3-Project Manual MABR WWTP UV Project 20260317.pdf

PDF 20 MB Posted

Attached to
MABR - WWTP UV Disinfection Installation Project (32082.20)
Solicitation number
US.227050
Issued by
Schuylkill County, Pennsylvania

About this file

MABR – WWTP UV Disinfection Installation Project Summary

This is a project manual and bidding document for the Municipal Authority of the Borough of Ringtown (MABR) in Ringtown, Pennsylvania, prepared by Alfred Benesch & Company as the engineer of record. The project involves construction of two parallel UV disinfection channels with an associated building, installation of UV disinfection equipment and appurtenances, and modifications to the existing wastewater treatment plant flow meter pit. Sealed bids will be received online via the PennBid Program until Wednesday, April 15, 2026, at 2:00 P.M. (prevailing time), with bid results available immediately following opening. The entire project will be awarded to a single contractor. Site visits are permitted by request, and a pre-bid conference is not explicitly required. The successful bidder must achieve Substantial Completion within 90 calendar days and final completion within 120 calendar days from the Notice to Proceed. Liquidated damages of $1,000 per day apply after Substantial Completion and $500 per day thereafter until final completion. The contract will be awarded to the lowest responsive and responsible bidder, or all bids will be rejected, within 60 days of bid opening, or within 120 days if delayed by required approvals of another government agency or project financing closing.

Bidders must submit a bid bond, certified check, or bank draft equal to 10 percent of the total bid amount. The successful bidder must provide performance and payment bonds, each in the amount of 100 percent of the contract price. The contract is unit price work with estimated quantities for comparison purposes only, and actual quantities will be determined by the engineer. Prevailing wage requirements apply pursuant to Pennsylvania law, with wage determination schedules included in the project manual. The contractor is responsible for all permits, compliance with federal and state environmental regulations including erosion control, underground utility locating, and compliance with the Americans with Disabilities Act and OSHA requirements. The project includes provisions for a 5 percent retainage on work completed and 10 percent retainage on materials and equipment not yet incorporated, with retainage eliminated after 50 percent completion if progress is satisfactory. Payment will be made 30 days after presentation of applications for payment, with interest accruing on final payment at six percent per annum. A $1,000 minimum retention amount is withheld until record drawings are completed and delivered to the engineer's satisfaction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .