3-Technical Specs.pdf
PDF 2 MB Posted
- Attached to
- Deer Run Road Improvements Project
- Solicitation number
- Not on record
- Issued by
- Berks County, Pennsylvania
About this file
This is a technical specifications document for the Kutztown Road Curb, Sidewalk, and Street Project in Maxatawny Township, Berks County, Pennsylvania. The project encompasses selective demolition, concrete forming and reinforcement, cast-in-place concrete work, concrete curing, earthwork, excavation, erosion and sedimentation controls, aggregate base courses, and asphalt paving. The scope includes demolition and removal of existing concrete sidewalks, curbs, and asphalt paving, followed by installation of new asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe infrastructure. Sealed proposals are due by 11:00 a.m. on Monday, February 2, 2026, via the PennBid Program, with public bid opening and tabulation at the same date and time. The bids may be held for up to 60 days for review and approval purposes, with potential public award on February 9, 2025, at 6:30 p.m. at Maxatawny Township offices located at 127 Quarry Road, Kutztown, PA 19530. Prospective bidders must be PennDOT qualified with a minimum of five years' experience in similar work.
The project is funded in part by the Multimodal Transportation Fund (MTF) Program with partial reimbursement through the Commonwealth Financing Authority (CFA). All bidders must comply with the Pennsylvania Prevailing Wage Act and conform to the General Conditions and detailed specifications provided in the bid package. Questions must be submitted online via PennBid by 12:00 p.m. on January 16, 2026, with responses made visible to all bidders on the website. Any modifications to plans or specifications will be distributed as addenda with email notification through the PennBid website. The technical specifications detail material requirements, installation procedures, quality assurance standards, and field quality control testing protocols aligned with applicable ASTM, AASHTO, ACI, and PennDOT standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Div 01.pdf | ||
| 1-Div 00.pdf | ||
| 3-260010.02 HOP.pdf | ||
| 2-Division 1.pdf | ||
| 4-251212 - Full Bid Set.pdf | ||
| 1-Division 0.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McCarthy #230010 KUTZTOWN ROAD Maxatawny Township Berks County
SELECTIVE DEMOLITION 024119 - 1
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Demolition and removal of selected site elements.
2. Salvage of existing items to be reused or recycled.
B. Related Sections include the following:
1. Division 01 Section "Summary of Work" for use of premises and Owner-occupancy requirements.
2. Division 01 Section "Photographic Documentation" for preconstruction photographs taken before selective demolition operations.
3. Division 01 Section "Temporary Facilities and Controls" for temporary construction and environmental-protection measures for selective demolition operations.
4. Division 01 Section "Execution" for cutting and patching procedures.
5. Division 01 Section "Construction Waste Management and Disposal" for disposal of demolished materials.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 MATERIALS OWNERSHIP
A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to Owner that may be encountered during selective demolition remain Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Owner.
1.4 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate the following:
SELECTIVE DEMOLITION 024119 - 2
1. Interruption of utility services. Indicate how long utility services will be interrupted.
2. Coordination for shutoff, capping, and continuation of utility services.
3. Locations of proposed dust- and noise-control operations.
B. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by selective demolition operations. Comply with Division 01 Section "Photographic Documentation." Submit before Work begins.
C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.
1. Comply with submittal requirements in Division 01 Section "Construction Waste Management and Disposal."
1.5 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
C. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
D. Standards: Comply with ANSI A10.6 and NFPA 241.
E. Predemolition Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination."
1.6 PROJECT CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
B. Notify Engineer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Engineer and Owner. Owner will remove hazardous materials under a separate contract.
2. materials except under procedures specified elsewhere in the Contract Documents.
D. Storage or sale of removed items or materials on-site is not permitted.
SELECTIVE DEMOLITION 024119 - 3
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Engineer.
E. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.
F. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.
1. Comply with requirements for existing services/systems interruptions specified in Division 01 Section "Summary."
2. Arrange to shut off indicated utilities with utility companies.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Comply with requirements for access and protection specified in Division 01 Section "Temporary Facilities and Controls."
SELECTIVE DEMOLITION 024119 - 4
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01 Section "Temporary Facilities and Controls."
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove and reuse existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Maintain adequate ventilation when using cutting torches.
5. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
SELECTIVE DEMOLITION 024119 - 5
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Engineer, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Cut concrete to a depth of at least 3/4 inch at junctures with construction to remain, using power-driven saw. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete indicated for selective demolition. Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals, using power-driven saw, then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, then remove masonry between saw cuts.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Division 01 Section "Construction Waste Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
CONCRETE FORMING AND ACCESSORIES 031000 - 1
SECTION 031000 - CONCRETE FORMING AND ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Formwork for cast-in-place concrete.
2. Shoring, bracing, and anchorage.
3. Form accessories.
4. Form stripping.
5. Steel structural reinforcement.
B. Related Sections include the following:
1. Division 03 Sections Concrete Reinforcing, Cast-in-place Concrete, Concrete Curing, & Grouting for concrete work items.
2. Section 321313 Concrete Paving.
C. Related Requirements:
1. Section 032000 - Concrete Reinforcing: Reinforcing steel and required supports for cast-in-place concrete.
2. Section 033000 - Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frame, slabs-on-grade, and other concrete components associated with building.
1.2 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Section 012000 - Price and Payment Procedures: Contract Sum/Price modification procedures.
B. Incidental to concrete work items.
1.3 REFERENCE STANDARDS
A. American Concrete Institute:
1. ACI 117 - Specification for Tolerances for Concrete Construction and Materials.
2. ACI 301 - Specifications for Structural Concrete.
3. ACI 318 - Building Code Requirements for Structural Concrete.
4. ACI 347 - Guide to Formwork for Concrete.
B. American Forest & Paper Association:
1. AF&PA - National Design Specification (NDS) for Wood Construction.
C. APA - The Engineered Wood Association:
CONCRETE FORMING AND ACCESSORIES 031000 - 2
1. APA/EWA PS 1 - Voluntary Product Standard - Structural Plywood.
D. ASTM International:
1. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).
2. ASTM E96 - Standard Test Methods for Water Vapor Transmission of Materials.
3. ASTM E96M - Standard Test Methods for Water Vapor Transmission of Materials.
E. West Coast Lumber Inspection Bureau:
1. WCLIB - Standard No. 17 Grading Rules for West Coast Lumber.
F. Pennsylvania Department of Transportation :
1. PennDOT Pub 408 and 72 standards.
1.4 COORDINATION
A. Section 013000 - Administrative Requirements: Requirements for coordination.
B. Coordinate Work of this Section with other Sections of Work in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work.
1.5 SUBMITTALS
A. Section 013300 - Submittal Procedures: Requirements for submittals.
B. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
C. Qualifications Statement:
1. Submit qualifications for licensed professional.
1.6 QUALITY ASSURANCE
A. Perform Work according to ACI 347.
B. For wood products furnished for Work of this Section, comply with AF&PA.
C. Perform Work according to Municipal and PennDOT Pub 408 standards.
D. Maintain copies of each standard affecting Work of this Section on Site.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Section 016000 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
CONCRETE FORMING AND ACCESSORIES 031000 - 3
B. Inspection: Accept void forms on Site in manufacturer's original packaging and inspect for damage.
C. Store materials off ground in ventilated and protected manner to prevent deterioration from moisture.
PART 2 - PRODUCTS
2.1 PERFORMANCE AND DESIGN CRITERIA
A. Design, engineer, and construct formwork, shoring, and bracing according to ACI 347 to conform to design and applicable municipal code requirements to achieve concrete shape, line, and dimension as indicated on Drawings.
2.2 WOOD FORM MATERIALS
A. Form Materials: At discretion of Contractor.
B. Lumber Forms:
1. Applications: Edge forms and unexposed finish concrete.
2. Boards:
a. Description:
1) Surface boards on four sides.
b. Material: "Standard" grade Douglas fir according to WCLIB Standard No. 17.
c. Width: 8 inches (200 mm).
C. Plywood Forms:
1. Application: Exposed finish concrete.
2. Description:
a. Comply with APA/EWA PS 1.
2.3 PREFABRICATED FORMS
A. Furnish materials according to municipal standards.
B. Form Liners: Smooth, durable, grainless, and non-staining hardboard unless otherwise indicated on Drawings.
C. Framing, Studding, and Bracing: Stud or No. 3 structural light-framing grade.
CONCRETE FORMING AND ACCESSORIES 031000 - 4
2.4 FORMWORK ACCESSORIES
A. Form Release Agent:
1. Description: Colorless mineral oil that will not stain concrete or absorb moisture.
B. Vapor Retarder:
1. Description: Polyethylene sheet.
2. Thickness: 8 mils (0.2 mm).
C. Bituminous Joint Filler: Comply with ASTM D1751.
D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Size, strength, and character to maintain formwork in place while placing concrete.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 017000 - Execution and Closeout Requirements: Requirements for installation examination.
B. Verify lines, levels, and centers before proceeding with formwork.
C. Verify that dimensions agree with Drawings.
D. If formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement, request instructions from Architect/Engineer before proceeding.
3.2 INSTALLATION
A. Earth Forms: Not permitted.
B. Formwork:
1. Provide top form for sloped surfaces steeper than 1.5 horizontal to 1 vertical to hold shape of concrete during placement, unless it can be demonstrated that top forms can be omitted.
2. Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient strength to maintain shape and position under imposed loads from construction operations.
3. Camber forms where necessary to produce level finished soffits unless indicated otherwise on Drawings.
4. Positioning:
a. Carefully verify horizontal and vertical positions of forms.
b. Correct misaligned or misplaced forms before placing concrete.
CONCRETE FORMING AND ACCESSORIES 031000 - 5
5. Complete wedging and bracing before placing concrete.
6. Stripping:
a. Arrange and assemble formwork to permit dismantling and stripping.
b. Do not damage concrete during stripping.
c. Permit removal of remaining principal shores.
7. Obtain approval of Architect/Engineer before framing openings in structural members not indicated on Drawings.
8. Install void forms according to manufacturer instructions.
9. Do not reuse wood formwork more than 100 times for concrete surfaces to be exposed to view.
10. Do not patch formwork.
11. Leave forms in place for minimum number of days according to ACI 347.
C. Form Removal:
1. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads, and removal has been approved by Architect/Engineer.
2. Loosen forms carefully; do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.
3. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged.
4. Discard damaged forms.
5. Form Release Agent:
a. Apply according to manufacturer instructions.
b. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.
c. Do not apply form release agent if concrete surfaces are indicated to receive special finishes or applied coverings that may be affected by agent.
d. Soak inside surfaces of untreated forms with clean water, and keep surfaces coated prior to placement of concrete.
6. Form Cleaning:
a. Clean forms as erection proceeds to remove foreign matter within forms.
b. Clean formed cavities of debris prior to placing concrete.
c. Flush with water or use compressed air to remove remaining foreign matter.
d. Ensure that water and debris drain to exterior through cleanout ports.
e. Cold Weather:
1) During cold weather, remove ice and snow from within forms.
2) Do not use de-icing salts.
3) Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure; use compressed air or other dry method to remove foreign matter.
7. Reuse and Coating of Forms:
a. Thoroughly clean forms and reapply form coating before each reuse.
CONCRETE FORMING AND ACCESSORIES 031000 - 6
b. For exposed Work, do not reuse forms with damaged faces or edges.
c. Apply form coating to forms according to manufacturer instructions.
d. Do not coat forms for concrete indicated to receive "scored finish."
e. Apply form coatings before placing reinforcing steel.
D. Forms for Smooth Finish Concrete:
1. Use steel, plywood, or lined-board forms.
2. Use clean and smooth plywood and form liners, uniform in size, and free from surface and edge damage capable of affecting resulting concrete finish.
3. Install form lining with close-fitting square joints between separate sheets without springing into place.
4. Use full-sized sheets of form liners and plywood wherever possible.
5. Tape joints to prevent protrusions in concrete.
6. Apply forming and strip wood forms in a manner to protect corners and edges.
7. Level and continue horizontal joints.
8. Keep wood forms wet until stripped.
E. Architectural Form Liners:
1. Erect architectural side of formwork first.
2. Attach form liner to forms before installing form ties.
3. Install form liners square, with joints and pattern aligned.
4. Seal form liner joints to prevent grout leaks.
5. Dress joints and edges to match form liner pattern and texture.
F. Forms for Surfaces to Receive Membrane Waterproofing:
1. Use plywood or steel forms.
2. After erection of forms, tape form joints to prevent protrusions in concrete.
G. Form Anchors and Hangers:
1. Do not use anchors and hangers leaving exposed metal at concrete surface.
2. Symmetrically arrange hangers supporting forms from structural-steel members to minimize twisting or rotation of member.
3. Penetration of structural-steel members is not permitted.
H. Inserts, Embedded Parts, and Openings:
1. Install formed openings for items to be embedded in or passing through concrete Work.
2. Locate and set in place items required to be cast directly into concrete.
3. Install accessories straight, level, and plumb, and ensure that items are not disturbed during concrete placement.
4. Joints:
a. Install waterstops continuous without displacing reinforcement.
5. Openings:
CONCRETE FORMING AND ACCESSORIES 031000 - 7
a. Provide temporary ports or openings in formwork as required to facilitate cleaning and inspection.
b. Locate openings at bottom of forms to allow flushing water to drain.
6. Close temporary openings with tight-fitting panels, flush with inside face of forms, and neatly fitted such that joints will not be apparent in exposed concrete surfaces.
I. Form Ties:
1. Provide sufficient strength and quantity to prevent spreading of forms.
2. Place ties at least 1 inch (25 mm) away from finished surface of concrete.
3. Leave inner rods in concrete when forms are stripped.
4. Space form ties equidistant, symmetrical, and aligned vertically and horizontally unless indicated otherwise on Drawings.
J. Arrange formwork to allow proper erection sequence and to permit form removal without damage to concrete.
K. Construction Joints:
1. Install surfaced pouring strip where construction joints intersect on exposed surfaces to provide straight line at joints.
2. Just prior to subsequent concrete placement, remove strip and tighten forms to conceal shrinkage.
3. Appearance:
a. Show no overlapping of construction joints.
b. Construct joints to present same appearance as butted plywood joints.
4. Arrange joints in continuous line straight, true, and sharp.
L. Embedded Items:
1. Make provisions for pipes, sleeves, anchors, inserts, reglets, anchor slots, nailers, waterstops, and other features.
2. Do not embed wood or uncoated aluminum in concrete.
3. Obtain installation and setting information for embedded items furnished under other
Sections.
4. Securely anchor embedded items in correct location and alignment prior to placing concrete.
5. Ensure that conduits and pipes, including those made of coated aluminum, meet requirements of ACI 318 regarding size and location limitations.
M. Openings for Items Passing through Concrete:
1. Frame openings in concrete where indicated on Drawings.
2. Establish exact locations, sizes, and other conditions required for openings and attachment of
Work specified under other Sections.
3. Coordinate Work to avoid cutting and patching of concrete after placement.
4. Perform cutting and repairing of concrete required as result of failure to provide required openings.
CONCRETE FORMING AND ACCESSORIES 031000 - 8
N. Screeds:
1. Set screeds and establish levels for tops of and finish on concrete slabs.
2. Slope slabs to drain where required or as indicated on Drawings.
3. Before depositing concrete, remove debris from space to be occupied by concrete and thoroughly wet forms; remove freestanding water.
O. Screed Supports:
1. For concrete over waterproof membranes and vapor retarder membranes, use cradle-, pad-, or base-type screed supports that will not puncture membrane.
2. Staking through membrane is not permitted.
P. Cleanouts and Access Panels:
1. Provide removable cleanout sections or access panels at bottoms of forms to permit inspection and effective cleaning of loose dirt, debris, and waste material.
2. Clean forms and surfaces against which concrete is to be placed.
3. Remove chips, sawdust, and other debris.
4. Thoroughly blow out forms with compressed air just before concrete is placed.
3.3 TOLERANCES
A. Tolerances: Construct formwork to produce completed concrete surfaces within construction tolerances according to ACI 117.
B. Camber:
1. According to ACI 301/318.
3.4 FIELD QUALITY CONTROL
A. Section 014000 - Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect erected formwork, shoring, and bracing to ensure that Work complies with formwork design and that supports, fastenings, wedges, ties, and items are secure.
2. Notify Architect/Engineer after placement of reinforcing steel in forms but prior to placing concrete.
3. Schedule concrete placement to permit formwork inspection before placing concrete.
END OF SECTION 031000
CONCRETE REINFORCING 032000 - 1
SECTION 032000 - CONCRETE REINFORCING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Reinforcing bars.
2. Welded wire fabric.
3. Reinforcement accessories.
B. Related Requirements:
1. Section 033000 – Cast-in-Place Concrete.
2. Section 321313 – Concrete Paving
1.2 REFERENCE STANDARDS
A. American Concrete Institute:
1. ACI 301 - Specifications for Structural Concrete.
2. ACI 318 - Building Code Requirements for Structural Concrete.
3. ACI 530/530.1 - Building Code Requirements and Specification for Masonry Structures.
4. ACI SP-66 - ACI Detailing Manual.
B. American Welding Society:
1. AWS D1.4 - Structural Welding Code - Reinforcing Steel.
C. ASTM International:
1. ASTM A184 - Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement.
2. ASTM A615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete
Reinforcement.
3. ASTM A704 - Standard Specification for Welded Steel Plain Bar or Rod Mats for Concrete Reinforcement.
4. ASTM A706 - Standard Specification for Deformed and Plain Low-Alloy Steel Bars for Concrete
Reinforcement.
5. ASTM A767 - Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement.
6. ASTM A775 - Standard Specification for Epoxy-Coated Steel Reinforcing Bars.
7. ASTM A884 - Standard Specification for Epoxy-Coated Steel Wire and Welded Wire Reinforcement.
8. ASTM A934 - Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars.
CONCRETE REINFORCING 032000 - 2
9. ASTM A996 - Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement.
10. ASTM A1064 - Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
D. Concrete Reinforcing Steel Institute:
1. CRSI 10-MSP - Manual of Standard Practice.
2. CRSI 10PLACE - Placing Reinforcing Bars.
E. Pennsylvania Department of Transportation :
1. PennDOT Pub 408 and 72 standards.
1.3 COORDINATION
A. Section 013100 – Project Management and Coordination: Requirements for coordination.
B. Coordinate Work of this Section with placement of formwork, formed openings, & other Work.
1.4 SUBMITTALS
A. Section 013300 - Submittal Procedures: Requirements for submittals.
B. Shop Drawings:
1. Indicate bar sizes, spacings, locations, splice locations, and quantities of reinforcing steel and welded wire fabric.
2. Indicate bending and cutting schedules.
3. Indicate supporting and spacing devices.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
D. Submit certified copies of mill test report of reinforcement materials analysis.
E. Welder Certificates: Certify welders and welding procedures employed on Work, verifying AWS qualification within previous 12 months.
F. Source Quality-Control Submittals: Indicate results of shop tests and inspections.
G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
H. Qualifications Statement:
1. Welders: Qualify procedures and personnel according to AWS D1.1
I. Perform Work according to ACI 318.
J. Prepare Shop Drawings according to ACI SP-66.
K. Maintain copy of each standard affecting Work of this Section on Site.
CONCRETE REINFORCING 032000 - 3
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 016000 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.6 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
2. Indicate field measurements on Shop Drawings.
PART 2 - PRODUCTS
2.1 REINFORCEMENT
A. Reinforcing Steel: Comply with ASTM A615 and PennDOT Pub 408 Standards
B. Plain Wire: Comply with ASTM A1064 and PennDOT Pub 408 Standards.
C. Welded Deformed Wire Fabric: Comply with ASTM A1064 and PennDOT Pub 408 Standards
2.2 FABRICATION
A. Fabricate concrete reinforcement according to ACI 318 and PennDOT Pub 408 Standards.
2.3 ACCESSORY MATERIALS
A. Fabricate all accessory materials according to PennDOT Pub 408 Standards.
2.4 SOURCE QUALITY CONTROL
A. Provide shop inspection and testing of completed assembly.
B. Section 014000 - Quality Requirements: Requirements for testing, inspection, and analysis.
CONCRETE REINFORCING 032000 - 4
C. Owner Inspection:
1. Make completed concrete reinforcing available for inspection at manufacturer's factory prior to packaging for shipment.
2. Notify Owner at least seven days before inspection is allowed.
D. Owner Witnessing:
1. Allow witnessing of factory inspections and test at manufacturer's test facility.
2. Notify Owner at least seven days before inspections and tests are scheduled.
E. Certificate of Compliance:
1. If fabricator is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at fabricator's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved fabricator.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Place, support, and secure reinforcement against displacement.
B. Do not deviate from required position beyond specified tolerance.
C. Do not weld crossing reinforcement bars for assembly.
D. Do not displace or damage vapor retarder.
E. Accommodate placement of formed openings.
F. Spacing:
1. Space reinforcement bars with minimum clear spacing according to ACI 318.
2. If bars are indicated in multiple layers, place upper bars directly above lower bars.
G. Maintain minimum concrete cover around reinforcement according to ACI 318 as follows:
1. Footings and Concrete Formed against Earth: 3 inches.
2. Concrete Exposed to Earth or Weather:
a. No. 6 Bars and Larger: 2 inches.
b. No. 5 Bars and Smaller: 1-1/2 inches.
3. Supported Slabs, Walls, and Joists:
a. No. 14 Bars and Larger: 1-1/2 inches.
b. No. 11 Bars and Smaller: 3/4 inch.
CONCRETE REINFORCING 032000 - 5
4. Beams and Columns: 1-1/2 inches.
5. Shell and Folded Plate Members:
a. No. 6 Bars and Larger: 3/4 inch.
b. No. 5 Bars and Smaller: 1/2 inch.
H. Splice reinforcing according to manufacturer's instructions.
3.2 TOLERANCES
A. Section 014000 - Quality Requirements: Requirements for tolerances.
B. Install reinforcement within following tolerances for flexural members, walls, and compression members:
1. Reinforcement Depth Greater Than 8 Inches:
a. Depth Tolerance: Plus or Minus 3/8 inch.
b. Concrete Cover Tolerance: Minus 3/8 inch.
2. Reinforcement Depth Less Than or Equal to 8 Inches:
a. Depth Tolerance: Plus or Minus 1/2 inch.
b. Concrete Cover Tolerance: Minus 1/2 inch.
C. Foundation Walls: Install reinforcement within tolerances according to ACI 530/530.1.
3.3 FIELD QUALITY CONTROL
A. Section 014000 - Quality Requirements: Requirements for inspecting and testing.
B. Field inspection by the Engineer.
C. Provide unrestricted access to Work and cooperate with Engineer during inspections.
D. Reinforcement Inspection:
1. Placement Acceptance: Inspect specified and ACI 318 material requirements and specified placement tolerances.
2. Welding: Inspect welds according to AWS D1.1.
3. Periodic Placement Inspection: Inspect for correct materials, fabrication, sizes, locations, spacing, concrete cover, and splicing.
4. Weldability Inspection: Inspect for reinforcement weldability if formed from steel other than ASTM A706.
5. Continuous Weld Inspection: Inspect reinforcement according to ACI 318
6. Periodic Weld Inspection: Inspect other welded connections.
END OF SECTION 032000
CAST-IN-PLACE CONCRETE 033000 - 1
SECTION 033000 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:
1. Slabs-on-grade.
2. Steel structural reinforcement.
B. Related Sections include the following:
1. Division 03 Sections Concrete Forming and Accessories, Concrete Reinforcing, Concrete Curing, & Grouting for concrete work items.
2. Section 321313 – Concrete Paving.
1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of the following:
blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
1. Indicate amounts of mixing water to be withheld for later addition at Project site.
C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and placement.
Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.
D. Formwork Shop Drawings: Prepared by or under the supervision of a qualified professional detailing fabrication, assembly, and support of formwork.
1. Shoring and Reshoring: Indicate proposed schedule and sequence of stripping formwork, shoring removal, and installing and removing reshoring.
E. Samples: For waterstops.
CAST-IN-PLACE CONCRETE 033000 - 2
F. Welding certificates.
G. Qualification Data: For Installer, manufacturer, and testing agency.
H. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:
1. Aggregates.
I. Material Certificates: For each of the following, signed by manufacturers:
1. Cementitious materials.
2. Admixtures.
3. Form materials and form-release agents.
4. Steel reinforcement and accessories.
5. Waterstops.
6. Curing compounds.
7. Floor and slab treatments.
8. Bonding agents.
9. Adhesives.
10. Vapor retarders.
11. Semirigid joint filler.
12. Joint-filler strips.
13. Repair materials.
J. Floor surface flatness and levelness measurements to determine compliance with specified tolerances.
K. Field quality-control test and inspection reports.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer who employs on Project personnel qualified to perform work.
B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
C. Testing Agency Qualifications: An independent agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated, as documented according to
ASTM E 548.
D. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from one source, and obtain admixtures through one source from a single manufacturer.
E. Welding: Qualify procedures and personnel according to AWS D1.4, "Structural Welding Code-- Reinforcing Steel."
CAST-IN-PLACE CONCRETE 033000 - 3
F. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:
1. ACI 301, "Specification for Structural Concrete," Sections 1 through 5.
G. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.
H. Pennsylvania Department of Transportation - PennDOT Pub 408 and 72 standards.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage.
B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil, and other contaminants.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
1. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products specified.
2. Products: Subject to compliance with requirements, provide one of the products specified.
3. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, manufacturers specified.
4. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.
2.2 FORM-FACING MATERIALS
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.
1. Plywood, metal, or other approved panel materials.
2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:
a. High-density overlay, Class 1 or better.
b. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.
c. Structural 1, B-B or better; mill oiled and edge sealed.
CAST-IN-PLACE CONCRETE 033000 - 4
d. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.
B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.
C. Pan-Type Forms: Glass-fiber-reinforced plastic or formed steel, stiffened to resist plastic concrete loads without detrimental deformation.
D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4-inch, minimum.
E. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
F. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing, waterproofing, or coal tar finish.
2.3 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.
B. Epoxy-Coated Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed bars, ASTM A 775/A 775M, epoxy coated, with less than 2 percent damaged coating in each 12-inch bar length.
C. Steel Bar Mats: ASTM A 184/A 184M, fabricated from ASTM A 615/A 615M, Grade 60, deformed bars, assembled with clips.
D. Plain-Steel Wire: ASTM A 82, as drawn galvanized.
E. Deformed-Steel Wire: ASTM A 496.
F. Epoxy-Coated Wire: ASTM A 884/A 884M, Class A, Type 1 coated, as-drawn, plain-steel wire, with less than 2 percent damaged coating in each 12-inch wire length.
G. Plain-Steel Welded Wire Reinforcement: ASTM A 185, plain, fabricated from as-drawn steel wire into flat sheets.
H. Deformed-Steel Welded Wire Reinforcement: ASTM A 497, flat sheet.
I. Galvanized-Steel Welded Wire Reinforcement: ASTM A 185, plain, fabricated from galvanized steel wire into flat sheets.
J. Epoxy-Coated Welded Wire Reinforcement: ASTM A 884/A 884M, Class A coated, Type 1, plain steel.
CAST-IN-PLACE CONCRETE 033000 - 5
2.4 REINFORCEMENT ACCESSORIES
A. Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, cut bars true to length with ends square and free of burrs.
B. Epoxy-Coated Joint Dowel Bars: ASTM A 615/A 615M, Grade 60, plain-steel bars, ASTM A 775/A 775M epoxy coated.
C. Epoxy Repair Coating: Liquid, two-part, epoxy repair coating; compatible with epoxy coating on reinforcement and complying with ASTM A 775/A 775M.
D. Zinc Repair Material: ASTM A 780, zinc-based solder, paint containing zinc dust, or sprayed zinc.
E. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:
1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 stainless-steel bar supports.
2. For epoxy-coated reinforcement, use epoxy-coated or other dielectric-polymer-coated wire bar supports.
3. For zinc-coated reinforcement, use galvanized wire or dielectric-polymer-coated wire bar supports.
2.5 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:
1. Portland Cement: ASTM C 150, Type IIA.
2. Blended Hydraulic Cement: ASTM C 595, Type IS, portland blast-furnace slag cement.
B. Silica Fume: ASTM C 1240, amorphous silica.
C. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source.
1. Maximum Coarse-Aggregate Size: 1 inch nominal.
2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.
D. Water: ASTM C 94/C 94M.
2.6 ADMIXTURES
A. Air-Entraining Admixture: ASTM C 260.
CAST-IN-PLACE CONCRETE 033000 - 6
B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.
2. Retarding Admixture: ASTM C 494/C 494M, Type B.
3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.
4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.
5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.
6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.
C. Set-Accelerating Corrosion-Inhibiting Admixture: Commercially formulated, anodic inhibitor or mixed cathodic and anodic inhibitor; capable of forming a protective barrier and minimizing chloride reactions with steel reinforcement in concrete and complying with ASTM C 494/C 494M, Type C.
2.7 WATERSTOPS
A. Flexible Rubber Waterstops: CE CRD-C 513, with factory-installed metal eyelets, for embedding in concrete to prevent passage of fluids through joints. Factory fabricate corners, intersections, and directional changes.
1. Profile: Flat, dumbbell with center bulb.
2. Dimensions: length as indicated by 3/8 inch thick; nontapered.
B. Granular Fill: Clean mixture of crushed stone or crushed or uncrushed gravel; ASTM D 448, Size 57, with 100 percent passing a 1-1/2-inch sieve and 0 to 5 percent passing a No. 8 sieve.
C. Fine-Graded Granular Material: Clean mixture of crushed stone, crushed gravel, and manufactured or natural sand; ASTM D 448, Size 10, with 100 percent passing a 3/8-inch sieve, 10 to 30 percent passing a No. 100 sieve, and at least 5 percent passing No. 200 sieve; complying with deleterious substance limits of ASTM C 33 for fine aggregates.
2.8 FLOOR AND SLAB TREATMENTS
A. Slip-Resistive Emery Aggregate Finish: Factory-graded, packaged, rustproof, nonglazing, abrasive, crushed emery aggregate containing not less than 50 percent aluminum oxide and not less than 20 percent ferric oxide; unaffected by freezing, moisture, and cleaning materials with 100 percent passing 3/8-inch sieve.
2.9 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.
CAST-IN-PLACE CONCRETE 033000 - 7
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
D. Water: Potable.
E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.
2.10 RELATED MATERIALS
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber.
B. Semirigid Joint Filler: Two-component, semirigid, 100 percent solids, epoxy resin with a Type A shore durometer hardness of 80 per ASTM D 2240.
C. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene.
D. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows:
1. Types II, non-load bearing, IV, load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.
E. Reglets: Fabricate reglets of not less than 0.0217-inch- thick, galvanized steel sheet. Temporarily fill or cover face opening of reglet to prevent intrusion of concrete or debris.
F. Dovetail Anchor Slots: Hot-dip galvanized steel sheet, not less than 0.0336 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
2.11 CONCRETE MIXTURES, GENERAL
A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.
1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.
B. Cementitious Materials: Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than 40 percent.
C. Limit water-soluble, chloride-ion content in hardened concrete to 0.30 percent by weight of cement.
CAST-IN-PLACE CONCRETE 033000 - 8
D. Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water-reducing or plasticizing admixture in concrete, as required, for placement and workability.
2. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
3. Use water-reducing admixture in pumped concrete, concrete for heavy-use industrial slabs and parking structure slabs, concrete required to be watertight, and concrete with a water-cementitious materials ratio below 0.50.
4. Use corrosion-inhibiting admixture in concrete mixtures where indicated.
2.12 CONCRETE MIXTURES FOR BUILDING ELEMENTS
A. Footings: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 4500 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.45.
3. Slump Limit: 4 inches, plus or minus 1 inch.
4. Air Content: 5-1/2 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 1-inch nominal maximum aggregate size.
B. Foundation Walls: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 4500 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.45.
3. Slump Limit: 4 inches, plus or minus 1 inch.
4. Air Content: 5-1/2 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 1-inch nominal maximum aggregate size.
C. Slabs-on-Grade: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 4500 psi at 28 days.
2. Minimum Cementitious Materials Content: 520 lb/cu. yd.
3. Slump Limit: 5 inches, plus or minus 1 inch.
4. Air Content: 5-1/2 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 1-inch nominal maximum aggregate size.
6. Air Content: Do not allow air content of troweled finished floors to exceed 3 percent.
D. Walls: Proportion normal-weight concrete mixture as follows:
1. Minimum Compressive Strength: 5000 psi at 28 days.
2. Maximum Water-Cementitious Materials Ratio: 0.45.
3. Slump Limit: 5 inches, plus or minus 1 inch.
CAST-IN-PLACE CONCRETE 033000 - 9
4. Air Content: 5-1/2 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.
5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 1-inch nominal maximum aggregate size.
2.13 FABRICATING REINFORCEMENT
A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."
2.14 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M, and furnish batch ticket information.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .