3-Pricing Section BT-28LS 1793718074.4135993.xlsx

XLSX spreadsheet 9 KB Posted

Attached to
2027 Landscaping
Solicitation number
US.258650
Issued by
Chester County, Pennsylvania

About this file

This is a pricing section spreadsheet for the 2027 Landscaping contract opportunity issued by the Borough of West Chester, Pennsylvania. The document presents a detailed bid pricing analysis for James Ryan Landscaping LLC, which submitted a total base bid cost of $147,290.26 covering 15 line items across three bid sections: Base Bid Pricing (2027), Bid Alternate No. 1 (2028), and Bid Alternate No. 2 (2029). The contract encompasses mowing and trimming services for 14 borough parks and facilities—including Green Field Park, Mostellar Park, Bayard Rustin Park, Kathy McBratnie Park, Horace Pippin Park, Everhart Park, Veterans Memorial Park, Marshall Square Park, Hoopes Park, 401 E. Gay Street, Barclay Park, 205 Lacey Street, Grass Island at Strasburg Road and Hannum Avenue, and John O. Green Park—plus mulching services for all borough parks. Each line item is measured in hours with unit prices ranging from $39 to $508.61 per hour for 26-hour quantities. The sealed bid submission deadline was Tuesday, November 3, 2026 at 10:00 A.M. via PennBid, with the contract term extending up to three years.

The spreadsheet indicates that none of James Ryan Landscaping LLC's bid items were selected for award, as reflected by all "FALSE" designations in the selection column and zero selected items reported. Unit prices for the base bid mowing and trimming services range from $39 to $310.40 per hour, with mulching priced at $146.86 per hour. Bid Alternate No. 1 (2028) reflects identical mowing and trimming rates with mulching priced at $166.09 per hour, while Bid Alternate No. 2 (2029) maintains the same mowing and trimming rates with mulching at $175.71 per hour. The pricing analysis format indicates this document was used to compare competing bids and identify the lowest-priced responsive bidder, with green cells marking the lowest prices and orange cells indicating selected items.

View the file

Other files

File Type Posted
2-Addendum No 1 2026-10-27.pdf PDF
1-Landscaping Specifications 2027.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Legend

Pricing Section (BT-28LS)

Legend

The green cells with bolded numbers indicate that this bid was the lowest price.$ 123
The orange cells indicate that this item from that vendor was selected.
The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price.

Sheet 1

James Ryan Landscaping LLC
Total Cost$ 147,290.26
Selected #0
Selected ($)$ 0
#LockedItemsSelectedLowestQuantity
RequiredUnit

of

MeasureUnit
PriceTotal

Cost

1Base Bid Pricing (15)
#1-1FALSEMow and Trim Green Field Park$ 0$ 3,217.2426HRS$ 123.74$ 3,217.24
#1-2FALSEMow and Trim Mostellar Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#1-3FALSEMow and Trim Bayard Rustin Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#1-4FALSEMow and Trim Kathy McBratnie Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#1-5FALSEMow and Trim Horace Pippin Park$ 0$ 1,216.826HRS$ 46.8$ 1,216.8
#1-6FALSEMow and Trim Everhart Park$ 0$ 8,070.426HRS$ 310.4$ 8,070.4
#1-7FALSEMow and Trim Veterans Memorial Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#1-8FALSEMow and Trim Marshall Square Park$ 0$ 5,070.026HRS$ 195$ 5,070.0
#1-9FALSEMow and Trim Hoopes Park$ 0$ 13,223.8626HRS$ 508.61$ 13,223.86
#1-10FALSEMow and Trim 401 E. Gay Street$ 0$ 2,636.426HRS$ 101.4$ 2,636.4
#1-11FALSEMow and Trim Barclay Park$ 0$ 3,549.026HRS$ 136.5$ 3,549.0
#1-12FALSEMow and Trim 205 Lacey Street$ 0$ 1,014.026HRS$ 39$ 1,014.0
#1-13FALSEMow and Trim Grass Island at Strasburg Road and Hannum Avenue$ 0$ 1,014.026HRS$ 39$ 1,014.0
#1-14FALSEMow and Trim John O. Green Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#1-15FALSEMulch all Borough Parks$ 0$ 3,818.360000000000626HRS$ 146.86$ 3,818.3600000000006
2Bid Alternate No. 1 (2028) (15)
#2-1FALSEMow and Trim Green Field Park$ 0$ 3,217.2426HRS$ 123.74$ 3,217.24
#2-2FALSEMow and Trim Mostellar Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#2-3FALSEMow and Trim Bayard Rustin Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#2-4FALSEMow and Trim Kathy McBratnie Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#2-5FALSEMow and Trim Horace Pippin Park$ 0$ 1,216.826HRS$ 46.8$ 1,216.8
#2-6FALSEMow and Trim Everhart Park$ 0$ 8,070.426HRS$ 310.4$ 8,070.4
#2-7FALSEMow and Trim Veterans Memorial Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#2-8FALSEMow and Trim Marshall Square Park$ 0$ 5,070.026HRS$ 195$ 5,070.0
#2-9FALSEMow and Trim Hoopes Park$ 0$ 13,223.8626HRS$ 508.61$ 13,223.86
#2-10FALSEMow and Trim 401 E. Gay Street$ 0$ 2,636.426HRS$ 101.4$ 2,636.4
#2-11FALSEMow and Trim Barclay Park$ 0$ 3,549.026HRS$ 136.5$ 3,549.0
#2-12FALSEMow and Trim 205 Lacey Street$ 0$ 1,014.026HRS$ 39$ 1,014.0
#2-13FALSEMow and Trim Grass Island at Strasburg Road and Hannum Avenue$ 0$ 1,014.026HRS$ 39$ 1,014.0
#2-14FALSEMow and Trim John O. Green Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#2-15FALSEMulch all Borough Parks$ 0$ 4,318.3426HRS$ 166.09$ 4,318.34
3Bid Alternate No. 2 (2029) (15)
#3-1FALSEMow and Trim Green Field Park$ 0$ 3,217.2426HRS$ 123.74$ 3,217.24
#3-2FALSEMow and Trim Mostellar Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#3-3FALSEMow and Trim Bayard Rustin Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#3-4FALSEMow and Trim Kathy McBratnie Park$ 0$ 1,404.026HRS$ 54$ 1,404.0
#3-5FALSEMow and Trim Horace Pippin Park$ 0$ 1,216.826HRS$ 46.8$ 1,216.8
#3-6FALSEMow and Trim Everhart Park$ 0$ 8,070.426HRS$ 310.4$ 8,070.4
#3-7FALSEMow and Trim Veterans Memorial Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#3-8FALSEMow and Trim Marshall Square Park$ 0$ 5,070.026HRS$ 195$ 5,070.0
#3-9FALSEMow and Trim Hoopes Park$ 0$ 13,223.8626HRS$ 508.61$ 13,223.86
#3-10FALSEMow and Trim 401 E. Gay Street$ 0$ 2,636.426HRS$ 101.4$ 2,636.4
#3-11FALSEMow and Trim Barclay Park$ 0$ 3,549.026HRS$ 136.5$ 3,549.0
#3-12FALSEMow and Trim 205 Lacey Street$ 0$ 1,014.026HRS$ 39$ 1,014.0
#3-13FALSEMow and Trim Grass Island at Strasburg Road and Hannum Avenue$ 0$ 1,014.026HRS$ 39$ 1,014.0
#3-14FALSEMow and Trim John O. Green Park$ 0$ 1,014.026HRS$ 39$ 1,014.0
#3-15FALSEMulch all Borough Parks$ 0$ 4,568.4626HRS$ 175.71$ 4,568.46

File details come from the government source that posted it. Updated .