3 TES RM 308 Floor Plan.pdf

PDF 220 KB Posted

Attached to
Schriever SFB 3TES Furniture
Solicitation number
3TESFurniture
Issued by

About this file

This document is an architectural floor plan and renovation specification for office space reconfiguration in Room 308, depicting both the current layout and proposed redesign.

The proposed layout transforms the space into four distinct rooms (308A, 308B, 308C, and 308D) with specific functional designations: a Front Office Customer Service area (308A), Executive Senior Executive Leadership office (308C), Executive Chief Compliance office (308B), and a multipurpose room (308D). The design includes demountable interior walls with Sound Transmission Class (STC) ratings of approximately 40 or higher, cubicle furniture placement, and award display areas. All enclosed rooms must incorporate fire suppression systems. The space also includes dedicated areas for snacks, cabinets, refrigeration, and coffee facilities. The overall dimensions are approximately 29' 5" wide by 30' deep, with detailed measurements and furniture placement shown on a grid layout. The current layout requires significant modification, including removal of a center wall and an upper office area to accommodate the new configuration. The proposed layout is noted as alterable and represents estimates only, indicating flexibility in final implementation based on contractor recommendations or client adjustments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Snack/Cabinets/Fridge/Coffee

(Exec) SEL Ofc

(exec) CC Ofc

(Front Office) CSS Ofc

Aw ard D isplay

Cubicle furniture

- Fire Suppression (must be in every enclosed room)

- All interior walls are to be built

(STC ~40+)

Proposed Layout: Can be altered/only estimates

RM: 308 D

RM: 308 C

RM: 308 B

RM: 308 A

• Solid black interior walls are intended to be demountable walls with doors shown as specific locations

Current Layout

- Center wall needs to be removed, and upper office needs to be removed

Slide Number 1
Slide Number 2

File details come from the government source that posted it. Updated .