3-Selvidge 2026.xlsx

XLSX spreadsheet 8 KB Posted

Attached to
Data Cable RFP - Selvidge Middle School
Solicitation number
26-13103
Issued by
Missouri

About this file

This file is a data cable installation specification document for Selvidge Middle School in the Rockwood School District, Missouri. The project requires the provision and installation of Cat6a drops, IDF racks and cabinets, and a fiber campus backbone. The specification details network infrastructure across five IDFs: MDF A (Storage), IDF B (Room 30 SSD), IDF C (Music), IDF D (Room 49 Tech Lab), and IDF E (Library). The project encompasses 53 classrooms requiring 212 data drops, totaling 271 drops across the facility. The document specifies that fiber connections should only terminate in designated closets, with no copper terminations permitted in certain areas. Specific locations are identified for classroom drops, common areas including the cafeteria (59 drops), gymnasium, offices, and hallways, with detailed specifications for access point installations and printer connections throughout the building.

The installation specifications include precise requirements for drop locations, quantities, and their respective termination points within each IDF. Copper data drops are required in various configurations ranging from single drops in ceiling spaces to multiple drops with specific placement requirements, such as the cafeteria requiring six drops in the office area and the main gymnasium requiring four drops with two in opposite corners. Additional infrastructure needs include outdoor access point installations by the district and drops in storage closets. The document provides a comprehensive inventory of distribution points and quantities needed for each location, enabling bidders to develop accurate cost proposals and installation timelines for the complete network infrastructure upgrade at Selvidge Middle School.

View the file

Other files

File Type Posted
5-Appendix B.pdf PDF
2-Appendix A - Parts List - E-Rate 2026.xlsx XLSX spreadsheet
1-Acknowledgement Form.pdf PDF
4-26-13103 Addendum 1.pdf PDF
6-26-13103 Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Selvidge Location

Data Closet5 IDFs5
MDF A (Storage)
IDF B (Rm30 SSD)
IDF C (Music)
IDF D (Rm 49 Tech Lab)Fiber OnlyNo Copper Should Terminate in this Closet
IDF E (Library)
Appendix B; Classroom (53) DATA (212)53212271
Room #FeetDropsAPFxSwitch
3MDF A4
4MDF A4
5MDF A4
6MDF A4
7MDF A4
8MDF A4
9MDF A4
10MDF A4
11MDF A4
12MDF A4
13MDF A4
14MDF A4
15MDF A4
16MDF A4
17MDF A4
18MDF A4
19MDF A4
20MDF A4
21MDF A4
Storage (next 21)MDF A4
24MDF A4
25MDF A4
26MDF A4
27MDF A4
29MDF A4
65MDF A4
31IDF B4
32IDF B4
33IDF B4
34IDF B4
35IDF B4
36IDF B4
37IDF B4
38IDF B4
39IDF B4
40IDF B4
41IDF B4
42IDF B4
43IDF B4
44IDF B4
45IDF B4
46IDF B4
47IDF B4
48IDF B4
49IDF A/C4
50IDF A/C4
51IDF A/C4
53IDF C4
54IDF C4
59IDF C4
60IDF C/E4
61IDF A/E4
62IDF A/E4
Appendix C; Specific Copper Data Drops59
CafeteriaMDF A62 on each side 2 for Ap in center
Cafe officeMDF A66 drops in cafe office
Freezer fridgeMDF A21 drop at each
LobbyMDF A / Library22 In Ceiling
MAIN GYMIDF E42in Oppisite Corners
Room 2MDF A32 in Corner at Desk 1 in Celing
Room 6 (Hall)MDF A22 at Printer
Room 9 (Hall)MDF A22 at Printer
Room 19 (Hall)MDF A22 at Printer
Room 28MDF A84 at Desk, 2 In Corner, 2 in Celing
Room 64MDF A11 in Celing
Room 63MDF A11 in Celing
Room 31IDF B11 at Printer
Room 37IDF B22 in Celing against wall (for outdoor AP installed by District)
OfficeIDF E82 in Confrence room, 2 in Office(Ceiling), 2 in Princiapal office ceilingFor Outdoor AP
Copy RoomIDF E42 on Each Side
AP in Hall near Kitchen (Green hall)2Just outside Kitchen door to hall
Room 511Drop in Celing for AP near outside wall
ClassConnection2Storage closet in corner of cafe (Lower left)

File details come from the government source that posted it. Updated .