

GENERAL REQUIREMENTS

PART 1 GENERAL

1.01 SCOPE OF WORK: Provide all labor, materials, and equipment necessary to renovate two galley restrooms located at building 20. The work includes, but is not limited to, the following:

1.02 Restroom 1 (Men’s restroom):

A. Repair opened wall and match existing wall tiles.

B. Supply and frame and install one 24”x36” access panel for plumbing maintenance.

C. Install one supplied urinal. Contractor shall provide all mounting and plumbing materials.

D. Remove one toilet and partitions, re-install after floor tile replacement.

E. Remove flooring and prepare floor.

F. Supply and install of new ceramic 2’x1’ tiles (see photo of sample below).

Restroom 2 (Women’s restroom):

G. Remove one toilet and partitions, re-install after floor tile replacement.

H. Remove flooring and prepare floor.

I. Supply and install of new ceramic 2’x1’ tiles (see photo of sample below).

J. Contractor must perform an operational test on all re-installed fixtures to be witnessed by COR before project closes out.

1.03 LOCATION: Project site is located at Building 20 at US Coast Guard Base Los Angeles Long Beach, 1001 South Seaside Avenue, San Pedro, CA 90731. Contracting Officer’s Representative (COR) for this project is Ruijin Garcia (Ruijin.g.garcia@uscg.mil)

1.04 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact: Ruijin Garcia via email to arrange site access. Vendors must have DUNS and be registered at System for Award Management (SAM.gov) prior to be awarded a government Purchase Order.

1.05 CONTRACTOR SECURITY REQUIREMENTS: For this Coast Guard facility, the Contractor shall provide a list of all on-site personnel on the provided access request form, including sub-contractors and suppliers, to the Contracting Officers Representative (COR) 5 days prior to commencing work for clearance (clearance can take up to 3 business days). The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.

Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security will require proof of the legal right to work in the United States. Contractor and delivery personnel will be subjected to an immigration status and outstanding criminal warrants check.

Contractors shall provide the COR with 48 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.

1.06 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify the COR 3 business days in advance of any shutdowns. Contractor is required to coordinate Lock Out/Tag Out Processes and Procedures with the COR. Perform all on-site work between the hours of 7:00 AM and 4:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the COR or the Facility Engineer (FE). Renovate one restroom at a time.

1.07 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the COR in writing (email) five (5) business days in advance of the date they intend to commence work, and five (5) business days prior to the date that work will be ready for final inspection. All notifications must be approved by the COR, in writing, prior to commencing or completing work.

1.08 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess, or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposals shall be done in accordance with federal, state, and local laws and regulations.

1.09 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4 Construction Safety Orders, and Army Corps of Engineers EM385-1-1. When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, ventilation, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. Return work site to original condition after completion of work by cleaning and removal of all construction material. An Accident Prevention/Safety Plan shall be submitted by the contractor prior to any commencement of work.

1.010 SUPPLIES AND SERVICES: All products must meet the requirements of the Buy American and Buy America Acts as amended in DFARS 225 and the FAR 25.103.

1.011 TEMPORARY FACILITIES:

A. STORAGE: The location for exterior stock piling or lay down area of materials will be available on base with location to be determined by COR and Facility Engineer depending on size. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area.

B. SANITARY FACILITIES: Toilet facilities are available for use located in Building 20.

C. WATER AND ELECTRICITY: Water and 120V electricity are available at no cost to the Contractor. Cost of these utility connections and disconnections shall be the responsibility of the Contractor. Personnel using extension cords to bring power from another location for construction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (GFCIs), even if connecting to building wiring. Use of portable generators and compressors is authorized at contractor expense to operate portable equipment.

1.012 All bids submitted shall include breakdown of cost for labor and materials.

Sample Tile.