3_Valley_Museum_FA_FP_Asbuilts.pdf
PDF 3 MB Posted
- Attached to
- Repair Marioff High Pressure Mist System at YOSE
- Solicitation number
- 140P8525Q0067
About this file
This document is a Final Asbuilt Drawing set for a fire protection and suppression system installation at a museum, likely Yosemite Valley Museum. The drawings comprehensively detail the architectural and systems layout across multiple floors, including attic and basement levels. The documentation includes detailed floor plans with annotations for smoke detection, water suppression, and piping systems, utilizing VESDA VLP detection technology.
The technical drawings specify intricate details such as pipe routing, sample hole locations, detector placements, and system configuration across different building zones including museum collections areas, offices, lobby, cultural exhibit spaces, and storage rooms. The drawings follow NFPA-72 guidelines and manufacturers' recommendations, with notes indicating maximum transport time of 120 seconds for detection systems and specifying stainless steel tubing with Parker fittings. The document is marked as a final asbuilt drawing, suggesting these represent the actual installed configuration of the fire protection infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA-1_FINAL ASBUILT
| FA-2_FINAL ASBUILT |
| FA-3_FINAL ASBUILT |
| FA-4 _FINAL ASBUILT |
| FA-5_FINAL ASBUILT |
| FA-6_FINAL ASBUILT |
| FA-7_FINAL ASBUILT |
| FA-8_FINAL ASBUILT |
| FA-9_FINAL ASBUILT |
| FA-10_FINAL ASBUILT |
| FP-1_FINAL ASBUILT |
| FP-2_FINAL ASBUILT |
| FP-3_FINAL ASBUILT |
| FP-4_FINAL ASBUILT |
File details come from the government source that posted it. Updated .