This Addendum No. 1 is issued by the Township of Spring, Pennsylvania in connection with its Site Civil Improvements and Building Safety Upgrades project (Entech No. 4644.029) for two separate contracts: Contract No. 1 (General Construction) and Contract No. 2 (Mechanical Construction). The addendum, dated November 11, 2026, clarifies project scope through the inclusion of architectural drawings (A-104, A-105, A-106, A-701, A-702, A-703), elevator shaft condition photographs for reference purposes, and responses to 28 previously submitted bidder questions. The addendum addresses key project elements including ballistic glass and panel details, electrical billboard specifications, foundation waterproofing systems, elevator shaft epoxy injection work, brick repointing scope clarifications, foundation crack repair procedures, interior work scheduling coordination, and excavation limits. Notably, the security camera system has been removed from the project scope, and the engineer has reduced the overall project scope to lower construction costs from the initial estimate. Bidders are advised that mandatory pre-bid attendance applies only to general contractors submitting through PennBid, and that permits will be waived by the Township, though all required permit applications, plan reviews, and inspections remain applicable. The bid opening date of December 2, 2026 at 2:00 p.m. remains in effect, with bids remaining subject to acceptance for 60 days after opening, or 120 days if delayed by government agency approvals, bond sales, or grant awards.
The contract contains multiple unit price line items for contingency work, including brick repointing (Bid Item No. 21), foundation crack repair per linear foot (Bid Item No. 22), and additional pressure-treated wood framing and concrete as may be required. All bid line items in the lump sum format are mandatory and cannot be omitted or submitted with zero-dollar amounts without rendering the bid non-responsive. The General Contractor is responsible for obtaining all permits and licenses, providing concrete testing (minimum one test during concrete placement), completing all required background checks and security clearances for personnel accessing secured areas, and coordinating all interior work with the Owner to minimize disruption to Police Department operations. All material shall comply with Pennsylvania prevailing wage requirements and steel products must be produced in the United States. The contract requires a 10 percent bid bond from an acceptable surety and includes warranty provisions requiring the contractor to remedy any defective materials or workmanship for three years from the date of substantial completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
Township of Spring
Site Civil Improvements and Building Safety Upgrades Contract No. 1 – General Construction
Contract No. 2 – Mechanical Construction
Entech No. 4644.029
November 11, 2026
The following addendum items hereby become an integral part and take precedence over the original drawings and project manual as though originally included therein at length and shall be so honored in the preparation of the Contractor’s bid and execution of the Contract.
Item 1.1 Project Manual
Elevator Shaft Photos
Addendum No. 1 includes photographs of the elevator shaft conditions for contractor reference and clarification purposes only. The photographs are being provided to assist bidders in understanding the existing conditions associated with the elevator shaft injection work.
Item 1.2 Previous Bid Questions and Answers
Please see attached.
Item 1.3 Project Drawings
Drawing A-104, A-105, A-106, A-701, A-702, A-703
ADD Drawings A-104, A-105, A-106, A-701, A-702, A-703 in their entirety to the project (Addendum No. 1).
END OF ADDENDUM NO. 1
The following includes all Questions and Answers from the previous bid, listed in the original chronological order. Due to the high estimated construction cost, the engineer reduced the project's scope to lower the overall construction cost. Questions and Answers “Applicable to this Rebid” are included below, while items that no longer apply are identified as "NOT applicable to this Rebid".
#1 - Pre-Bid Conference “NOT applicable to this Rebid” The updated project manual addresses this requirement.
#2 - Reason for Re-Bid “NOT applicable to this Rebid”
#3 - Engineer’s estimate?
“NOT applicable to this Rebid”
#4 - Brick Repointing “Applicable to this Rebid” Please Refer to Bid Item No. 21 in place of Bid Item No. 22 referenced in the previous answer below.
Question Status Is any brick repointing work to be included in the base bid, or will all repointing work be done by change order utilizing the unit pricing? If brick repointing is to be included in the base bid, please provide a SF of work to include.
Hollenbach Construction, Inc.
May 15, 2026 2:57 PM
#4 - Answer Brick repointing work is not included in the Base Bid unless specifically identified on the Drawings or Specifications. The intent of Bid Item No. 22 is to address localized repointing associated with installation of the new counter flashing at the perimeter waterproofing system. The Contractor shall include normal counter flashing installation procedures within the Base Bid. If adjacent mortar joints are damaged, loosened, or otherwise compromised during installation of the counter flashing, those localized repairs shall be compensated under the applicable unit price bid item.
Clint Davis May 15, 2026 4:08 PM
#5 - Foundation Crack Repair “Applicable to this Rebid” Please Refer to Bid Item No. 22 in place of Bid Item No. 23 referenced in the previous answer below.
Question Status Please verify all foundation crack repair work will be done by change order utilizing the unit pricing, and nothing should be included in the base bid for this work.
Hollenbach Construction, Inc.
May 15, 2026 2:59 PM
#5 - Answer Foundation crack repair associated with Bid Item No. 23 is separate from Bid Item No. 8 (Elevator Pit Chemical Grout Injection and Joint Sealing). Bid Item No. 23 is intended to address cracks discovered following excavation and removal of the existing foundation waterproofing system.
Contractors shall provide a unit price per linear foot for crack injection repair in the event cracks are exposed in the foundation during construction. No additional unidentified foundation crack repair quantities shall be included in the Base Bid.
Clint Davis May 15, 2026 4:10 PM
#6 - Interior Work Schedule “Applicable to this Rebid” Question Status Can all of the interior building work be done at the same time, or will we only be permitted to work in certain rooms at the same time?
Hollenbach Construction, Inc.
May 15, 2026 3:07 PM
#6 - Answer The Contractor may perform interior work concurrently in multiple areas, provided all work is coordinated with the Owner. Contractors shall comply with all security and access requirements identified in the Project Manual. Personnel performing interior work within the building shall complete all required background checks, clearances, and security coordination procedures prior to accessing secured areas of the facility. Coordination with the Owner shall be maintained at all times to minimize disruption to Police Department operations.
Clint Davis May 15, 2026 4:11 PM
#7 - Appendix B - List of Equipment & Materials “NOT applicable to this Rebid” The updated project manual addresses this requirement.
#8 - Bid Breakdown “Applicable to this Rebid” Question Status Please verify the bid breakdown on the GC bid form is for informational purposes only, and that individual line items can not be removed from the lump sum bid cost.
Hollenbach Construction, Inc.
May 15, 2026 3:09 PM
#8 - Answer The lump sum line items must not be omitted. Omissions or inclusion of zero-dollar amounts in the line items would result in the determination that bid is non-responsive.
May 18, 2026 2:43 PM
#9 - Alternates “NOT applicable to this Rebid” The updated project drawings addresses this requirement.
#10 - RE: RFI #4 Brick Repointing “Applicable to this Rebid” Please Refer to Bid Item No. 21 in place of Bid Item No. 22 referenced in the previous answer below.
Question Status The floor plans and elevations do not specifically identify any brick repointing. However, A-106 Architectural Repair/Misc Note #1 states "patch, repair and repoint deteriorated brick and mortar to match original color, texture & finish". Also, spec 040120.64 on drawing A-703, item 3.2.3 indicates “joints at locations of the following defects...”. This leaves it up to individual interpretation. If any brick repointing should be included in the base bid, please provide a quantity to include so all bids are equal.
Hollenbach Construction, Inc.
May 21, 2026 11:30 AM
#10 - Answer No, brick repointing work is not included in the Base Bid. Contractors are not expected to inspect and repoint all masonry joints around the building. The counter flashing scope includes removal of mortar at the flashing termination location and sealing of the reglet joint as part of the flashing installation and is not considered part of Bid Item No. 22. Bid Item No. 22 is intended only for localized mortar joint repairs adjacent to the counter flashing installation where joints become loosened, damaged, or otherwise compromised during construction. Contractors shall provide a unit price under Bid Form (Contract No. 1) Item No. 22 for potential localized repointing work.
Clint Davis May 21, 2026 2:03 PM
#11 - Site Visits “NOT applicable to this Rebid”
#12 - New Applied Glass Stops “Applicable to this Rebid” Question Status Detail 3 on A-104, are the new applied glass stops to be done vertically and horizontally, or just vertical?
Hollenbach Construction, Inc.
May 21, 2026 11:24 AM
#12 - Answer The applied glass stops shall be installed at the full perimeter of the glass.
May 21, 2026 3:40 PM
#13 - Elevator Shaft “Applicable to this Rebid” Question Status Could you please share pictures of the elevator shaft? Also, do you have any recommended subcontractors for the epoxy injection work?
Hollenbach Construction, Inc.
May 28, 2026 8:42 AM
#13 - Answer Addendum No. 3 includes photographs of the elevator shaft conditions for contractor reference and clarification purposes only. The photographs are being provided to assist bidders in understanding the existing conditions associated with the elevator shaft injection work. Chemical injection contractors have been notified and added to the PennBid vendor list for bidder convenience should quotes be needed for this portion of work.
Clint Davis May 29, 2026 12:02 PM
#14 - Camera cable pathways “NOT applicable to this Rebid” The security camera system has been removed from the project scope.
#15 - Camera downtime “NOT applicable to this Rebid” The security camera system has been removed from the project scope.
#16 - Expected order date “NOT applicable to this Rebid”
#17 - Camera model clarification “NOT applicable to this Rebid” The security camera system has been removed from the project scope.
#18 - Switch Specification project scope.
#19 - Training on Cameras project scope.
#20 - HEPA Filters
#21 - Mandatory PreBid Attendance Requirement “Applicable to this Rebid” Question Status Does the mandatory PreBid requirement apply only to General Contractors submitting bids through PennBid, or does it also apply to subcontractors?
Clint Davis Jun 01, 2026 4:13 PM
#21 - Answer Mandatory PreBid attendance applies only to General Contractors submitting bids through PennBid.
Subcontractors are not required to attend.
Clint Davis Jun 01, 2026 4:13 PM
#22 - Electrical Scope – Contract Division (Contract No. 1 vs Contract No. 2) “NOT applicable to this Rebid”
#23 - Required Permits “Applicable to this Rebid” Question Status Are the General Contractors responsible for obtaining all required permits?
Clint Davis Jun 02, 2026 2:47 PM
#23 - Answer Permits are required for this project. The General Construction Contractor (Contract No. 1) and the Mechanical Contractor (Contract No. 2) shall each be responsible for obtaining the permits associated with their respective contract scopes. Separate permit applications shall be submitted for each contract. The Township has advised that permit fees will be waived. However, all required permit applications, plan reviews, and inspections remain applicable.
Clint Davis Jun 02, 2026 2:47 PM
#24 - Concrete Testing “Applicable to this Rebid” Question Status Is the General Contractor responsible for performing concrete testing for the project?
Clint Davis Jun 02, 2026 2:53 PM
#24 - Answer Yes. The General Contractor shall be responsible for providing concrete testing as required for the project. At a minimum, one concrete test shall be performed during concrete placement. Testing is not required for every truckload unless otherwise required by the Contract Documents or applicable codes and standards.
Clint Davis Jun 02, 2026 2:53 PM
#25 - Current Fire Alarm Service Provider
#26 - HOT WATER PIPING:
“NOT applicable to this Rebid” The updated project drawings addresses this requirement.
#27 - Carrier unit - Cooling Only “NOT applicable to this Rebid”
#28 - Engineer Clarification – Excavation Limits Depicted on Sheet C-403 “Applicable to this Rebid” Question Status For bidding purposes, the Engineer is providing the following clarification regarding the grey shaded area shown on Sheet C-403.
Clint Davis Jun 03, 2026 4:25 PM
#28 - Answer The grey shaded area is intended to generally depict the anticipated excavation limits associated with the foundation waterproofing, foundation drain installation, and restoration work. It is not intended to define an exact excavation width. Temporary excavation limits, excavation support systems, and site slopes required for construction have not been shown on the Drawings. The Contractor shall determine and provide all excavation, shoring, sloping, and other measures necessary to safely perform the work in accordance with the Contract Documents, applicable laws, regulations, codes, and accepted industry practices. Actual excavation limits may vary based on field conditions and the Contractor's means and methods.
Jun 03, 2026 4:25 PM
A
B
2 3
C
D
1 2 3
4 5 6
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
TO
W
N
SH
IP
O
F
SP
R
IN
G
TO
W N
SH
IP
O F
SP
R
IN
G
, B
ER
KS
C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
SI
TE
C
IV
IL
IM
PR
OV
EM
EN
TS
A
ND
B
UI
LD
IN
G
SA
FE
TY
U
PG
RA
DE
S
/1
1/
BI
D
D
IN
G
SO
G
4644.029
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
DRAWING NO.
SOG
EMG / BB
AS NOTED
SOG
24-0010
MGA PROJECT NO.
AR
C
H
IT
EC
TU
R
AL
BA
LL
IS
TI
C G
LA
SS
A
ND
P
AN
EL
D
ET
AI
LS
A
ND
N
O
TE
S
A-104
P E
N N
A V
E N
U E
W Y
O M
IS
S
IN
G
P
A
.3
.4 w w w .M
G -A rc h it e c ts
.c o m
24-0010_Spring Twp PD.pln | V:\Drawings\24-0010.0_Entech-Spring Twp PD Security Upgrades\1-Design\24-0010_Spring Twp PD.pln | 5/11/2026 | 2:16 PM
A-104
1"
TYP.
2.01.02
5.50.01 9.29.01
2.01.04
2.01.022.01.04
CUT GYPSUM BOARD
FLUSH w/ EDGE OF
EXISTING DOOR FRAME
2.41.01
CUT GYPSUM BOARD
FLUSH w/ EDGE OF
EXISTING DOOR FRAME
2.41.01
GYPSUM BOARD
MAY REMAIN BEHIND
DOOR FRAME IF SECURE
2.01.01
2.01.01
2.01.03
2.01.03
7.44.01
7.44.02
7.92.01 SECURE SIDE
LOBBY SIDE
SECURE SIDE
LOBBY SIDE
DEMOLITION DETAIL
NEW WORK DETAIL
EX
IS
TIN
G
W A
LL
FR
A M
IN
G
2.41.01
2.01.03
2.01.04
2.01.03
2.01.04
7.44.02
9.29.01
SECURE SIDE
LOBBY SIDE
SECURE SIDE
LOBBY SIDE
DEMOLITION DETAIL
NEW WORK DETAIL
PARTITION TYPE
SEE FLOOR PLAN
2.41.152.41.162.41.16 2.41.01
2.01.02
2.01.02
2.01.03
2.01.04
7.44.02
9.29.01
8.81.01
7.92.02
8.81.03
TAMPER RESISTANT SCREWS (LOBBY SIDE)
OR REGULAR SCREWS (SECURE SIDE) @
8" o.c.
LOBBY SIDE
SECURE SIDE
DEMOLITION DETAIL
NEW WORK DETAIL @ G1, G2
LOBBY SIDE
SECURE SIDE
A-104
6' -1
0"
TY
PI
C
A L
D O
O R
PA
N
EL
2'-10"
TYPICAL DOOR
PANEL
7.44.01
5.50.01
SEE DETAIL:
A-102
A-102
A-102
A-102
A-102
A-102
4" 8"
1' -7
/8
4"
1' -8
1'
-8
/8
7' -2
4"
3/ 4"
1' -7
/8
4"
1' -8
1'
-8
/8
7' -2
7' -0
4" 8"
1' -7
/8
4"
1' -8
1'
-8
/8
1'-5 3/4"
3'-5 1/2"5'-0"
4" 8"
1' -7
/8
4"
1' -8
1'
-8
/8
7' -2
7' -0
5'-0"
4" 8"
1' -7
/8
4"
1' -8
1'
-8
/8
7' -2
7' -0
5'-0"
4" 8"
1' -7
/8
4"
1' -8
1'
-8
/8
1'-6"
5'-1 7/8"
COUNTERTOP
6'-8" 1'-5 5/8" 1'-5 5/8"
EXISTING
MAIL SLOT
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.01
8.81.018.81.018.81.01
8.81.018.81.018.81.01
8.81.018.81.018.81.01
2.01.06
2.01.06
2.01.06
2.01.06
2.01.06
2.01.06
2.01.06
2.01.062.01.06
2.01.06
2.01.06
2.01.06
2.01.06
2.01.06
2.01.062.01.062.01.06
2.01.062.01.06
8.81.02 9.92.03
8.81.02 9.92.03
8.81.02 9.92.03
8.81.02
9.92.03 9.92.03
G1 G2 G2.1 G3 G4 G5
EXISTING GLAZING STOPS
ON LOBBY SIDE
1'-5 5/8"1'-5 5/8"
KEYED NOTES
02 DEMOLITION
2.01 EXISTING CONDITIONS
2.01.01 EXISTING 3'-0" x 7'-0" WOOD DOOR PANEL
2.01.02 EXISTING HOLLOW METAL DOOR FRAME
2.01.03 EXISTING GYPSUM BOARD TO REMAIN
2.01.04 EXISTING STUD WALL FRAMING TO REMAIN
2.01.06 EXISTING METAL INFILL PANEL
2.41 SELECTIVE DEMOLITION
2.41.01 REMOVE EXISTING GYPSUM BOARD SHEATHING
2.41.15 REMOVE EXISTING GLAZING PANEL
2.41.16 REMOVE EXISTING WINDOW FRAME GLAZING STOP
05 METALS
5.50 METAL FABRICATIONS
5.50.01 CONTINUOUS ALUMINUM J-CHANNEL TRIM FOR
PERIMETER OF PANEL.
07 THERMAL AND MOISTURE PROTECTION
7.44 FACED PANELS
7.44.01 PROVIDE UL 752 LEVEL III BALLISTICS PANEL ATTACHED
TO SECURE SIDE OF THE EXISTING DOOR. PROVIDE
METAL EDGE CHANNEL AROUND ENTIRE PERIMETER.
SIZE TO 2" LESS THAN DOOR PANEL WIDTH AND
HEIGHT. ROUTE PANEL AS REQUIRED FOR DOOR
HARDWARE. BASIS OF DESIGN: WACO COMPOSITES
ARMORCORE BULLET RESISTANT FIBERGLASS PANEL;
7/16" THICK.
7.44.02 BULLET RESISTANT FIBERGLASS PANEL ANCHORED TO
EXISTING WALL STRUCTURE. UL 752 LEVEL III RATED.
BASIS OF DESIGN: WACO COMPOSITES ARMORCORE
BULLET RESISTANT FIBERGLASS PANEL; 7/16" THICK.
7.92 JOINT SEALANTS
7.92.01 CONTINUOUS SEALANT, CONTINUOUS FOR ENTIRE
DOOR FRAME PERIMETER
7.92.02 CONTINUOUS SEALANT w/ NEOPRENE SPACERS
08 OPENINGS
8.81 GLASS GLAZING
8.81.01 NEW UL 752 LEVEL III BALLISTICS GLAZING. BASIS OF
DESIGN: McGRORY GLASS BALLISTICDEFEND 3-GCP, 1 1/4" NOMINAL THICKNESS.
8.81.02 IN LOCATIONS WHERE GLAZING STOPS ARE LOCATED
ON NON-SECURE SIDE OF PARTITION, CONTRACTOR
TO INSTALL SECURITY PHILLIPS-HEAD SCREWS w/
TAMPER RESISTANT PIN. MATCH EXISTING SCREW SIZE
AND THREADING
8.81.03 NEW 1 5/8" WIDE, 12ga STEEL PLATE SURFACE
MOUNTED GLASS STOP; ROUND-OFF OR BEVEL ALL
EXPOSED EDGES. PRIME AND PAINT (TWO COATS) TO
MATCH EXISTING FRAME PAINT.
09 FINISHES
9.29 GYPSUM BOARD
9.29.01 FOLLOWING INSTALLATION OF BALLISTICS SHEATHING,
INSTALL NEW 1/4" GYPSUM BOARD SHEATHING.
FINISH TO LEVEL 4.
9.92 INTERIOR PAINTING
9.92.03 ALL DOOR AND INTERIOR WINDOW FRAMES
MODIFIED BY THIS SCOPE OF WORK SHALL RECEIVE
ONE FULL-COAT OF SEMI-GLOSS ACRYLIC LATEX
ENAMEL.
SCALE: 3" = 1'-0"2 DOOR PANEL DETAIL
SCALE: 3" = 1'-0"1 WALL PANEL DETAIL
SCALE: 3" = 1'-0"3 GLAZING FRAME DETAILS
SCALE: 1/2" = 1'-0"4
TYPICAL INTERIOR
DOOR ELEVATION
SCALE: 3/4" = 1'-0"5 INTERIOR GLAZING ELEVATIONS
SC
O
TT
O
. G
RA
H A
M A
IA
, L
EE
D
A P
BD
+C
Sc ot tG
M G
-A rc hi te ct s.c om
B
2 3
C
D
1 2 3
4 5 6
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
TO
W
N
SH
IP
O
F
SP
R
IN
G
TO
W N
SH
IP
O F
SP
R
IN
G
, B
ER
KS
C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
SI
TE
C
IV
IL
IM
PR
OV
EM
EN
TS
A
ND
B
UI
LD
IN
G
SA
FE
TY
U
PG
RA
DE
S
/1
1/
BI
D
D
IN
G
SO
G
4644.029
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
DRAWING NO.
SOG
EMG / BB
AS NOTED
SOG
24-0010
MGA PROJECT NO.
AR
C
H
IT
EC
TU
R
AL
EL
EC
TR
IC
AL
B
IL
LB
O
AR
D
PL
AN
A
ND
D
ET
AI
LS
A-105
P E
N N
A V
E N
U E
W Y
O M
IS
S
IN
G
P
A
.3
.4 w w w .M
G -A rc h it e c ts
.c o m
24-0010_Spring Twp PD.pln | V:\Drawings\24-0010.0_Entech-Spring Twp PD Security Upgrades\1-Design\24-0010_Spring Twp PD.pln | 5/11/2026 | 2:16 PM
AC wiring Diagram
A A
A A
5' -3
/8
" A
PP
X.
M
.O
8'-9"
1'-4" 6'-1" APPX
M.O.
1'-4"
5"5" 5'-3" 1'-4"1'-4"
1' -8
3" 1'
-2
3"
2' -3
/8
" A
PP
X.
M
.O
3' -0
(A
PP
X.
E
XI
ST
IN
G
8'-9"
1'-4" 6'-1" APPX
M.O.
1'-4"
2' -4
/4
1/ 2"
1/
2"2 5/8"
EDGE OF CAP ABOVE
2.01.09
2.41.20 10.14.01
2.01.09
2.01.09
2.01.09
2.41.20
2.41.21
2.41.22 10.14.02
10.14.03
10.14.03 10.14.01
10.14.01
2.41.22
10.14.0110.14.01
9.96.01
2.01.102.01.10
2.01.11 9.96.01
5.50.04
5.50.03
5.50.02
5.50.02
5.50.02
5.50.03
9.96.01
2.41.20
2.41.20
5.50.02 5.50.02
TOWNSHIP OF SPRING
P O L I C E
ELEVATION
PLAN
SECTION A-A
MANUFACTURER SHOP DRAWING
TOWNSHIP OF SPRING
P O L I C E
DEMOLITION ELEVATION
TO PULL BOX
EXISTING MONUMENT SIGNAGE PHOTO
A-105
#2800
SH
ILL
IN
G
TO
N
RD
SPO
HN RD.
NOTE: CONTRACTOR TO LOCATE EXISTING
LIGHTING CIRCUIT FOR MONUMENT SIGN. INSTALL
NEW FRP PULL BOX AND PVC CONDUIT TO NEW
DIGITAL DISPLAYS. EXTEND CIRCUIT WIRING TO
MONUMENT SIGN DISPLAYS
KEYED NOTES
02 DEMOLITION
2.01 EXISTING CONDITIONS
2.01.09 EXISTING MASONRY MONUMENT SIGN
2.01.10 EXISTING CAP TO REMAIN
2.01.11 EXISTING BRICK MASONRY TO REMAIN
2.41 SELECTIVE DEMOLITION
2.41.20 REMOVE EXISTING READER BOARD SIGNAGE PANEL IN ITS
ENTIRETY.
2.41.21 REMOVE AND REINSTALL "POLICE" LETTERING. FINAL HEIGHT TO BE
CONFIRMED w/ ARCHITECT. PATCH ABANDONED ANCHOR HOLES
TO MATCH MASONRY; BOTH SIDES.
2.41.22 REMOVE TOP HALF-HEIGHT SOLDIER COURSE; BOTH SIDES. STABILIZE
MASONRY AS REQUIRED AND INSTALL SUPPLEMENTAL GROUT AS
NEEDED TO PREPARE OPENING FOR NEW DISPLAY ANCHORAGE.
05 METALS
5.50 METAL FABRICATIONS
5.50.02 PROVIDE 304 STAINLESS STEEL, 1/2" No. 18 FLATTENED EXPANDED
METAL MESH w/ INSECT SCREEN BACKING (BLACK) BETWEEN
PERIMETER OF SIGN AND MASONRY OPENING. PROVIDE 3/8"
STAINLESS STEEL U-EDGE AROUND PERIMETERS. FIELD COORDINATE
STAINLESS STEEL ANGLE BRACKETS AND FASTENERS TO SECURE
MESH TO MASONRY OPENING, SPACED @ 28" o.c. MAX.
5.50.03 2 1/2" x 4" x 1/4" GALVANIZED STEEL ANGLES; 7 7/8" LONG w/
DRILLED HOLES MATCHING MANUFACTURER'S SHOP DRAWINGS; 8
LOCATIONS
5.50.04 MASONRY EXPANSION ANCHORS; GALVANIZED.
09 FINISHES
9.96 HIGH PERFORMANCE COATINGS | SPEC 099600
9.96.01 PAINT EXISTING LINTELS w/ EXTERIOR-GRADE ACRYLIC-LATEX
ENAMEL (TWO COATS).
10 SPECIALTIES
10.14 SIGNAGE
10.14.01 5'-3" x 2'-4 1/4" (APPX.) OUTDOOR-RATED, VIDEO-CAPABLE, DIGITAL LED MESSAGE CENTER. BASIS OF DESIGN: INFINITY-SMD
6.667mm PIXEL MATRIX, 8,000 NIT BRIGHTNESS DISPLAY BY OPTEC
DISPLAYS, INC. COORDINATE VENTILATION, ANCHORAGE, AND
CLOSURE PANELS w/ MANUFACTURER.
10.14.02 REINSTALL "POLICE" LETTERING. FINAL HEIGHT TO BE CONFIRMED w/
ARCHITECT. PATCH ABANDONED ANCHOR HOLES TO MATCH
MASONRY; BOTH SIDES.
10.14.03 NEW SURFACE MOUNTED 1" CONDUIT; PAINTED. VERIFY SIZE FOR
EXISTING CIRCUIT WIRING.
SCALE: 1/2" = 1'-0"2 SIGNAGE DETAILS
1 SITE PLAN
SCALE: 1" = 30'
SC
O
TT
O
. G
RA
H A
M A
IA
, L
EE
D
A P
BD
+C
Sc ot tG
M G
-A rc hi te ct
B
2 3
C
D
1 2 3
4 5 6
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
Entech Engineering - Printed: May. 11, 2026 H:\0004644.029\04-CAD\SheetFiles\New Work\A-106.dwgLa st
E di te d by : m hi es te r
/1
1/
BI
D
D
IN
G C
AD
TO
W
N
SH
IP
O
F
SP
R
IN
G
TO
W N
SH
IP
O F
SP
R
IN
G
, B
ER
KS
C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
SI
TE
C
IV
IL
IM
PR
O
VE
M
EN
TS
A N
D B
U
IL
D
IN
G S
AF
ET
Y U
PG
R
AD
ES
A-106
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
DRAWING NO.
4644.029
CAD
CAD
MAH
AS NOTED
FL
O
O R
P
LA
N , W
AT
ER
PR
O
O
FI
N G
S
EC
TI
O
N S, D
ET
AI
LS
A N
D N
O
TE
S
AR
C H
IT
EC
TU
R
AL
SCALE:1 1/8" = 1'-0"
BASEMENT FLOOR PLAN
8' 16'4'0
GENERAL SHEET NOTES
1. REFER TO G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES, DRAWING CONVENTIONS AND CODE SUMMARY.
2. REFER TO AND COORDINATE WITH PLUMBING, ELECTRICAL, AND
MECHANICAL DRAWINGS FOR ADDITIONAL WORK REQUIREMENTS.
GENERAL ARCHITECTURAL
NOTES
1. IT IS RECOMMENDED THE CONTRACTOR VISIT THE PROJECT SITE
PRIOR TO BIDDING TO BECOME FAMILIAR WITH THE BUILDING
STRUCTURE AND EXISTING CONDITIONS.
2. CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT
AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES
OF EVERY DESCRIPTION AS MAY BE NECESSARY TO COMPLETE THE
SCOPE OF WORK DEFINED BY THE DRAWINGS AND IN THE
SPECIFICATIONS FOR ALL WORK.
3. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE
IBC, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL
AND SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
4. CONTRACTOR SHALL RECONSTRUCT, REPAIR, OR REPLACE EXISTING
BUILDING CONSTRUCTION THAT IS DISTURBED ABOVE, BELOW, OR
AROUND THE PROJECT AREAS OF WORK. ALL WORK SHALL MATCH
EXISTING.
5. CONTRACTOR TO LEGALLY DISPOSE OF ALL REMOVED ITEMS AND
MATERIALS UNLESS INDICATED FOR REINSTALLATION.
6. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS.
7. DIMENSIONS ARE AT THE CENTERLINE OF WALL UNLESS OTHERWISE
NOTED.
ARCHITECTURAL REPAIR /
MISC. NOTES
NEW WATERPROOFING /
FOUNDATION DRAINAGE NOTES
1. EXCAVATE AROUND BUILDING FOUNDATION AS INDICATED TO EXPOSE
EXISTING FOUNDATION WALL AND EXISTING WATERPROOFING
CONDITIONS. PROTECT ADJACENT STRUCTURES, UTILITIES, AND EXISTING
IMPROVEMENTS DURING EXCAVATION.
2. REMOVE SOIL AND DEBRIS FROM FOUNDATION SURFACE. PREPARE
SUBSTRATE TO RECEIVE NEW WATERPROOFING SYSTEM. REMOVE SHARP
PROTRUSIONS THAT MAY DAMAGE MEMBRANE.
3. PROVIDE NEW EXTERIOR FOUNDATION WATERPROOFING SYSTEM AT
EXCAVATED AREAS. WATERPROOFING SHALL BE A CONTINUOUS SYSTEM
FROM TOP TERMINATION TO ABOVE THE FOUNDATION DRAIN ZONE.
4. PROVIDE NEW ROLLED SHEET WATERPROOFING MEMBRANE (MINIMUM
36-INCH WIDE MEMBRANE PREFERRED) INSTALLED PER MANUFACTURER
REQUIREMENTS. LAP, SEAL, AND DETAIL ALL SEAMS, CORNERS, AND
TRANSITIONS TO MAINTAIN A CONTINUOUS WATERPROOF BARRIER.
5. PROVIDE COLD FLUID-APPLIED WATERPROOFING AT TRANSITIONS,
IRREGULAR SUBSTRATES, PENETRATIONS, AND WHERE REQUIRED TO
MAINTAIN SYSTEM CONTINUITY.
6. INSTALL DELTA®-DRAIN (OR APPROVED EQUAL FOUNDATION DRAINAGE
COMPOSITE MEMBRANE) OVER NEW WATERPROOFING SYSTEM. INSTALL
WITH GEOTEXTILE FACING SOIL SIDE. PROVIDE CONTINUOUS
INSTALLATION AND PROTECT WATERPROOFING DURING BACKFILL
OPERATIONS.
7. TERMINATE DELTA®-DRAIN AT TOP EDGE WITH DELTA®-MOLD STRIP (OR
APPROVED EQUAL TERMINATION STRIP). TUCK FILTER FABRIC BEHIND
FLAT TAB TO PREVENT SOIL FINES FROM ENTERING DRAINAGE GAP.
8. PROVIDE NEW TOP TERMINATION FLASHING/COUNTERFLASHING AND
SEALANT TO PROTECT WATERPROOFING SYSTEM TERMINATION AND TIE
INTO EXISTING BRICK VENEER. DO NOT BLOCK OR COVER EXISTING
WEEPHOLES.
9. INSTALL NEW UPPER FOUNDATION DRAIN AND CONNECT TO SITE
DRAINAGE SYSTEM AS INDICATED. COORDINATE WITH DRAINAGE STONE
AND GEOTEXTILE FABRIC.
10. INSTALL NEW RAIN LEADER UNDERGROUND PIPING WITHIN EXCAVATED
ZONE AND COORDINATE WITH FOUNDATION DRAINAGE SYSTEM AND
WATERPROOFING INSTALLATION.
11. BACKFILL EXCAVATED AREA WITH CLEAN, FREE-DRAINING STONE
WRAPPED WITH GEOTEXTILE FABRIC AS INDICATED TO PROVIDE
FILTRATION AND DRAINAGE ALONG FOUNDATION WALL.
12. CONTRACTOR SHALL COORDINATE WATERPROOFING, DELTA®-DRAIN,
FOUNDATION DRAIN, AND BACKFILL SEQUENCING. DO NOT BACKFILL
UNTIL WATERPROOFING SYSTEM HAS BEEN INSPECTED AND ACCEPTED.
13. PROVIDE JOINT SEALANT AND TERMINATION SEALANT COMPATIBLE WITH
WATERPROOFING MEMBRANE, METAL FLASHING, AND MASONRY
SUBSTRATES TO MAINTAIN A CONTINUOUS WEATHER- AND WATER-TIGHT
SYSTEM.
SHEET KEYNOTES
1. REMOVE AND REPLACE PLASTER AND LATH IN ALL AFFECTED AREAS.
INSPECT EXISTING INSULATION AND REMOVE AND REPLACE ANY
INSULATION IMPACTED BY MOISTURE. ALL CMU SUBSTRATE TO DRY
COMPLETELY PRIOR TO REPAIRS. INSTALL NEW INSULATION WHERE
REQUIRED AND RECONSTRUCT WALL ASSEMBLY USING
CORRISION-RESISTANT METAL LATH AND CEMENTIOUS PLASTER FINISH.
2. CONTRACTOR TO PROVIDE DRYWALL CEILING.
3. CONTRACTOR TO REPLACE EXISTING LIGHT. SEE ELECTRICAL PLANS
4. COORDINATE WORK WITH MECHANICAL AND ELECTRICAL DRAWINGS
AND SPECIFICATIONS. NEW LIGHT FIXTURES AND HVAC SUPPLY AND
RETURN DIFFUSERS SHALL REMAIN IN EXISTING LOCATIONS WITHIN THE
ACOUSTICAL CEILING.
5. PREPARE, PRIME AND PAINT EXISTING RAILING, THEN REINSTALL.
6. INSTALL NEW ALUMINUM RAILING SIMILAR IN DESIGN, PROFILE AND
FINISH TO MATCH EXISTING ALUMINUM RAILING ON SITE. COORDINATE
WITH OWNER PRIOR TO FABRICATION.
E A-106
SCALE:E 1/4" = 1'-0"
STAIRWELL SECTION
4' 8'2'0
WALL A
WALL C
W
AL
L B
F A-106G
A-106
SCALE:F 1/4" = 1'-0"
WATERPROOFING SECTION
HVAC VAULT
4' 8'2'0
DELTA DRAIN SYSTEM
AND WATERPROOFING
MEMBRANE
COLD JOINT PROTECTION
(VERTICAL AND
HORIZONTAL JOINTS)
SCALE:G 1/4" = 1'-0"
WATERPROOFING ELEVATION
HVAC VAULT
4' 8'2'0
DELTA DRAIN SYSTEM
AND WATERPROOFING
MEMBRANE
COLD JOINT TAPE FLASHING
(VERTICAL AND
HORIZONTAL JOINTS)
DELTA WATERPROOFING MEMBRANE
COLD JOINT
TAPE FLASHING
(VERTICAL AND
HORIZONTAL JOINTS)
EXISTING VENTS
1. PATCH, REPAIR AND REPOINT DETERIORATED BRICK AND MORTAR TO
MATCH ORIGINAL COLOR TEXTURE AND FINISH
2. REINSTALL EXISTING HANDRAIL.
3. PROVIDE FLASHING, COUNTERFLASHING AND CAULKING.
4. PREPARE AND PAINT EXISTING EXTERIOR REAR STOOP DOOR AND
WOOD SURROUND. MATCH EXISTING PAINT COLOR.
5. PREPARE, PAINT AND REINSTALL REAR STOOP ENTRANCE RAILING.
MATCH EXISTING PAINT COLOR.
6. PROVIDE METAL FRY REGLET, FLASHING AND CAULKING WHERE THE
BRICK FACE MEETS THE NEW CONCRETE SIDEWALK. DO NOT COVER
EXISTING WEEPHOLES.
384'-0" MIN.
REPLACE EXISTING
ACOUSTIC CEILING (ATC)
TILE IF DAMAGED BY WATER
NEW 2'x4' SUSPENDED
ACOUSTIC CEILING (ATC) SYSTEM
8'-0" (TYP.)
RECORDS
ROOM
2' -0
M
IN
2' -0
M
IN
FLASHING/COUNTERFLASHING
6' -0
" D
EE
P (W
ES
T
SI
D
E) 4'
-0 " D
EE
P
(A
LL
O
TH
ER
L
O C
AT
IO
N S
U N
LE
SS
N O
TE
D
O
TH
ER
W
IS
E)
DELTA DRAIN TO OVERLAP
FOUNDATION DRAIN
EXISTING
WATERPROOFING
DELTA DRAIN SYSTEM
EX
IS
TI
N
G F
O U
N D
AT
IO
N
FILLER
SEALANT
FLASHING / COUNTER FLASHING
3" 1'
-0
SCALE:A NONE
WATERPROOFING DETAIL
6' -0
" D
EE
P (W
ES
T
SI
D
E) 4'
-0 " D
EE
P
(A
LL
O
TH
ER
L
O C
AT
IO
N S
U N
LE
SS
N O
TE
D
O
TH
ER
W
IS
E)
DELTA DRAIN TO OVERLAP
FOUNDATION DRAIN
DELTA DRAIN SYSTEM
FILLER SEALANT
FLASHING /
COUNTER FLASING
EXISTING
WATERPROOFING
WATERPROOFING
MEMBRANE
WATERPROOFING
MEMBRANE
PROPOSED
CONCRETE SIDEWALK
SEALANT
EXPANSION JOINT MATERIAL
SCALE:B NONE
WATERPROOFING DETAIL
6' -0
" D
EE
P (W
ES
T
SI
D
E) 4'
-0 " D
EE
P
(A
LL
O
TH
ER
L
O C
AT
IO
N S
U N
LE
SS
N O
TE
D
O
TH
ER
W
IS
E)
DELTA DRAIN TO OVERLAP
FOUNDATION DRAIN
FLASHING /
COUNTER FLASING
SEALANT
EXPANSION JOINT MATERIAL
PROPOSED CONCRETE CURB
FLASHING /
COUNTER FLASING
SEALANT
FILLER
FILLER
SEALANT AT
EXISTING JOINT
DELTA DRAIN SYSTEM
WATERPROOFING
MEMBRANE
EX
IS
TI
N
G F
O U
N D
AT
IO
N
EX
IS
TI
N
G F
O U
N D
AT
IO
N
EX
IS
TI
N
G F
O U
N D
AT
IO
N
SCALE:C NONE
WATERPROOFING DETAIL
VERIFY EXISTING ADA RAMP FOUNDATION LOCATION.
DO NOT UNDERMINE OR DISTURB RAMP FOUNDATION
DURING TRENCHING FOR NEW FOUNDATION DRAIN.
PROVIDE TEMPORARY SUPPORT AS REQUIRED.
EXISTING
WATERPROOFING
NOTE:
SEE DRAWING C-403 FOR BACKFILL AND RESTORATION DETAILS
NOTE:
SEE DRAWING C-403 FOR BACKFILL AND RESTORATION DETAILS
NOTE:
SEE DRAWING C-403 FOR BACKFILL AND RESTORATION DETAILS
D A-106
SCALE:D 1/4" = 1'-0"
ELEVATOR SHAFT SECTION
4' 8'2'0
1. PROVIDE SPECIALTY EPOXY AND/OR POLYURETHANE INJECTION
AT THE ELEVATOR SHAFT FOUNDATION WALLS AND PIT SLAB AS
REQUIRED TO MITIGATE GROUNDWATER INFILTRATION AND SEAL
SUBSURFACE VOIDS.
2. INJECTION WORK SHALL BE PERFORMED ONLY AT THE ELEVATOR
PIT/SHAFT AREA AND BY A QUALIFIED SPECIALTY INJECTION
SUBCONTRACTOR.
3. ENGINEER/ARCHITECT DOES NOT DESIGN SPECIALTY INJECTION
SYSTEMS. CONTRACTOR SHALL RETAIN QUALIFIED SPECIALTY
PERSONNEL TO DETERMINE APPROPRIATE MATERIALS,
INJECTION LAYOUT, PRESSURES, SEQUENCING, AND REACTION
CONTROL BASED ON FIELD CONDITIONS.
4. INJECTION MAY INCLUDE PIT SIDEWALLS, SLAB, COLD JOINTS,
CRACKS, AND SEALING AT THE PISTON SLEEVE INTERFACE, AS
REQUIRED.
5. CONTRACTOR SHALL CONTROL INJECTION PRESSURES AND
EXPANSION TO PREVENT SLAB MOVEMENT OR DAMAGE TO
ELEVATOR COMPONENTS.
6. CONTRACTOR SHALL SUBMIT PRODUCT DATA AND A SPECIALTY
INJECTION PLAN FOR ENGINEER REVIEW FOR GENERAL
CONFORMANCE ONLY. CONTRACTOR REMAINS SOLELY
RESPONSIBLE FOR SYSTEM PERFORMANCE AND
MEANS/METHODS.
7. PROVIDE MANUFACTURER'S STANDARD WARRANTY AND
CORRECT ANY DAMAGE OR LEAKAGE RESULTING FROM
DEFECTIVE INSTALLATION.
ELEVATOR SHAFT - EPOXY
INJECTION NOTES
RAIN LEADER
RAIN LEADER
RAIN LEADER
INJECTION
POINT
INJECTION
POINT
INJECTION
POINT
INJECTION
POINT
NOTE:
SEE THIS SHEET FOR EPOXY INJECTION NOTES FOR
ELEVATOR SHAFT REPAIR
4" M
IN
8" M
IN
6" PENNDOT 2A
AGGREGATE COMPACTED
6" PENNDOT 2A
AGGREGATE COMPACTED
8" M
IN
APPLY CONTINUOUS SEALANT
BETWEEN FLASHING AND ASPHALT
PROVIDE TERM BAR
IF RECOMMENDED BY
MEMBRANE MANUFACTURER
PROVIDE TERM BAR
IF RECOMMENDED BY
MEMBRANE MANUFACTURER
CROSS SLOPE
1% MIN. / 2% MAX.
INJECTION
POINT (TYP.)
SC
O
TT
O
. G
RA
H A
M A
IA
, L
EE
D
A P
BD
+C
Sc ot tG
M G
-A rc hi te ct
SECTION 001000 - GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE AND
LOCAL BUILDING CODES AND ALL OTHER GOVERNING AGENCIES AND
REGULATIONS.
2. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN
THE FIELD PRIOR TO COMMENCEMENT OF THE WORK. VERIFY LAYOUT
IN RELATION TO PROPERTY, BENCHMARKS, AND OTHER FIXED
CONDITIONS. REPORT DISCREPANCIES TO THE ARCHITECT
IMMEDIATELY UPON DISCOVERY.
3. NOTIFY ARCHITECT OF DISCREPANCIES REGARDING THE CONTRACT
DOCUMENTS OR DESIGN INTENT IMMEDIATELY UPON DISCOVERY.
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK OR RELATED
WORK.
4. CONTRACTOR SHALL OBTAIN ALL REQUIRED TRADE PERMITS, AND
LICENSES.
5. CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS FROM THE
SITE DURING COURSE OF PROJECT, AND DISPOSE OF LEGALLY
OFF-SITE MAXIMIZING RECYCLING. PROVIDE DAILY CLEANING AND
FINAL CLEANING.
6. CONTRACTOR SHALL PERFORM ALL CUTTING, PATCHING, AND
PROTECTION REQUIRED TO PERFORM THE WORK INDICATED ON THE
CONTRACT DOCUMENTS.
7. CONTRACTOR SHALL PROVIDE ALL INSPECTIONS AND TESTS
REQUIRED BY STATE AND LOCAL AUTHORITIES INCLUDING BUT NOT
LIMITED TO MECHANICAL, PLUMBING, AND ELECTRICAL WORK. REFER
TO INDIVIDUAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
TESTING REQUIREMENTS.
8. ALL DIMENSIONS ARE EITHER TO FACE OF MASONRY OR THE CENTER
OF FRAMING STUD, UNLESS NOTED OTHERWISE. DRAWINGS ARE NOT
TO BE SCALED.
9. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURER ’ S
INSTRUCTIONS AND RECOMMENDATIONS, UNLESS SPECIFICALLY
OTHERWISE INDICATED, OR WHERE LOCAL CODES AND REGULATIONS
TAKE PRECEDENCE.
10. CONTRACTOR SHALL PROVIDE SUPERVISION WHILE ANY
SUBCONTRACTORS OR WORKERS ARE ON THE JOB SITE AND SHALL
SUPERVISE AND DIRECT ALL WORK.
11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,
PROCEDURES, SITE SAFETY, AND COORDINATING THE WORK OF ALL
TRADES UNDER THIS CONTRACT.
12. NO PRODUCTS CONTAINING ASBESTOS OR OTHER HAZARDOUS
MATERIALS SHALL BE INSTALLED ON THIS PROJECT OR USED DURING
THE CONSTRUCTION OF THE PROJECT. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO CERTIFY TO THE OWNER
THAT THIS REQUIREMENT HAS BEEN MET. SUBCONTRACTORS SHALL
VERIFY TO THE CONTRACTOR THAT NO ASBESTOS OR OTHER
HAZARDOUS PRODUCTS ARE USED IN THEIR WORK.
13. FURNISH AND INSTALL TEMPORARY PROTECTION AND BARRICADES.
THE BUILDING WILL NOT BE POPULATED IN NORMAL OPERATION
DURING ALL CONSTRUCTION WORK. PROVIDE DUST PARTITIONS
BETWEEN WORK AREAS AND OCCUPIED PORTIONS OF BUILDING.
14. FURNISH AND INSTALL TEMPORARY UTILITIES, TEMPORARY OFFICE,
TEMPORARY TOILETS, AND OTHER TEMPORARY FACILITIES AS
APPROPRIATE.
15. CONDUCT CONSTRUCTION PROGRESS MEETINGS WITH OWNER AND
DESIGN PROFESSIONAL AT AGREED UPON TIME AND DATE, BI-WEEKLY
DURING DURATION OF CONSTRUCTION. ARCHITECT TO PROVIDE
MINUTES OF THESE MEETINGS FOR REVIEW AT NEXT MEETING.
16. DELEGATED DESIGN: WHEN PROFESSIONAL DESIGN SERVICES OR
CERTIFICATIONS RELATED TO SYSTEMS, MATERIALS, OR EQUIPMENT
ARE REQUIRED BY THESE DOCUMENTS, THE ARCHITECT/ENGINEER
WILL SPECIFY PERFORMANCE AND DESIGN CRITERIA THAT SUCH
SERVICES MUST SATISFY. THE CONTRACTOR SHALL CAUSE SUCH
SERVICES AND CERTIFICATIONS TO BE PROVIDED BY A PROPERLY
LICENSED DESIGN PROFESSIONAL, WHOSE SIGNATURE AND SEAL
SHALL APPEAR ON ALL DRAWINGS, CALCULATIONS, SHOP DRAWINGS
AND OTHER RELATED SUBMITTALS. THE OWNER AND
ARCHITECT/ENGINEER SHALL BE ENTITLED TO RELY UPON THE
ACCURACY AND COMPLETENESS OF THOSE DELEGATED SERVICES.
THE ARCHITECT/ENGINEER WILL REVIEW SUBMITTALS ONLY FOR THE
LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE
PERFORMANCE AND DESIGN CRITERIA.
17. INFORMATION REGARDING EXISTING BUILDING CONDITIONS AND
FINISHED FLOOR ELEVATIONS WERE OBTAINED FROM DRAWINGS
PROVIDED BY OWNER. NOTIFY ARCHITECT OF DISCREPANCIES
REGARDING THE CONTRACT DOCUMENTS OR DESIGN INTENT
IMMEDIATELY UPON DISCOVERY. CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING CLARIFICATION PRIOR TO PROCEEDING
WITH THE WORK OR RELATED WORK.
18. THE CONTRACTOR SHALL PROTECT ADJACENT PROPERTIES AND
ADJACENT BUILDING SITE FEATURES BEYOND THE GENERAL
BOUNDARY OF CONSTRUCTION OPERATIONS, AND
CURBING/PAVEMENT AND OTHER SITE FEATURES WITHIN GENERAL
BOUNDARY OF CONSTRUCTION FROM DAMAGE AND DEBRIS.
IMMEDIATELY MAKE REPAIRS OR CORRECTIONS TO RETURN THE
DAMAGED ITEMS TO THEIR PREVIOUS STATE. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR REPLACING ALL ITEMS DAMAGED
DURING CONSTRUCTION.
19. COORDINATE IN FIELD WITH ARCHITECT ALL LOCATIONS FOR
MECHANICAL SYSTEM TERMINAL DEVICES (REGISTERS, GRILLES,
ETC.), PLUMBING DEVICES AND FIXTURES, AND LIGHT FIXTURES AND
ELECTRICAL DEVICES THAT ARE NOT DIMENSIONALLY LOCATED IN
ARCHITECTURAL DRAWINGS.
20. STUD WORK AND BLOCKING IS SHOWN SCHEMATICALLY IN DRAWINGS.
THE CONTRACTOR SHALL PROVIDE STUD WORK AND BLOCKING AS
REQUIRED BY CONDITIONS AND/OR BY THE ENGINEER, ARCHITECT,
AND MANUFACTURER TO MAKE THE INSTALLATION COMPLETE.
21. PROVIDE SEPARATION LAYERS BETWEEN ALL DISSIMILAR MATERIALS
AND BETWEEN METAL AND MASONRY SURFACES. DO NOT INSTALL
ALUMINUM COMPONENTS IN FRESH MORTAR.
22. UNLESS NOTED OTHERWISE, ALL DUCTWORK, PIPING, WIRING AND
CONDUITS, WHETHER SHOWN IN ARCHITECTURAL DRAWINGS OR NOT,
ARE TO BE CONCEALED WITHIN NEW FINISHES.
23. REFERENCE MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS
FOR LOCATIONS OF DUCT WORK, EQUIPMENT AND PLUMBING LINES,
WHICH ARE LOCATED WITHIN CAVITIES. COORDINATE IN FIELD WITH
ARCHITECT ALL LOCATIONS FOR MECHANICAL SYSTEM TERMINAL
DEVICES (REGISTERS, GRILLES, ETC.), PLUMBING DEVICES AND
FIXTURES, AND LIGHT FIXTURES AND ELECTRICAL DEVICES THAT ARE
NOT DIMENSIONALLY LOCATED IN ARCHITECTURAL DRAWINGS. NOTE
THAT THERE ARE MEP DRAWINGS THAT ARE PART OF ARCHITECT'S
DOCUMENTS.
24. WHERE GYPSUM WALL BOARD FINISHES ARE INTERRUPTED BY
STRUCTURAL MEMBERS OR DUCTS/PIPES/CONDUITS, SCRIBE GYPSUM
WALL BOARD TIGHT TO STRUCTURE AND SEAL JOINTS TO PROVIDE A
SMOOTH UNIFORM FINISH.
25. COORDINATION
A. COORDINATE CONSTRUCTION OPERATIONS INCLUDED IN THE
VARIOUS TRADES OF THE WORK TO ASSURE EFFICIENT AND
ORDERLY INSTALLATION OF EACH PART OF THE WORK.
COORDINATE CONSTRUCTION OPERATIONS OF DIFFERENT TRADES
THAT DEPEND ON EACH OTHER FOR PROPER INSTALLATION
SEQUENCE, CONNECTION, AND OPERATION.
B. SCHEDULE CONSTRUCTION AND COORDINATE OPERATIONS IN THE
SEQUENCE REQUIRED TO OBTAIN THE BEST RESULTS WHERE
INSTALLATION OF ONE PART OF THE WORK DEPENDS ON THE
INSTALLATION OF OTHER COMPONENTS, BEFORE OR AFTER ITS
OWN INSTALLATION.
C. MAKE PROVISIONS TO ACCOMMODATE ITEMS SCHEDULED FOR
LATER INSTALLATION.
D. INSPECTION OF CONDITIONS: REQUIRE THE INSTALLER OF EACH
MAJOR COMPONENT TO INSPECT BOTH THE SUBSTRATE AND
CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. DO
NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED IN AN ACCEPTABLE MANNER.
E. COORDINATE TEMPORARY ENCLOSURES WITH REQUIRED
INSPECTIONS AND TESTS TO MINIMIZE THE NECESSITY OF
UNCOVERING COMPLETED CONSTRUCTION FOR THAT PURPOSE.
26. CUTTING AND PATCHING
A. EXAMINE SURFACES TO BE CUT AND PATCHED AND CONDITIONS IN
WHICH CUTTING AND PATCHING IS TO BE PERFORMED BEFORE
CUTTING. IF UNSAFE OR UNSATISFACTORY CONDITIONS ARE
ENCOUNTERED, TAKE CORRECTIVE ACTION BEFORE PROCEEDING.
B. CUT EXISTING CONSTRUCTION USING METHODS TO MINIMIZE AND
LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING
CONSTRUCTION.
C. RESTORE FINISHES OF PATCHED AREAS AND EXTEND FINISH
RESTORATION INTO RETAINED ADJOINING CONSTRUCTION IN A
MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND
REFINISHING.
D. PATCHING OF FIRE RATED ASSEMBLIES SHALL BE PERFORMED
SUCH THAT THE ASSEMBLY RETAINS ITS FIRE RATING.
27. SUBMITTALS
A. COORDINATE SUBMITTAL PREPARATION WITH CONSTRUCTION,
FABRICATION, AND OTHER SUBMITTALS, AND ACTIVITIES THAT
REQUIRE SEQUENTIAL OPERATIONS. TRANSMIT IN ADVANCE OF
CONSTRUCTION OPERATIONS TO AVOID DELAY. SUBMITTALS SHALL
BE PROVIDED FOR ALL WORK OF THE PROJECT. CONTRACTOR
SHALL PROVIDE A SCHEDULE OF ALL SUBMITTALS BEFORE
COMMENCING CONSTRUCTION ACTIVITIES.
B. PROCESSING: ALLOW (14) CALENDAR DAYS FOR REVIEW. ALLOW
MORE TIME IF THE ARCHITECT MUST DELAY PROCESSING TO
PERMIT COORDINATION. THE ARCHITECT RESERVES THE RIGHT TO
WITHHOLD ACTION ON A SUBMITTAL REQUIRING COORDINATION
UNTIL RELATED SUBMITTALS ARE RECEIVED.
C. SHOP DRAWINGS: SUBMIT NEWLY PREPARED INFORMATION DRAWN
TO SCALE. INDICATE DEVIATIONS FROM THE CONTRACT
DOCUMENTS. DO NOT REPRODUCE THE CONTRACT DOCUMENTS
OR COPY STANDARD INFORMATION. SUBMIT ONE CORRECTABLE,
REPRODUCIBLE PRINT AND ONE BLUE OR BLACK LINE PRINT ON
SHEETS AT LEAST 8-1/2 INCHES BY 11 INCHES BUT NO LARGER
THAN 30 INCHES BY 42 INCHES. THE ARCHITECT WILL RETURN THE
REPRODUCIBLE PRINT.
D. SAMPLES: SUBMIT FULL-SIZE SAMPLES CURED AND FINISHED AS
SPECIFIED, AND IDENTICAL WITH THE MATERIAL PROPOSED.
MOUNT THE SAMPLES TO FACILITATE REVIEW OF QUALITIES.
SUBMIT SAMPLES FOR REVIEW OF SIZE, KIND, COLOR, PATTERN,
AND TEXTURE, FOR A CHECK OF THESE CHARACTERISTICS, AND
FOR A COMPARISON OF THESE CHARACTERISTICS BETWEEN THE
FINAL SUBMITTAL AND THE ACTUAL COMPONENT AS DELIVERED
AND INSTALLED.
E. PRODUCT DATA: COLLECT PRODUCT DATA INTO A SINGLE
SUBMITTAL FOR EACH ELEMENT OF CONSTRUCTION. MARK EACH
COPY TO SHOW APPLICABLE CHOICES AND OPTIONS. WHERE
PRODUCT DATA INCLUDES INFORMATION ON SEVERAL PRODUCTS,
MARK COPIES TO INDICATE APPLICABLE INFORMATION. SUBMIT 4
COPIES. THE ARCHITECT WILL RETAIN ONE AND RETURN THE
OTHERS MARKED WITH ACTION TAKEN.
28. MATERIALS & EQUIPMENT
A. SOURCE LIMITATIONS: TO THE FULLEST EXTENT POSSIBLE.
PROVIDE PRODUCTS OF THE SAME KIND FROM A SINGLE SOURCE.
B. DELIVER, STORE AND HANDLE PRODUCTS ACCORDING TO THE
MANUFACTURER'S RECOMMENDATIONS, USING MEANS AND
METHODS THAT WILL PREVENT DAMAGE, DETERIORATION, AND
LOSS, INCLUDING THEFT. STORE PRODUCTS SUBJECT TO DAMAGE
BY THE ELEMENTS ABOVE GROUND, UNDER COVER IN A
WEATHERTIGHT ENCLOSURE, WITH VENTILATION ADEQUATE TO
PREVENT CONDENSATION. MAINTAIN TEMPERATURE AND HUMIDITY
WITHIN THE RANGE REQUIRED BY THE MANUFACTURER'S
INSTRUCTIONS.
C. PROVIDE DUST PROOF TEMPORARY ENCLOSURES AROUND
CONSTRUCTION OPERATIONS.
D. PROPRIETARY SPECIFICATION REQUIREMENTS: WHERE
SPECIFICATIONS NAME ONLY A SINGLE PRODUCT OR
MANUFACTURER, PROVIDE THE PRODUCT SPECIFIED. NO
SUBSTITUTIONS WILL BE PERMITTED.
E. SEMI-PROPRIETARY SPECIFICATION REQUIREMENTS: WHERE
SPECIFICATIONS NAME 2 OR MORE PRODUCTS OR
MANUFACTURERS, PROVIDE ONE OF THE PRODUCTS INDICATED.
NO SUBSTITUTIONS WILL BE PERMITTED.
F. DESCRIPTIVE SPECIFICATIONS REQUIREMENTS: WHERE
SPECIFICATION DESCRIBE A PRODUCT OR ASSEMBLY, LISTING
EXACT CHARACTERISTICS REQUIRED, WITH OR WITHOUT THE USE
OF A BRAND NAME PROVIDE A PRODUCT OR ASSEMBLY THAT
PROVIDES THE CHARACTERISTICS AND OTHERWISE COMPLIES
WITH THE CONTRACT REQUIREMENTS.
29. WARRANTIES
A. WARRANTY WORK AGAINST DEFECTIVE MATERIALS OR
WORKMANSHIP FOR A PERIOD OF THREE (3) YEARS FROM THE
DATE OF SUBSTANTIAL COMPLETION. REMEDY ANY AND ALL
DEFECTS IN THE WORK UPON WRITTEN NOTIFICATION FROM THE
OWNER. SUBMIT A WRITTEN WARRANTY TO THE OWNER THAT ALL
MATERIALS AND WORKMANSHIP SHALL BE FREE FROM DEFECTS
FOR A PERIOD OF THREE YEARS AFTER THE DATE OF SUBSTANTIAL
COMPLETION. THERE WILL BE NO ADDITIONAL COST TO REPAIR OR
REPLACE ANY SUCH WORK THAT IS FOUND TO BE DEFECTIVE
WITHIN THE WARRANTY PERIOD.
END OF SECTION 001000
ARCHITECTURAL SPECIFICATIONS
SP
EC
IF
IC
AT
IO
N S
- 1
AR
C H
IT
EC
TU
R
AL
A
B
2 3
C
D
1 2 3
4 5 6
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
Entech Engineering - Printed: May. 11, 2026 H:\0004644.029\04-CAD\SheetFiles\New Work\A-701.dwgLa st
E di te d by : m hi es te r
/1
1/
BI
D
D
IN
G C
AD
TO
W
N
SH
IP
O
F
SP
R
IN
G
TO
W N
SH
IP
O F
SP
R
IN
G
, B
ER
KS
C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
SI
TE
C
IV
IL
IM
PR
O
VE
M
EN
TS
A N
D B
U
IL
D
IN
G S
AF
ET
Y U
PG
R
AD
ES
A-701
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
DRAWING NO.
4644.029
CAD
CAD
MAH
AS NOTED
SECTION 061000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. THIS SECTION INCLUDES THE FOLLOWING:
1. FRAMING WITH DIMENSION LUMBER.
2. WOOD BLOCKING, CANTS, AND NAILERS.
1.2 DEFINITIONS
A. EXPOSED FRAMING: FRAMING NOT CONCEALED BY OTHER
CONSTRUCTION.
B. DIMENSION LUMBER: LUMBER OF 2 INCHES NOMINAL OR GREATER BUT
LESS THAN 5 INCHES NOMINAL IN LEAST DIMENSION.
C. LUMBER GRADING AGENCIES, AND THE ABBREVIATIONS USED TO
REFERENCE THEM, INCLUDE THE FOLLOWING:
1. NELMA: NORTHEASTERN LUMBER MANUFACTURERS' ASSOCIATION.
2. NLGA: NATIONAL LUMBER GRADES AUTHORITY.
3. SPIB: THE SOUTHERN PINE INSPECTION BUREAU.
4. WCLIB: WEST COAST LUMBER INSPECTION BUREAU.
5. WWPA: WESTERN WOOD PRODUCTS ASSOCIATION.
1.3 SUBMITTALS
A. PRODUCT DATA: FOR EACH TYPE OF PROCESS AND
FACTORY-FABRICATED PRODUCT. INDICATE COMPONENT MATERIALS
AND DIMENSIONS AND INCLUDE CONSTRUCTION AND APPLICATION
DETAILS.
B. RESEARCH/EVALUATION REPORTS: FOR THE FOLLOWING, SHOWING
COMPLIANCE WITH BUILDING CODE IN EFFECT FOR PROJECT:
1. WOOD-PRESERVATIVE-TREATED WOOD.
1.4 DELIVERY, STORAGE, AND HANDLING
A. STACK LUMBER FLAT WITH SPACERS BETWEEN EACH BUNDLE TO
PROVIDE AIR CIRCULATION. PROVIDE FOR AIR CIRCULATION AROUND
STACKS AND UNDER COVERINGS.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. LUMBER: DOC PS 20 AND APPLICABLE RULES OF GRADING AGENCIES
INDICATED. IF NO GRADING AGENCY IS INDICATED, PROVIDE LUMBER
THAT COMPLIES WITH THE APPLICABLE RULES OF ANY RULES-WRITING
AGENCY CERTIFIED BY THE ALSC BOARD OF REVIEW. PROVIDE LUMBER
GRADED BY AN AGENCY CERTIFIED BY THE ALSC BOARD OF REVIEW TO
INSPECT AND GRADE LUMBER UNDER THE RULES INDICATED.
1. FACTORY MARK EACH PIECE OF LUMBER WITH GRADE STAMP OF
GRADING AGENCY.
2. WHERE NOMINAL SIZES ARE INDICATED, PROVIDE ACTUAL SIZES
REQUIRED BY DOC PS 20 FOR MOISTURE CONTENT SPECIFIED.
WHERE ACTUAL SIZES ARE INDICATED, THEY ARE MINIMUM DRESSED
SIZES FOR DRY LUMBER.
3. PROVIDE DRESSED LUMBER, S4S, UNLESS OTHERWISE INDICATED.
B. MAXIMUM MOISTURE CONTENT OF LUMBER: 19 PERCENT UNLESS
OTHERWISE INDICATED.
2.2 WOOD-PRESERVATIVE-TREATED LUMBER
A. PRESERVATIVE TREATMENT BY PRESSURE PROCESS: AWPA C2, EXCEPT
THAT LUMBER THAT IS NOT IN CONTACT WITH THE GROUND AND IS
CONTINUOUSLY PROTECTED FROM LIQUID WATER MAY BE TREATED
ACCORDING TO AWPA C31 WITH INORGANIC BORON (SBX).
1. PRESERVATIVE CHEMICALS: ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION AND CONTAINING NO ARSENIC, CHROMIUM, OR
AMMONIA.
B. KILN-DRY LUMBER AFTER TREATMENT TO A MAXIMUM MOISTURE
CONTENT OF 19 PERCENT. DO NOT USE MATERIAL THAT IS WARPED OR
DOES NOT COMPLY WITH REQUIREMENTS FOR UNTREATED MATERIAL.
C. MARK LUMBER WITH TREATMENT QUALITY MARK OF AN INSPECTION
AGENCY APPROVED BY THE ALSC BOARD OF REVIEW.
D. APPLICATION: TREAT ALL ROUGH LUMBER PRODUCTS UNLESS
OTHERWISE INDICATED.
2.3 DIMENSION LUMBER FRAMING
A. MAXIMUM MOISTURE CONTENT: 19 PERCENT.
B. NON-LOAD-BEARING INTERIOR PARTITIONS: CONSTRUCTION OR
STANDARD OF THE FOLLOWING SPECIES:
1. SOUTHERN PINE - SPIB.
2.4 MISCELLANEOUS LUMBER
A. GENERAL: PROVIDE MISCELLANEOUS LUMBER INDICATED AND LUMBER
FOR SUPPORT OR ATTACHMENT OF OTHER CONSTRUCTION, INCLUDING
THE FOLLOWING:
1. BLOCKING.
2. NAILERS.
B. FOR ITEMS OF DIMENSION LUMBER SIZE, PROVIDE CONSTRUCTION OR
NO. 2 GRADE LUMBER WITH 19 PERCENT MAXIMUM MOISTURE CONTENT
AND ANY OF THE FOLLOWING SPECIES:
1. MIXED SOUTHERN PINE; SPIB.
C. FOR BLOCKING AND NAILERS USED FOR ATTACHMENT OF OTHER
CONSTRUCTION, SELECT AND CUT LUMBER TO ELIMINATE KNOTS AND
OTHER DEFECTS THAT WILL INTERFERE WITH ATTACHMENT OF OTHER
WORK.
2.5 FASTENERS
A. GENERAL: PROVIDE FASTENERS OF SIZE AND TYPE INDICATED THAT
COMPLY WITH REQUIREMENTS SPECIFIED IN THIS ARTICLE FOR MATERIAL
AND MANUFACTURE.
1. WHERE ROUGH CARPENTRY IS EXPOSED TO WEATHER, IN GROUND
CONTACT, PRESSURE-PRESERVATIVE TREATED, OR IN AREA OF HIGH
RELATIVE HUMIDITY, PROVIDE FASTENERS WITH HOT-DIP ZINC
COATING COMPLYING WITH ASTM A 153/A 153M.
B. NAILS, BRADS, AND STAPLES: ASTM F 1667.
C. POWER-DRIVEN FASTENERS: NES NER-272.
D. WOOD SCREWS: ASME B18.6.1.
E. LAG BOLTS: ASME B18.2.1.
F. BOLTS: STEEL BOLTS COMPLYING WITH ASTM A 307, GRADE A; WITH
ASTM A 563 HEX NUTS AND, WHERE INDICATED, FLAT WASHERS. HOT
DIPPED GALVANIZED BOLTS.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. SET ROUGH CARPENTRY TO REQUIRED LEVELS AND LINES, WITH
MEMBERS PLUMB, TRUE TO LINE, CUT, AND FITTED. FIT ROUGH
CARPENTRY TO OTHER CONSTRUCTION; SCRIBE AND COPE AS NEEDED
FOR ACCURATE FIT. LOCATE FURRING, NAILERS, BLOCKING,
GROUNDS, AND SIMILAR SUPPORTS TO COMPLY WITH REQUIREMENTS
FOR ATTACHING OTHER CONSTRUCTION.
B. FRAMING STANDARD: COMPLY WITH AF&PA'S "DETAILS FOR
CONVENTIONAL WOOD FRAME CONSTRUCTION," UNLESS OTHERWISE
INDICATED.
C. PROVIDE BLOCKING AND FRAMING AS INDICATED AND AS REQUIRED TO
SUPPORT FACING MATERIALS, FIXTURES, SPECIALTY ITEMS, AND TRIM.
D. PROVIDE FIRE BLOCKING IN FURRED SPACES, STUD SPACES, AND OTHER
CONCEALED CAVITIES AS INDICATED AND AS FOLLOWS:
1. FIRE BLOCK CONCEALED SPACES OF WOOD-FRAMED WALLS AND
PARTITIONS AT EACH FLOOR LEVEL, AT CEILING LINE OF TOP STORY,
AND AT NOT MORE THAN 120 INCHES O.C. WHERE FIRE BLOCKING IS
NOT INHERENT IN FRAMING SYSTEM USED, PROVIDE CLOSELY
FITTED SOLID WOOD BLOCKS OF SAME WIDTH AS FRAMING
MEMBERS AND 2-INCH NOMINAL- THICKNESS.
E. SORT AND SELECT LUMBER SO THAT NATURAL CHARACTERISTICS WILL
NOT INTERFERE WITH INSTALLATION OR WITH FASTENING OTHER
MATERIALS TO LUMBER. DO NOT USE MATERIALS WITH DEFECTS THAT
INTERFERE WITH FUNCTION OF MEMBER OR PIECES THAT ARE TOO
SMALL TO USE WITH MINIMUM NUMBER OF JOINTS OR OPTIMUM JOINT
ARRANGEMENT.
F. COMPLY WITH AWPA M4 FOR APPLYING FIELD TREATMENT TO CUT
SURFACES OF PRESERVATIVE-TREATED LUMBER.
G. SECURELY ATTACH ROUGH CARPENTRY WORK TO SUBSTRATE BY
ANCHORING AND FASTENING AS INDICATED, COMPLYING WITH THE
FOLLOWING:
1. NES NER-272 FOR POWER-DRIVEN FASTENERS.
2. TABLE 2304.9.1, "FASTENING SCHEDULE," IN ICC'S INTERNATIONAL
BUILDING CODE.
H. USE COMMON WIRE NAILS, UNLESS OTHERWISE INDICATED. SELECT
FASTENERS OF SIZE THAT WILL NOT FULLY PENETRATE MEMBERS
WHERE OPPOSITE SIDE WILL BE EXPOSED TO VIEW OR WILL RECEIVE
FINISH MATERIALS. MAKE TIGHT CONNECTIONS BETWEEN MEMBERS.
INSTALL FASTENERS WITHOUT SPLITTING WOOD; DO NOT COUNTERSINK
NAIL HEADS, UNLESS OTHERWISE INDICATED.
3.2 WOOD BLOCKING, AND NAILER INSTALLATION
A. INSTALL WHERE INDICATED AND WHERE REQUIRED FOR SCREEDING OR
ATTACHING OTHER WORK. FORM TO SHAPES INDICATED AND CUT AS
REQUIRED FOR TRUE LINE AND LEVEL OF ATTACHED WORK.
COORDINATE LOCATIONS WITH OTHER WORK INVOLVED.
B. ATTACH ITEMS TO SUBSTRATES TO SUPPORT APPLIED LOADING. RECESS
BOLTS AND NUTS FLUSH WITH SURFACES, UNLESS OTHERWISE
INDICATED.
3.3 WALL AND PARTITION FRAMING INSTALLATION
A. GENERAL: PROVIDE SINGLE BOTTOM PLATE AND DOUBLE TOP PLATES
USING MEMBERS OF 2-INCH NOMINAL THICKNESS WHOSE WIDTHS EQUAL
THAT OF STUDS, EXCEPT SINGLE TOP PLATE MAY BE USED FOR
NON-LOAD-BEARING PARTITIONS. FASTEN PLATES TO SUPPORTING
CONSTRUCTION, UNLESS OTHERWISE INDICATED.
1. FOR INTERIOR PARTITIONS AND WALLS, PROVIDE 2-BY-4-INCH
NOMINAL- SIZE WOOD STUDS SPACED 16 INCHES O.C., UNLESS
OTHERWISE INDICATED.
2. PROVIDE CONTINUOUS HORIZONTAL BLOCKING AT MIDHEIGHT OF
PARTITIONS MORE THAN 96 INCHES HIGH, USING MEMBERS OF
2-INCH NOMINAL THICKNESS AND OF SAME WIDTH AS WALL OR
PARTITIONS OR AS INDICATED ON DRAWINGS.
B. CONSTRUCT CORNERS AND INTERSECTIONS WITH THREE OR MORE
STUDS.
C. FRAME OPENINGS WITH MULTIPLE STUDS AND HEADERS. PROVIDE
NAILED HEADER MEMBERS OF THICKNESS EQUAL TO WIDTH OF STUDS.
SUPPORT HEADERS ON JAMB STUDS.
1. FOR NON-LOAD-BEARING PARTITIONS, PROVIDE DOUBLE-JAMB
STUDS AND HEADERS NOT LESS THAN 4-INCH NOMINAL DEPTH FOR
OPENINGS 48 INCHES AND LESS IN WIDTH, 6-INCH NOMINAL DEPTH
FOR OPENINGS 48 TO 72 INCHES IN WIDTH, 8-INCH NOMINAL DEPTH
FOR OPENINGS 72 TO 120 INCHES IN WIDTH, AND NOT LESS THAN
10-INCH NOMINAL DEPTH FOR OPENINGS 10 TO 12 FEET IN WIDTH.
3.4 PROTECTION
A. PROTECT WOOD THAT HAS BEEN TREATED WITH INORGANIC BORON
(SBX) FROM WEATHER. IF, DESPITE PROTECTION, INORGANIC
BORON-TREATED WOOD BECOMES WET, APPLY EPA-REGISTERED
BORATE TREATMENT. APPLY BORATE SOLUTION BY SPRAYING TO
COMPLY WITH EPA-REGISTERED LABEL.
END OF SECTION 061000
SECTION 071416 - COLD FLUID-APPLIED WATERPROOFING
(AUXILIARY / TRANSITIONS)
PART 1 - GENERAL
1.01 SUMMARY
A. SECTION INCLUDES:
1. COLD FLUID-APPLIED WATERPROOFING USED AT TRANSITIONS,
DETAILING, AND TIE-INS ASSOCIATED WITH BELOW-GRADE
FOUNDATION WATERPROOFING IMPROVEMENTS.
2. WATERPROOFING AT CRACKS, JOINTS, PENETRATIONS, AND
IRREGULAR SUBSTRATES WHERE SHEET MEMBRANE CANNOT
BE APPLIED CONTINUOUSLY, INCLUDING TREATMENT OF
CONCRETE COLD JOINTS USING HYDROPHILIC CONCRETE
JOINT TAPE IN COMBINATION WITH FLUID-APPLIED
WATERPROOFING.
3. SEALANT AND ACCESSORY MATERIALS REQUIRED FOR
COMPLETE WATERPROOFING SYSTEM CONTINUITY.
B. RELATED SECTIONS:
1. SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING
(PRIMARY MEMBRANE).
2. SECTION 071416 - DRAINAGE COMPOSITE / FOUNDATION
DRAINAGE MEMBRANE.
3. SECTION 079200 - JOINT SEALANTS.
4. DIVISION 31 - EARTHWORK (EXCAVATION, BACKFILL, AND
COMPACTION) (SPECIFICATION PROVIDED IN PROJECT
MANUAL)
1.02 REFERENCES
A. ASTM STANDARDS (LATEST EDITIONS).
B. MANUFACTURER PUBLISHED INSTALLATION REQUIREMENTS AND
DETAILS.
C. LOCAL CODE REQUIREMENTS APPLICABLE TO BELOW-GRADE
WATERPROOFING AND DRAINAGE SYSTEMS.
1.03 SUBMITTALS
A. PRODUCT DATA: SUBMIT MANUFACTURER DATA SHEETS FOR:
1. FLUID-APPLIED WATERPROOFING MATERIAL
2. PRIMER (IF REQUIRED)
3. REINFORCING FABRIC (IF REQUIRED)
4. SEALANTS AND TERMINATION ACCESSORIES
B. SHOP DRAWINGS / DETAILS:
1. WATERPROOFING TERMINATION DETAIL AT TOP OF
FOUNDATION WALL (TIE-IN TO BRICK VENEER).
2. WATERPROOFING TIE-IN TO FOUNDATION DRAIN SYSTEM.
3. PENETRATION AND TRANSITION DETAILS.
C. INSTALLER QUALIFICATIONS:
1. WATERPROOFING INSTALLER SHALL BE EXPERIENCED IN
BELOW-GRADE FOUNDATION WATERPROOFING INSTALLATIONS
AND SHALL FOLLOW MANUFACTURER INSTALLATION
REQUIREMENTS.
1.04 QUALITY ASSURANCE
A. PRE-INSTALLATION CONFERENCE:
1. CONTRACTOR SHALL COORDINATE WATERPROOFING
INSTALLATION WITH EXCAVATION, FOUNDATION DRAIN
INSTALLATION, AND BACKFILL OPERATIONS.
2. COLD JOINT TREATMENT SHALL CONSIST OF BOTH
HYDROPHILIC JOINT TAPE AND FLUID-APPLIED
WATERPROOFING; NEITHER SYSTEM ALONE IS ACCEPTABLE.
B. MOCK-UP (IF REQUESTED):
1. PROVIDE A SMALL TEST AREA DEMONSTRATING
WATERPROOFING MEMBRANE, TERMINATION, AND DELTA
DRAIN INSTALLATION PRIOR TO FULL PRODUCTION.
1.05 DELIVERY, STORAGE, AND HANDLING
A. DELIVER MATERIALS IN ORIGINAL UNOPENED CONTAINERS WITH
LABELS…