30796PR250000012 STATEMENT OF WORK REV1.pdf

PDF 229 KB Posted

Attached to
Replace Flooring at USCG STA Channel Islands Harbor
Solicitation number
30796PR250000012
Issued by

About this file

This Statement of Work (SOW) details a flooring replacement project for the U.S. Coast Guard Station at Channel Islands Harbor in Oxnard, CA. The project requires removing existing floor coverings and installing approximately 9,302 square feet of Luxury Vinyl Plank (LVP) and 2,040 square feet of epoxy flooring across three buildings: the Main Station Building, Maintenance Shop, and South Building.

Specific tasks include replacing flooring in the two-story main station building, recoating 1,200 square feet of epoxy in the Maintenance Shop Garage, replacing 180 square feet of floating floor in the Maintenance Shop Office, recoating 840 square feet of epoxy in the South Building Garage, and replacing 450 square feet of floating floor in the South Building Office. Work must be completed between 7:00 AM and 5:00 PM, Monday through Friday, excluding federal holidays. The technical point of contact is Timothy Walach, and the contractor is responsible for providing all materials, cleaning up daily, and disposing of removed materials in compliance with environmental regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REPLACE FLOORING AT STATION CHANNEL ISLANDS HARBOR

PART 1 - GENERAL

The intent of this Statement of Work (SOW) is to have the contractor remove the existing flooring and replace flooring with either Luxury Vinyl Plank (LVP) or epoxy, including any required trim pieces. The contractor will provide all labor, materials, and equipment necessary to complete the installation in compliance with industry standards and applicable regulations.

PART 2 - SCOPE

The contractor shall remove existing floor coverings, prep the floors, and install approximately 9,302 sf of LVP and approximately 2,040 sf of epoxy flooring in the two-story Main Building, Maintenance Shop, and South Building.

Colors shall be chosen by the technical POC. .

PART 3 - FACILITY AND SECURITY REQUIRMENTS

1. Contractor vehicles must have valid registration and insurance, and vehicle operators must have a valid driver license. All personnel shall have valid photo identification.

2. The contractor shall clean up all areas to ensure they are clear of debris daily. At completion of the project all construction areas will be returned to their original condition. The contractor shall remove all waste material generated and dispose of in accordance with industry standards and applicable environmental rules and regulations.

3. Minimizing impact to Coast Guard operations. Work performed at Oxnard, CA shall be completed between the hours of 7:00AM and 5:00PM, Monday thru Friday (excluding Federal Holidays) unless authorized by the Contracting Officer.

PART 4 - GOVERNMENT FURNISHED MATERIAL

1. Contractor will provide all materials to complete the work necessary. The government will provide electricity, parking, and laydown area as available from the unit. Bathroom facilities will not be available for contractor personnel.

PART 5 - TECHNICAL POINT OF CONTACT DESIGNATION

1. Technical POC for this task is:

Timothy Walach Office: (805) 985-9822 E-mail: Timothy.J.Walach@uscg.mil

PART 6 – TASKS

1. Mobilization. Mobilize all necessary materials, equipment, and labor to the main station building, maintenance shop, and south building to complete the flooring replacement project.

2. Flooring Replacement in Main Station Building. Replace flooring in the two-story, 8,672 sf main station building with LVP flooring.

3. Epoxy Recoat and Flooring Replacement in Maintenance Shop.

3.1. Recoat 1,200 sf epoxy floor coating in the Maintenance Shop Garage.

3.2. Replace the 180 sf floating floor in the Maintenance Shop Office with LVP flooring.

4. Epoxy Recoat and Flooring Replacement in South Building.

4.1. Recoat 840 sf epoxy floor coating in the South Building Garage.

4.2. Replace the 450 sf floating floor in the South Building Office with LVP flooring.

5. Disposal. Dispose of all removed flooring and materials in accordance with industry standards and applicable environmental rules and regulations.

6. Demobilization. Remove all equipment, materials, and debris from government facilities and return areas to original condition.

PART 7 – ACCEPTANCE

1. Completion of work under this contract will be monitored and accepted by Coast Guard Technical POCs listed in

PART 4.

END

File details come from the government source that posted it. Updated .