This document is a Statement of Work (SOW) for a 2-Story Modular Office to be constructed at Joint Base McGuire-Dix-Lakehurst, New Jersey. The SOW outlines the scope of work, which includes the vendor supplying and assembling all materials to construct the modular building per specific requirements. Key details include a 45-calendar day delivery timeline for tools, equipment, and materials, followed by a 5-calendar day construction timeline. The building must have an 18' x 28' footprint, 10' tall floors with a 1' drop ceiling, 2-6" thick insulated walls with Class-A fire rating, electrical and data connections, HVAC systems, stairs with a landing, and vinyl flooring. The related federal contract opportunity is a Sources Sought notice, with responses due by July 31, 2024. The applicable NAICS code is 332311 with a small business size standard of 750 employees, and the Product Service Code is 5410. Businesses of all sizes are encouraged to respond, identifying their business size and socioeconomic status.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work 305 MXS 2-Story Modular Office
The scope of work is as follows in the Statement of Work. The vendor shall supply and assemble all material outlined below to construct a modular building. No alterations, additions or deletions shall be made to the contract unless prior approval is given in writing by the Contracting Officer (CO).
Upon award the vendor will begin delivery of required tooling, equipment, material to the hangar, building 2201, and ensure it is placed along the northwest wall. Vendor must coordinate with the technical point of contact (TPOC) to ensure that all members of vendors construction team are vetted through Security Forces to gain access on base and allowed within the restricted area for the duration of service. Vendor must also ensure delivery drivers are given TPOC’s contact info to ensure materials are delivered to correct location and stored properly. Vendor will have 45 calendar days to deliver all required tools, equipment and material. Once delivery is complete vendor will have 5 calendar days to complete the modular office construction. At the completion of construction, the construction team will need to transport all waste material from the build site to the base recycle center, approximately ½ mile away.
The building must be anchored next to the inner garage door in the northern corner of building 2201 outside of the yellow aircraft spacing lines and elevated 18” off the floor IAW UFC 3-101-01. It must have an 18’ x 28’ footprint and built with 2 floors. The walls need to be built 16” of the northwest wall and 5’ off the northeast wall. Each floor must be 10’ tall with a 1’ drop ceiling to provide space for LED lighting, electrical systems, fire suppression/detection systems and sound buffer insulation. The walls may be from 2 - 6” thick with a class-A fire rating, insulated and provide routing and connections for 8 (dual plug) electrical and 8 (dual plug) Cat6 data plugs sets on both floors (refer to drawings for location/placement of plugs). There must be a 125-amp circuit breaker box installed in the northeastern corner on the northeastern wall to support a 120v system IAW UFC 3-520-01.
The first floor requires 2 doors, one on the southwestern wall and one placed on the southeastern wall. Both doors will have a tempered glass windows and commercial door lever lock handles. The first floor will require 7 windows, 3 on the southwestern wall and 4 on the southeastern wall. The second floor will require 9 windows, 4 on the southwestern wall and 5 on the southeastern wall.
The door for the second floor will be on the southeastern wall in the southeastern corner. The second floor requires a staircase with a landing for the second-floor door. The staircase should extend directly away from the door and turn to the right halfway down, to keep this structure within the yellow aircraft clearance lines. The stairs will have standard spaced steps with a landing IAW UFC 1-200-01 Building Code. The internal and external walls should be vinyl covered and white in color. The ceilings should be white in color and the floor should finished in vinyl and gray in color.
The HVAC units will be cooling and heating systems, capable of supporting 500sq ft room IAW UFC 3-410-01, installed on each floor and must be wall mounted installed along the northeastern wall.
The drain tubes from both HVAC units needs to be routed to the southeastern corner of the structure and terminate 24” above the floor. The second floor requires stairs with a landing at the top.
Vendor must provide and install the following specifications for the building:
1. GENERAL REQUIREMENTS
a. Frame and Wall systems w/ Electrical raceways/channels
b. Door w/Glass & Lever Lock
c. Fixed Windows
d. Steel Roof Deck
e. Stairway w/Landing
f. Steel Base w/Subfloor & Vinyl Tile
2. DATA
a. Cat6 Data Jack (Dual Port)
3. ELECTRICAL
a. Dedicated Outlets
b. C.B Box
c. Light Switches
d. Light Fixtures
e. Receptacles
4. HVAC
a. Drain Kit for HVAC Units
b. HVAC System
5. Wall Panels
a. 3" Wall Panels - Foam Core, Class-A fire rating
6. Doors
a. Steel door w/Glass & Lever Lock
7. Windows
a. 1/4” Tempered Safety Glass
8. Roof
a. 22ga Steel Roof Deck
9. Mechanical
a. 2ea HVAC Wall Unit
b. 2ea. HVAC Drain Kit
c. Electrical systems
d. Internet/telecommunication systems
10. Stair and Landing
a. 1ea. Stairway with Landing & Handrail
11. Installation (All Performed by Factory Trained Installers)
a. 10' High Wall(s)
b. Door(s)
c. Window(s)
d. Roof Deck
e. Grid Ceiling & Tiles
f. Vinyl Flooring
g. Stairway w/ Landing
12. Miscellaneous
a. Round trip travel, lodging expenses, equipment rental, and all other incidental services shall be included in quoted price.
b. Transport of goods to worksite included in quoted price.
c. Final electrical hookup to power source to be performed by Base Civil Engineering/customer.
d. Internet connection to be installed by Base Communications Squadron/Customer.
e. Fire suppression system to be installed by alternate vendor/Customer.
f. The vendor will start Period of Performance within 45 calendar days after award of contract.
g. Refurbished items are not authorized for any item detailed in this SOW.
h. Escort coordination
i. Technical Point of Contact:
j. Vendor must ensure OSHA standards are followed throughout the construction phase of the period of performance.
Regulations and References:
UFC 1-200-01 Building Code
UFC 3-101-01 Architecture
UFC 3-190-06 Protective Coatings and Paints
UFC 3-410-01 HVAC
UFC 3-520-01 Electrical Systems
UFC 3-600-01 Fire Protection
UFC 4-211-01 Aircraft Maintenance Hangars
NFPA 70 National Electric Code
Marked Drawing Attached: See the project drawings attached to this SOW.
Desks, workstations and furniture shown in drawings are for reference only.