This is a Full Depth Rebuild Map prepared by the City of Hutto, Texas, depicting the roadway reconstruction project scope across multiple streets in the municipality. The project encompasses a base bid for Live Oak Street covering approximately 3,036 linear feet at 22 feet wide, with three alternate bids for additional streets: Alternate Bid A for East and West Metcalfe Street (approximately 1,626 linear feet), Alternate Bid B for Hutto Street (approximately 1,718 linear feet), and Alternate Bid C for Liberty Street and Church Street (approximately 1,919 linear feet). The project requires qualified contractors to perform field visits to verify site conditions and quantities prior to bid submission. A non-mandatory pre-bid meeting is scheduled for Wednesday, April 29, 2026, at 10:00 am CST via Microsoft Teams. Construction must be completed within 90 calendar days of the Notice to Proceed. A Professional Engineer registered in Texas must seal the required Traffic Control Plan prior to work commencement.

The scope of work for all locations involves removing 7 inches of existing asphalt, base, and subgrade material and replacing it with 5 inches of Type B hot mix asphalt and 2 inches of Type D hot mix asphalt, along with associated traffic control, site cleanup, and compliance with city specifications. Contractors must provide all labor, materials, and equipment necessary to complete the full depth rebuild. The map graphically displays the geographic extent and alignment of the roadway sections subject to reconstruction, with measurements provided in feet and location references to surrounding streets including Park Street, West Street, Whitfield Street, Pecan Street, and FM 1660.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Full Depth Rebuild

0 250 500 750 1,000

Feet

HUTTO ST

W METCALFE ST

W LIVE OAK ST

£¤79

£¤79

FM

Roadway

Full Depth Rebuild Live Oak Street Base Bid (~3,036.10 Linear Feet)

Alternate Bid A (~1,625.88 Linear Feet)

Alternate Bid B (~1,717.78 Linear Feet)

Alternate Bid C (~1,918.79 Linear Feet)