3-Industry Day Q and A_Dec2021.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Special Notice-Industry Day Results-for W912DW22R0LFP-DB Construction of ARS/WSU Plant Bioscience Research Building
Solicitation number
W912DW22R0LFP-IndustryDayResults
Issued by

About this file

This document contains the questions and answers from an Industry Day event, along with details of a related special notice. The Industry Day was held on December 7, 2021 to provide information to industry about Solicitation W912DW22R0LFP, which seeks a design-build contractor via a two-phase best value procurement to construct an ARS/WSU Plant Bioscience Research Building in Pullman, Washington. Key details include that the project value is approximately $80 million, Buy American requirements apply, a Project Labor Agreement may be required, and the solicitation will have small business goals. Technical factors will be more important than price in the best value determination. The Army Corps of Engineers and Washington State University will oversee the project, and the successful offeror must work with the bridging architect who developed the 35% design documents.

View the file

Other files

File Type Posted
2-Attendee Info_7Dec2021.xlsx XLSX spreadsheet
1-Slide Presentation_7Dec2021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

87101206134 - Q&A Report Question Report

TopicIndustry Day - W912DW22R0LFP# Question
Army Corps of Engineers Industry Day - Design-Build Construction of Lab in Pullman, WAWebinar ID: 871 0120 613434
Question Details
#QuestionAnswer(s)
1Will today's slide deck be shared with the Industry Day participants?The recording will be uploaded to our PTAC YouTube site
2As a federal project will Buy America(n) be required? If so, which level?live answered
3How heavy or light will the bridging documents be? Are you anticipating bridging docs at an SD or DD phase? Who is the bridging architect?live answered
4Is there a proposed start date for construction?live answered
5Will a list of Industry Day participants and contact information be distributed to participants to allow A-E & teaming opportunities?live answered
6Yes, Bridging documents are referring to the 35% submittal included in the RFPlive answered
7Yes I am talking about the 35% that you speak to in the slidelive answered
8Clarification: A-E and contractor teaming opportunitieslive answered
9Should be the docs you are putting on the street. you mentioned 35%.live answered
10For Step 1, what are the expected selection Factors to include?live answered
11Can you tell us what the project experience requirements will be? Specifically Size, Value and recency of work. thankslive answered
12Will a PLA be required?live answered
13How many contractors may pass Phase 1 and move to Phase 2?live answered
14When do you anticipate awarding the contract?live answered
15Will this be 2 phase best value evaluation? How many move in to phase 2? Also, will teaming partner experience be accepted?live answered
16Can the list of firms who responded to the Sources Sought notice be made available?live answered
17What will WSU's roll be during DB selection and during the project?live answered
18Who will be representing WSU on the project?live answered
19Will stipends be provided to the unsuccessful teams that are invited to submit design-build proposals during the RFP phase? What will the stipend amounts be?live answered
20Is the team that designed the 35% design documents precluded from competing for this design build contract?live answered
21Can you discuss what the Diverse Business Enterprise (MBE/WBE/DBE) goals or requirements will be for the project?live answered
22Who are the primary stakeholders involved, and will this include USDA?live answered
23Are there small business utilization goals?live answered
24What role will WSU staff play in team selection?live answered
25How will this solicitation be solicited, Full & Open, Small Business, 8(a)? (My apologies if I missed that specification earlier).live answered
26Please clarify the "Best Value Trade-off". Will all technical factor when combined be considered less than, equal to, or more important than price?live answered
27Can you tell us who will be the USACE Quality Assurance rep on site?live answered
28Is LEED Certification Part of this contract and what level of Certification will the project be seeking?live answered
29with the Bridging architect be part of the selection committee and will they be precluded from submitting on this project?live answered
30Due to the project being federaly funded, will this project follow DoD Unified Facility Crtieria?live answered
31Does the project scope include high containment space requirements (i.e. BSL-2, BSL-3, etc.)?live answered
32Will compliance with ARS 242.1 be required?live answered
33Will this procurement include a price evaluation preference for HUBZone small businesses?live answered
34Recommend maximum of 3 shortlisted for Phase II RFP will USACE follow this?live answered
35Will the upcoming design-build RFP require a full team of sub-consultants such as engineers as part of the proposal submission or will sub-consultants be selected after the contractor/architect are selected?The RFP is still being developed.
REFER TO: YouTube Link: https://youtu.be/5AOj-z8if_8