Project Manual for Hannah Street Park Project – Houtzdale Borough
This is a project manual for a construction contract issued by Houtzdale Borough in Clearfield County, Pennsylvania, for the Hannah Street Park Project. The project consists of the installation of 60 square yards of 5-inch depth concrete sidewalk, a concrete pad and foundation for a gazebo, bituminous pavement for two standard parking spaces and one handicap parking space, line striping, handicap parking signage, tree removal, erosion and sedimentation controls, and all related appurtenances and labor. Sealed bids are due online via PennBid by 10:00 A.M. EST on Thursday, October 29, 2026, at which time bids will be opened and publicly posted. The successful bidder must achieve substantial completion by May 21, 2027, and final completion by May 31, 2027. All bidding documents and project specifications are available at no cost on the PennBid platform (https://pennbid.net), with questions to be submitted through the platform's Clarifications tab at least seven days prior to bid opening.
The bid is structured on a unit price basis across fourteen line items, with bid security required at ten percent of the maximum bid price in the form of a certified check, bank money order, or bid bond issued by a circular 570 listed surety. The successful bidder must furnish performance and payment bonds, each equal to 100 percent of the total contract amount, prior to award. The project is financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority, and in part by local borough funds, with all obligations imposed by the funding source applicable to the successful bidder. Prevailing wage rates established by the Commonwealth apply to all work on the project. The Owner reserves the right to reject any or all bids, including nonconforming, nonresponsive, unbalanced, or conditional bids, and award will be made to the responsible bidder submitting the lowest responsive base bid. All bidders must comply with state anti-bid-rigging regulations, submit non-collusion affidavits, Public Works Employment Verification Forms confirming E-Verify enrollment, and certifications regarding non-segregated facilities and non-employment of illegal alien labor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
[THIS PAGE LEFT INTENTIONALLY BLANK.]
EADS Project No. 0120-25-218
HOUTZDALE BOROUGH
Clearfield County, Pennsylvania
HANNAH STREET PARK PROJECT
Table of Contents 000110 - 1
000110 TABLE OF CONTENTS
Section Description Page Numbers
001113 Advertisement for Bids 001113-1
0021153.12 Instructions to Bidders 002113.12-1 to 002113.12-12
Bid Documents:
004143 Bid Form 004143-1 to 004143-6
004313 Bid Bond 004313-1 to 004313-2
004513 Qualifications Statement 004513-1 to 004513-11
004519 Non-Collusion Affidavit of Prime Bidder 004519-1
004533 Certification of Non-Segregated Facilities & Non-Employment of Illegal Alien Labor 004533-1 to 004533-2
004546.13 Public Works Employment Verification Form 004546.13-1
004546.14 PA Worker Protection & Investment Certification Form 004546.14-1
004599 Grant Agreement & Nondiscrimination/Sexual Harassment
Provisions, Acknowledgement of Prime Bidder 004599-1 to 04599-3
Award Documents:
005100 Notice of Award 005100-1
005213.12 Agreement 005213.12-1 to 005213.12 -7
005500 Notice to Proceed 005500-1
006113.13 Performance Bond 006113.13-1 to 006113.13-3
006113.16 Payment Bond 006113-1 to 006113-4
Construction & Closeout Documents:
006250 Waiver of Lien 006250-1 to 006250-2
006276 Contractor’s Application for Payment 04 pages
006336 Field Order 006336-1
006349 Work Change Directive 006349-1
006363 Change Order 006363 -1
006516 Certificate of Substantial Completion 006516 -1
006517 Notice of Acceptability of Work 006517-1 to 006517-2
006519.26 Acceptance of Final Payment and General Release 006519.26-1
Contract Conditions:
007213.12 Standard General Conditions of the Construction Contract 61 pages (EJCDC C-700)
007314 Supplementary Conditions 007314-1 to 007314-17
Attachments to the Supplementary Conditions:
Greenways, Trails, and Recreation Program Grant Agreement 27 Pages
Pennsylvania Prevailing Wage Rates 05 Pages
EADS Project No. 0120-25-218
Table of Contents 000110 - 2
000110 TABLE OF CONTENTS (Continued)
Section Description Page Numbers
DETAILED TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 Summary 011000-1 to 011000-2
012000 Price And Payment Procedures 012000-1 to 012000-3
012500 Substitution Procedures 012500-1 to 012500-2
013000 Administrative Requirements 013000-1 to 013000-3
013216 Construction Progress Schedule 013216-1 to 013216-3
013300 Submittal Procedures 013300-1 to 013300-7
014000 Quality Requirements 014000-1 to 014000-4
015000 Temporary Facilities And Controls 015000-1 to 015000-7
016000 Product Requirements 016000-1 to 016000-2
017000 Execution And Closeout Requirements 017000-1 to 017000-6
DIVISION 03 – CONCRETE
033000 Cast-In-Place Concrete 033000-1 to 033000-10
DIVISION 31 – EARTHWORK
310513 Soils For Earthwork 310513-1 to 310513-2
310516 Aggregates For Earthwork 310516-1 to 310516-4
311000
312213
312316
Site Clearing
Rough Grading
Excavation
311000-1 to 311000-3
312213-1 to 312213-5
312316-1 to 312316-5
312318 Rock Removal 312318-1 to 312318-2
312323 Fill 312323-1 to 312323-5
312500 Erosion And Sedimentation Controls 312500-1 to 312500-3
DIVISION 32 - EXTERIOR IMPROVEMENTS
321123 Aggregate Base Courses 321123-1 to 321123-3
321216 Asphalt Paving 321216-1 to 321216-6
321313 Concrete Paving 321313-1 to 321313-8
321723 Pavement Markings 321723-1 to 321723-3
329119 Landscape Grading 329119-1 to 329119-3
329219 Seeding 329219-1 to 329219-4
Contacts
Plans & Specs, Bidders List, Vendors, Addenda Inquiries, etc.
PENNBID’s Website: https://pennbid.net
ADVERTISEMENT FOR BIDS
Advertisement for Bids 001113 - 1 This document is a MODIFIED version of EJCDC® C-111, Copyright © 2013
National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
HOUTZDALE BOROUGH
ADVERTISEMENT FOR BIDS
Houtzdale Borough (Owner) will receive sealed bids online via PennBid for the construction of the Hannah
Street Park Project until 10:00 A.M. (E.S.T) on Thursday, October 29, 2026, at which time they shall be opened online & publicly posted via PennBid. Bids submitted by any other means will not be accepted. All documents & solicitation details are available at no cost on https://pennbid.net. Questions & inquiries should be addressed through PennBid’s “Clarifications” tab.
The project consists of the installation of 60 SY of 5” depth concrete sidewalk, concrete pad, and foundation for a gazebo, bituminous pavement for two parking spaces and one handicap parking space, appurtenances, & all related work. Work under this contract shall include all materials, equipment, supplies, & labor for the construction as shown & specified in the Contract Documents. The project is located in Clearfield County, PA.
This project is being financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth
Financing Authority & in part with local funds. The obligations imposed on the Owner by the funding source shall apply to & be acceptable to the successful bidder. Not less than the minimum salaries & wages as set forth in the Contract Documents must be paid on this project. Bidders must comply with all State anti-bid-rigging regulations pertaining to work associated with this project & will be required to submit an executed non-collusion affidavit with the bid.
Bid security shall be furnished in accordance with the Instructions to Bidders. Prior to the award of the contract, the successful bidder shall furnish a satisfactory Performance Bond & a Payment Bond to the Owner, in the form contained in the Contract Documents & executed by a satisfactory circular 570 listed surety, each equal to 100% of the total contract amount. The bidder will also furnish evidence of insurance coverage as required by the contract documents.
The Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. The Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work and to award the contract as may be deemed in the best interest of the Owner.
Owner: Houtzdale Borough
INSTRUCTIONS TO BIDDERS
Instructions to Bidders 002113.12 - i This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifications of Bidders
ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety
Program; Other Work at the Site
ARTICLE 5 – Bidder’s Representations
ARTICLE 6 – Pre-Bid Conference
ARTICLE 7 – Interpretations and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Substitute and “Or-Equal” Items
ARTICLE 12 – Subcontractors, Suppliers and Others
ARTICLE 13 – Preparation of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submittal of Bid
ARTICLE 16 – Modification and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evaluation of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
ARTICLE 22 – Sales and Use Taxes
ARTICLE 23 – Steel Products Procurement Act
ARTICLE 24 – Minimum Hourly Wage Rates
ARTICLE 25 – Non-Discrimination Clause/Sexual Harassment Clause
ARTICLE 26 – Additional bid information
ARTICLE 27 – Employee Testing Act
ARTICLE 28 – Americans With Disabilities Act
ARTICLE 29 – Anti-Pollution Regulations
ARTICLE 30 – Pennsylvania Right-To-Know Law
ARTICLE 31 – Public Works Employment Verification Act
ARTICLE 32 – Project Funding
Instruction to Bidders 002113.12 - 1
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued. The issuing office is PennBid via https://pennbid.net.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement for bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 Bidders shall have successfully completed projects similar in character and scope.
3.02 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state where the Project is located.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article
12 of these Instructions, “Subcontractors, Suppliers, and Others.”
D. Qualifications Statement (EJCDC C451).
3.03 A Bidder’s failure to submit required qualification information with its Bid may disqualify Bidder from receiving an award of the Contract.
3.04 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.05 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
Instruction to Bidders 002113.12 - 2
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site, if any.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any.
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site, if any.
d. Technical Data contained in such reports and drawings, if any.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the
Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and
Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the
Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
Instruction to Bidders 002113.12 - 3
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the
Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to
Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at
Instruction to Bidders 002113.12 - 4
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the
Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A Pre-Bid Conference, if any, will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer electronically via PennBid (https://pennbid.net). Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent
(10%) of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the
Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the
Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract
Documents and furnish the required contract security within 10 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of
Instruction to Bidders 002113.12 - 5
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the
Contract or 61 days after the Bid opening with an additional 60 days if needed if the award is delayed by the required approval of another government agency, the sale of bonds, or the award of a grant, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the
Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents with consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the
Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may be made to and may be considered by
Engineer. The burden of proof rests with the prime bidders. Adequate supporting information must be submitted to the Engineer to enable the Engineer to determine the equality of a product.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk. Bidders are urged to submit any questions on the suitability of a product to the Engineer in writing during the bidding period.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such
Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an
Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or
Contractor to retain any Subcontractor, Supplier, or other individual or entity against which
Contractor has reasonable objection.
12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the Work.
If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Instruction to Bidders 002113.12 - 6
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating
Bids and making the Contract award.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the
Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents. Bid Form to be completed by Bidder is included in the PennBid system for this Project (https://pennbid.net).
A. All blanks on the Bid Form shall be completed and the Bid Form must be signed or otherwise made genuine using the PennBid system (https://pennbid.net). A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then
Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 If pricing on a specific alternate item is not provided and becomes necessary for project completion, the pricing indicated on the Base Bid will be used for the pricing for the alternate bids.
13.03 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The partnership’s address for receiving notices shall be shown.
13.05 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
13.06 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
13.07 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
13.08 All names shall be printed in ink below the signatures.
13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form and in the PennBid system (https://pennbid.net).
Instruction to Bidders 002113.12 - 7
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
13.10 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Base Bid
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed for the Base Bid and include a separate price for each alternate, if any, described in the Bidding Documents and as provided for in the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the
Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
D. In the comparison of Bids, alternates, if any, may be applied in any order regardless of order listed on Bid Form.
14.02 Allowances
A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for
Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the
General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the
Advertisement for Bids and shall be submitted electronically via PennBid (https://pennbid.net) and shall include the required bid forms. All blank spaces for bid prices must be filled in and the bid form must be fully completed and executed when submitted.
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a
Bid must be executed and delivered to the place where Bids are to be submitted prior to the date
Instruction to Bidders 002113.12 - 8
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, will be made available to the public on the PennBid system
(https://pennbid.net). An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
17.02 If more than one Contract is being bid, the Bids received will be opened in numerical order beginning with the first Contract number. Following the opening of Bids for each Contract, Bidders will be given a short time in which they can withdraw unopened Bids for the remaining
Contract(s). A representative of the Bidder must be present at the Bid opening and show proper identification to withdraw a Bid.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that
Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Base Bid and any combination of the alternates (if applicable).
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid
Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
Instruction to Bidders 002113.12 - 9
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
C. Alternates may be applied in any order and the award may be made to the Successful Bidder on its base Bid and any combination of its alternate Bids or none, for which the Owner determines funds will be available at the time of award.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the
Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the
Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within ten (10) days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within twenty (20) days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful
Bidder, together with printed and electronic copies of the Contract Documents as stated in
Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from Pennsylvania state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to the Supplementary
Conditions for additional information.
ARTICLE 23 – STEEL PRODUCTS PROCUREMENT ACT
23.01 The Contractor shall comply with the provisions of the Act of March 3, 1978 (P.L. 6, No. 3, 73
P.S. § 1881 et seq., known as the “Steel Procurement Act”.
ARTICLE 24 – MINIMUM HOURLY WAGE RATES
24.01 Minimum hourly wage rate requirements are outlined in the Supplementary Conditions.
ARTICLE 25 – NON-DISCRIMINATION CLAUSE/SEXUAL HARASSMENT CLAUSE
25.01 As specified in the Supplementary Conditions, contractors shall comply with the Contract
Compliance Regulations of the Pennsylvania Human Relations Commission, 16 PA, Code
Chapter 49 and with all laws prohibiting discrimination in hiring or employment opportunities.
The Contractor shall not discriminate on the basis of race, creed, religion, sex, age or natural origin and shall be in compliance with the Act of October 27, 1955 (P.L. 744 No. 222, known as
Instruction to Bidders 002113.12 - 10
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
“Pennsylvania Human Relations Act”) and Title VI of the Civil Rights Act of 1964, Public Law
88-352, 42 U.S.C., Section 200A et seq.
Contractors and subcontractors shall establish and maintain a written sexual harassment policy and non-discrimination clause and shall inform their employees of the policy. The policy must contain a notice that sexual harassment and discrimination will not be tolerated and employees who practice it will be disciplined.
For additional requirements regarding this clause, refer to the Supplementary Conditions contained in this Project Manual.
ARTICLE 26 – ADDITIONAL BID INFORMATION
26.01 Bidder’s attention is called to the fact that the schedule of quantities of work to be done and equipment to be furnished under these specifications as shown on the Bid Form, and in the
Contract, is approximate, and is given only as a basis for calculation upon which the bids will be compared.
Unit prices will constitute the bid price. Owner does not assume any responsibility that quantities set forth shall be realized strictly in the work, nor shall the Contractor plead misunderstanding or deception because of such schedule of quantities or of the character of work, location or other conditions pertaining thereto. Owner reserves the right to increase or diminish any or all above mentioned quantities of work or to omit any of them as they may deem necessary, and such increase or decrease of the quantities given for any of the items shall not be considered as sufficient grounds for granting an increase in the unit price bid.
ARTICLE 27 – EMPLOYEE TESTING ACT
27.01 The relationship between the Contractor and the Owner will be one of independent contractor and not employer/employee and that the individual employees of the Contractor who will be performing the work pursuant to this Contract are not employees of the Owner. Contractor hereby certifies, represents, and warrants to the Owner that all persons performing any aspect of the work pursuant to this Contract who are required to have a commercial driver’s license are subject to a program for drug and alcohol testing in accordance with the Omnibus Transportation Employee
Testing Act of 1991 and the Federal regulations adopted pursuant thereto.
ARTICLE 28 – AMERICANS WITH DISABILITIES ACT
28.01 Pursuant to federal regulations promulgated under the authority of the Americans with
Disabilities Act, 28 C.F.R. §35.101 et seq., the Contractor understands and agrees that no individual with a disability shall, on the basis of the disability, be excluded from participation in this project or from activities provided for under this project. As a condition of accepting and executing this contract, the Contractor agrees to comply with the “General Prohibitions Against
Discrimination,” 28 C.F.R. §35.130, and all other regulations promulgated under Title II of The
Americans With Disabilities Act which are applicable to the benefits, services, programs and activities provided by the Commonwealth through contracts with outside contractors.
ARTICLE 29 – ANTI-POLLUTION REGULATIONS
29.01 The Contractor and its subcontractors agree that in the performance of their obligations under this contract they shall minimize pollution and shall strictly comply with all applicable environmental laws and regulations.
Instruction to Bidders 002113.12 - 11
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved
A copy of the permits obtained by the Owner for this Project can be found at the rear of these specifications. Contractor shall perform notifications to all agencies described therein.
ARTICLE 30 – PENNSYLVANIA RIGHT-TO-KNOW LAW
30.01 The Pennsylvania Right-to-Know Law, Act 3 of 2008, effective January 1, 2009, 65 P.S. §§
67.101-3107, applies to this project. It provides for access to public information, for a designated open-records officer in each Commonwealth agency, local agency, judicial agency and legislative agency, for procedure, for appeal of agency determination, for judicial review and for the Office of Open Records; imposing penalties; providing for reporting by State-related institutions;
requiring the posting of certain State contract information on the Internet; and making related repeals.
Refer to the Supplementary Conditions for additional contract obligations under the Pennsylvania
Right-to-Know Law.
ARTICLE 31 – PUBLIC WORKS EMPLOYMENT VERIFICATION ACT
31.01 Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provision, duties, obligations, and penalties of the Public Works Employment Verification
Act, 71 P.S. 656.1-656.11, which is incorporated herein by reference.
A completed Public Works Employment Verification Form will be required from the Contractor with each bid. The authorized signer of the Form hereby states that he or she possesses sufficient knowledge to make the representations and certifications on the Form. Failure to provide a completed Form will be result in rejection of the bid, and may subject the Contractor to the enforcement activities, sanctions, and civil penalties specified in the Act.
The lowest responsible bidder must comply with the Public Works Employment Verification Act by submitting a Commonwealth Public Works Employment Verification Form to the Owner prior to award of the contract. The relevant information regarding this Act can be found on the
Department of General Services’ website at www.dgs.pa.gov.
The requirement of the Public Works Employment Verification Form is in accordance with the
Public Works Employment Verification Act 71 P.S. 656.1-656.11 (known as Act 141, effective
January 3, 2023, replacing Act 127 of 2012), the use of the Federal Government’s E-Verify system to ensure that all employees performing work on public works projects, including subcontractor’s employees, are authorized to work in the United States. The Contractor will be required to include information about the Act in all subcontracts.
Further information regarding the Public Works Employment Verification Act, as it complies with this project, can be found in the Supplementary Conditions of this Project Manual.
ARTICLE 32 – PROJECT FUNDING
32.01 The project is being financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority and by local funds. The obligations imposed on the Owner by the funding agency shall apply to and be acceptable to the successful bidder. Refer to the
Supplementary Conditions for a listing of these obligations.
32.02 Prime Contractor shall note that the funding agency requires a construction sign be placed at the construction site supported under this award.
A. Acknowledgement of the Pennsylvania Commonwealth of Pennsylvania, Commonwealth
Financing Authority assistance to fund this project is a requirement, thus a sign acknowledging said financial assistance, or administrative participation will be erected in the
Instruction to Bidders 002113.12 - 12
This document is a MODIFIED version of EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved project area. Therefore, the Prime Contractor shall furnish and install one (1) project sign for this Project. The information specified below shall be displayed on both sides of the sign.
The sign shall be erected in a prominent and readily visible location within the project limits, as approved by the Owner.
B. The sign shall be of substantial construction and made of good quality, one-inch stock lumber with two-inch by one-inch strip molding around the outer edges, the signs to be at least four feet by six feet in dimension. The signs shall be erected on two-inch by four-inch uprights, carefully braced and placed in the ground to the required depth.
The entire sign on both sides shall be given a priming coat of oil paint, two coats of white oil paint and lettering placed on each side of the sign containing, essentially, the following information:
Houtzdale Borough
Hannah Street Park Project
This Project is financed in part by a grant from the
Commonwealth of Pennsylvania, Commonwealth Financing Authority.
The wording is subject to final approval and may be revised prior to actual initiation of the work.
The Prime Contractor shall protect and maintain the sign in good condition throughout the life of the project.
END OF INSTRUCTIONS FOR BIDDERS
BID DOCUMENTS:
• Bid Form (Form Of Proposal)
• Bid Bond
• Qualifications Statement
• Non-Collusion Affidavit Of Prime Bidder
• Certification Of Non-Segregated Facilities & Non-Employment Of
Illegal Alien Labor
• Public Works Employment Verification Form
• Pa Worker Protection & Investment Certification Form
• Grant Agreement & Nondiscrimination/Sexual Harassment Provisions, Acknowledgement Of Prime Bidder
Bid Form 004143 - i This document is a MODIFIED version of EJCDC® C-410, Bid Form for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
BID FORM
TABLE OF CONTENTS
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to this Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
Bid Form 004143 - 1
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
BID FORM
ARTICLE 1 – BID RECIPIENT
1.01 Sealed bids must be submitted online via PennBid (https://pennbid.net) by 10:00 A.M. (E.S.T) on