This is a Scope of Work (SOW) document for a carpet replacement project at United States Coast Guard Station Cortez in Bradenton, Florida, issued by the Department of Homeland Security.

The project involves the complete removal of carpet from the second deck of the Multipurpose Building and installation of Luxury Vinyl Plank (LVP) flooring across approximately 2,887 square feet. Specific deliverables include removal of all existing carpet in crew berthing, offices, and the Communication Watch stander room; inspection and documentation of floor conditions; subfloor preparation including grinding and removal of old glue (not to exceed $2.75 per square foot); installation of Lux Wood Cheyenne 7.25" x 48" LVP with 20 Mil wear layer and 5MM core with 1.55MM pad; installation of 4" coiled vinyl base; and removal and installation of new baseboards. The total estimated cost is approximately $60,000. The contractor must provide all labor, tools, equipment, and materials, including work area containment for dust and noise control, and must notify Station Cortez of electricity requirements at least two weeks prior to the project start date.

Work hours are 0800-1600 Monday through Friday, with prior approval required for work outside these hours. The contractor must comply with OSHA Safety and Health Standards, submit a written safety plan per FAR 52.236-13, ensure ADA accessibility and Florida Building Code compliance, and immediately cease work if lead-based paint or asbestos-containing materials are discovered. The contractor must designate a senior-level Project Manager as the single point of contact for the Contracting Officer and Contracting Officer's Representative (COR), who must be available for communication during business hours and respond to technical issues within two hours. All contractor and subcontractor personnel require company identification and government-issued ID numbers; vehicles must display valid state license plates. Final inspection includes functional testing of all doors and a walkthrough to verify quality of installation and that floors and moldings are free from blemish. Site visits are available Tuesdays and Thursdays between 0830 and 1330 with the Station's Engineering Petty Officer. The project is scheduled for September 2026 at USCG Station Cortez, 4530 124th Street Court West, Bradenton, FL 34209.

View the file

Other files

File Type Posted
SAM WDOL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND

SECURITY

UNITED STATES COAST GUARD

STATION CORTEZ, FL

SCOPE OF WORK

2nd Floor Carpet Replacement

September 2026 Station Cortez, Florida

PART 1 – GENERAL

1.1 BACKGROUND

The purpose of this project is to replace all carpet on the 2nd Deck of the Multipurpose Building with Luxury Vinyl Plank (LPV) flooring at US Coast Guard Station Cortez.

1.2 SCOPE OF WORK

This scope of work involves the removal of all carpet on the 2nd deck at United States Coast Guard Station Cortez. The scope includes the removal of all carpet, inspection of all flooring, preparation of floor for LPV, and installation of new baseboard.

The scope includes but is not limited to:

- Removal of all carpet throughout crew berthing, offices and Communication Watch stander room.

- Inspection and documentation of the floor condition.

- Preparation of the subfloor. To include grinding and removal of old glue not to exceed $2.75/sqft

- Installation of new LPV flooring IAW Facility regulations and manufacturers installation instructions and the use of adhesive that meets the specification to bond the LPV to the Subfloor.

- Removal and installation of new baseboards.

- Ensuring all repairs meet applicable building codes and DHS facility maintenance standards.

This SOW does not include upgrades to unrelated building systems, current LPV, or any bathroom flooring. Only carpeted areas are within the scope.

Contractors must follow all safety regulations, coordinate access with on-site personnel, and provide a final inspection report upon completion of the work.

1.3 OBJECTIVE

Objective of this service agreement is to increase habitability, cleanliness and provide an upgrade to the current old carpet.

PART 2 – REQUIREMENTS

2.1 SPECIFIC REQUIREMENTS/TASKS

The contractor shall provide all labor, tools, equipment, and materials necessary to perform the required tasks within this agreement. Provide containment of work area to control dust and noise pollution by providing temporary protections to adjacent spaces. Contractors are responsible for notifying Station Cortez of all electricity needed, if any, to complete the job at least 2 weeks prior to the project start date. Contractors are responsible for discarding all materials that are no longer operational, and all garbage associated with replacements.

2.2 INSTALLATION AND FINISHES

1. Supply Lux Wood Cheyenne 7.25 x 48" 20 Mil W / 5MM Core 1.55 MM Pad LVP 2,887sf

2. Supply 4" Coiled Vinyl Base

3. Installation: 2,887sf of Cheyenne LVP & Coiled Vinyl Base

4. Installation: 2,887sf of Cheyenne LVP & Coiled Vinyl Base

2.3 QUANTITY AND COSTS

The total removal and installation of 2887 sf of carpet tile/carpet is approximately $60,000 dollars

2.4 EXCLUSIONS

1. Differing site conditions and/or hidden conditions.

2. Permit fees and bonding.

3. Pricing assumes existing sub floors are in good condition.

2.5 SAFETY AND COMPLIANCE

1. Contractor shall comply with OSHA Safety and Health Standards (29 CFR Part 1926).

2. Submit written safety plan per FAR 52.236-13 assigning responsibility to superintendent.

3. Ensure all work meets ADA accessibility and Florida Building Code requirements.

4. If lead-based paint or asbestos-containing materials are identified during demolition or installation, all work shall immediately cease in the affected area.

The contractor shall notify the COR and arrange for proper testing and abatement in accordance with EPA and OSHA regulations (29 CFR 1926.62 and 1926.1101). Remediation must be completed by licensed personnel prior to resumption of construction activities.

PART 3 – CONDITIONS

3.1 WORK HOURS

Normal work hours are 0800 to 1600, Monday through Friday. Work outside these hours requires prior approval from the Station EPO. MKC Adam Muniz (MKC) (Adam.L.Muniz@USCG.MIL)

3.2 SITE CONDITIONS

1. Contractor shall verify site conditions prior to starting work.

2. Contractor responsible for repair of damages to existing structures/utilities.

3. Maintain clean site with daily removal of debris.

3.3 CONTRACTOR REQUIREMENTS

1. Contractor and subcontractor personnel shall wear company identification at all times.

2. Provide consolidated list of all personnel with government-issued ID numbers.

3. Comply with Coast Guard regulations including speed limits, smoking areas, and weapons prohibitions.

3.4 CONTINUITY OF OPERATIONS

1. Schedule work to minimize interference with normal operations.

2. Notify Coast Guard representative one week in advance of any planned outages

(power, water, sewage, lighting).

3. Coordinate all work with the Station EPO.

3.5 KEY PERSONNEL

Before replacing any individual designated as Key by the US Coast Guard, the Contractor must notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement via email, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes must possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor must not replace Key Contractor personnel without approval from the Contracting Officer. The following Contractor personnel are designated as Key for this requirement.

3.6 PROJECT MANAGER

The Contractor must provide a Project Manager (PM) who must be responsible for all Contractor work performed under this agreement. The PM must be a single point of contact for the Contracting Officer (KO) and COR. The PM should be one of the senior level employees provided by the Contractor for this work effort. The name of the PM, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager must be provided to the US Coast Guard as part of the Contractor’s proposal. The Project Manager is further designated as Key by the US Coast Guard. During any absences of the PM, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this agreement. The PM and all designated alternates must be able to read, write, speak, and understand English. Additionally, the Contractor must not replace the PM without prior approval from the KO.

3.6.1 COR / PM Communication

The PM must be available to the COR via telephone or email between the hours of 0800 and 1600 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within two hours of notification.

3.7 EMPLOYEE IDENTIFICATION –

Contractor employees working on-site at US Coast Guard Station Cortez must identify themselves as Contractors when their status is not readily apparent.

Contractor employees must be in possession of a valid, state-suited photo ID and organizational clothing identifying the Contractor company. If organizational clothing is unavailable, Contractor employees should wear something identifying them as a contractor employee.

3.7.1 VEHICLE IDENTIFICATION

A valid state license plate is required for all vehicles operating on government property. All vehicles operated on government property shall be maintained in a good state of repair. All vehicles that enter the site are subject to search. Contract employees may encounter delays with vehicle inspection and identification checks upon entering and exiting the installation. The government will not reimburse the contractor for time spent at installation checkpoints. Contract employees should plan accordingly and report to work in advance of their scheduled duty time as may be necessary.

3.8 EMPLOYEE CONDUCT

Contractor employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, prohibition to wearing of parts of DHS uniforms, and prohibition to possession of weapons) when visiting or working at Government facilities. Tobacco use will only be permitted in designated areas. At no time should the Contractor employees enter a government building without an escort.

Contractor employees will be authorized to use restrooms on site. The Contractor must ensure Contractor employees present a professional appearance and that their conduct does not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.8.1 Removing Employees for Misconduct or Security Reasons –

The US Coast Guard may, at its sole discretion, direct the Contractor to remove any Contractor employee from the U.S. Coast Guard facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under any task order awarded under this task order. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 GOVERNMENT REQUIREMENTS

4.1 CONTRACTING OFFICER’S REPRESENTATIVE

The US Coast Guard will designate in writing, a COR. The COR will be the point of contact for the Project Manager. The COR will ensure access to all necessary workspaces is coordinated with building occupants in advance of work to prevent any loss of contractor time or productivity.

4.2 QUALITY ASSURANCE EVALUATOR

A Quality Assurance Evaluator (QAE) will be verbally designated by the COR. The QAE will be selected from personnel at Station Cortez. The QAE will report directly to the COR on all matters related to the project and will make no decisions that affect the scope or specifications of work. The QAE will be the on-site point of contact for the Contractor employees and will have decision making authority on matters that do not affect the scope or specifications of work.

4.3 INSPECTION AND ACCEPTANCE

Final inspection will include functional testing of all doors to ensure clearance with newly installed floors and a walk through of all spaces to ensure floors/moldings are free from blemish and check quality of installation.

5.0 ADMINISTRATION

5.1 PERMITS

The Contractor must, without additional expense to the government, obtain all appointments, licenses, and permits required for the completion of all work pertaining to this project. The Contractor must comply with all applicable federal, state, and local laws and codes.

5.2 SITE VISIT.

It is recommended that all prospective bidders visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for properly estimating the difficulty or cost of successfully performing the work. The government will assume no responsibility or financial liability for any misinterpretation or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification, or related documents.

5.2.1 Site Visit Opportunities

Interested parties should plan for a site visit with Station Cortez’s Engineering Petty Officer. Site visit opportunities will be available on Tuesdays and Thursdays between the hours of 0830 and 1330. No site visits will be authorized outside of normal working hours.

5.3 MODIFICATIONS

No modifications to the contract shall be authorized by any person other than the Contracting Officer. No oral statements or any person other than the Contracting Officer shall in any manner or degree modify or otherwise affect the terms of the contract.

5.4 PROJECT LOCATION

All work will be performed at:

USCG Station Cortez 4530 124th St. Ct. W.

Bradenton, FL 34209