This is an Addendum No. 1 to the Elementary Roof Replacement project for the Fannett Metal School District located in Willow Hill, Pennsylvania. The addendum modifies key contract specifications and technical requirements for the roof replacement project, which includes selective demolition, EPDM fully adhered rubber roofing, insulation, metal coping and trims, and roof curbs. A non-mandatory pre-bid conference was held on Thursday, May 21, 2026, at 11:00 a.m. at Fannett Metal Elementary School, with sealed bids due electronically via PennBid by 2:00 p.m. on Thursday, May 28, 2026. Bidders were required to submit questions via the clarifications feature in PennBid no later than seven days prior to the bid due date, with responses issued as addenda when necessary.

The addendum revises the contract timeline from 90 calendar days to 300 calendar days for substantial and final completion, reflecting a significant extension to the project schedule. Additionally, the addendum notes that the school district is awaiting the award of a funding grant expected in fall 2026, with notice to proceed contingent upon grant award or denial. Technical modifications include revisions to roofing membrane specifications, specifically replacing quickseam splice tape references with Quickseam RPF Strip and updating detail notes to reference the ElevaTM website and specifications BT-14 and BT-15 for corner layouts, with membrane adhesive required between the quickseam RPF strip and insulation on adhered membrane systems. A 10 percent bid bond or certified check and a Performance and Payment Bond are required with bid submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fannett Metal School District Elementary Roof Replacement

May , 2026

Addendum No. 1

Specifications:

1-1 REVISE: Revise Section C-520 Agreement Article 4 – Contract Times Section 4.02A.

Contract times from 90 calendar days for substantial and final completion to 300 calendar days. Add “4.02B. Owner is awaiting award of funding grant that will be awarded in the fall of 2026. Notice to proceed will be given after award or denial of grant.

Drawings:

1-2 REVISE: Revise detail C/S1.1 note on Sheet S1.1 by removing the notes regarding quickseam splice tape and replaced with “Quickseam RPF Strip”. Replace note 8 of the detail to the following: Refer to the ElevateTM website for the most current information.

Refer to BT-14 & BT-15 for quickseam RPF strip layouts at corners. Membrane adhesive required between quickseam RPF strip and insulation on adhered membrane systems.

End of Addendum No. 1