3-ESH 2020-440 H (1-2) - Drawing Set.pdf

PDF 24 MB Posted

Attached to
BID - DSHS - ESH - EL & WL : Fire & Smoke Ctrl Retro-Comm REBID - Department of Social & Health Services
Solicitation number
2020-440 H (1-2)
Issued by
Washington

About this file

This document is a comprehensive set of architectural and mechanical drawings for a fire and smoke control retrofit project at Eastern State Hospital in Medical Lake, Washington, involving the Department of Social and Health Services (DSHS) and the Department of Enterprise Services. The project focuses on addressing existing fire safety and smoke control deficiencies in the Eastlake and Westlake Buildings, specifically targeting the shared plenum return between corridors and patient rooms, which currently violates healthcare occupancy requirements per NFPA 101 Section 19.3.6.2.1. The scope includes decommissioning the existing smoke control system, adding smoke dampers at corridor plenum return locations and in areas considered hazardous, and modifying fire alarm and HVAC system controls across multiple building levels (basement, first, second, and third floors).

The project involves extensive retrofitting of mechanical systems, including installing new Ruskin smoke dampers with 24V power and end switches, modifying ductwork, adding fire alarm output control modules, and implementing new control sequences for building automation systems. The drawings detail specific requirements for each floor, including smoke compartment modifications, damper installations, and fire/smoke barrier improvements. The retrofit is designed to enhance life safety by improving smoke containment, separating hazardous areas, and ensuring proper fire alarm and HVAC system responses during potential emergency events. The project appears to be a rebid, suggesting previous solicitations may have been unsuccessful, and includes alternate bid scopes to provide flexibility in implementation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET

G-001

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

ESH - EL & WL FIRE AND SMOKE CONTROL RETRO-COMMISSION

EASTERN STATE HOSPITAL

EASTLAKE BUILDING AND WESTLAKE BUILDING

850 MAPLE ST,

MEDICAL LAKE, WA 99022

MECHANICAL ENGINEER

Coffman Engineers 221 N Wall St, Suite 500 Spokane, WA 99201 509-328-2994 Scott Knecht, PE

VICINITY MAP

For: Department of Social and Health Services Owner: Department of Enterprise Services, Facilities Professional Services

ARCHITECT

ALSC Architects 203 N Washington, Suite 400 Spokane, WA 99201 509-838-8568 Todd Keller, AIA

SHEET INDEX

Sheet Number Sheet Title

G-001 COVER SHEET

A-100 OVERALL PLAN, PARTIAL PLANS, DOOR ELEVATION AND DETAILS

A-110 F WARD SMOKE BARRIER PLAN, UL DETAILS

A-111 UL ASSEMBLIES

M-001 GENERAL MECHANICAL NOTES, LEGENDS, AND SHEET INDEX

MD-101 EL LEVEL 1 NORTH DEMO

MD-102 EL LEVEL 2 NORTH DEMO

MD-103 EL LEVEL 3 NORTH DEMO

MD-104 EL BASEMENT SOUTH DEMO

MD-105 EL PENTHOUSE

M-201 EL BASEMENT SOUTH - ALTERNATE BID 1

M-202 EL BASEMENT MIDDLE - ALTERNATE BID 1

M-203 EL BASEMENT NORTH - ALTERNATE BID 1

M-204 EL LEVEL 1 SOUTH

M-205 EL LEVEL 1 MIDDLE

M-206 EL LEVEL 1 NORTH

M-207 EL LEVEL 2 SOUTH

M-208 EL LEVEL 2 MIDDLE

M-209 EL LEVEL 2 NORTH

M-210 EL LEVEL 3 SOUTH

M-211 EL LEVEL 3 MIDDLE

M-212 EL LEVEL 3 NORTH

M-501 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

FX-001 FIRE ALARM NOTES AND MATRIX

5-15-258-22-25

REBID

ESH - EL & WL FIRE AND SMOKE CONTROL RETRO-COMMISSION REBID

RN1-018

R N

-0

B R

N

-0

RAMP UP

UP

UP

UP

UP

UP

UP

RN1-018

R N

-0

B R

N

-0

RAMP UP

UP

UP

UP

UP

UP

UP

A-100

B3

LIGHT FIXT

2x2 EXIST HVAC DUCT

ABOVE CLG TO REMAIN

(DIAGONAL HATCH)

NEW POSITION

FOR SA GRILLE

NEW SMOKE BARRIER

WALL WITH DBL EGRESS

DOORS, FULL HT TO

STRUCTURE ABOVE

EXIST CEILING SPEAKER,

RELOCATE 2' WEST & 2'

SOUTH

FS = FIRE SPRINKLER

FA = FIRE ALARM

SD = SMOKE DETECTOR

REMOVE PORTION OF

EXIST ROUND HVAC DUCT

BACK TO RELOCATED

GRILLE POSITION (DASHED

LINES)

EXIST SA GRILLE,

RELOCATE TO WEST

SIDE OF CROSS

CORRIDOR DOORS

NEW POSITION

FOR SPEAKER

EXIST THRU-

WALL RA

OPENING

ABOVE CEILING

FS

FS

FA

SD

LIGHT FIXT

2x2

A6

A-100

A-100

B4

A-100

B5

A-100

B6

A-100

B3

PAIR 3'-8" x 7'-0" DBL

EGRESS HM DOORS

NON-RATED CLOSE

FITTING

REMOVE & REINSTALL

EXIST WALL GUARDS,

MODIFY FOR NEW WALL

/4

A-100

B6

SIM

CORRIDOR

S2-C004

CORRIDOR

S2-C003

CORRIDOR

S2-C002

S -C

PARALLEL ARM

CLOSER WITH

HOLD OPEN TIED

TO FIRE ALARM

24"x30"

VISION

PANEL

EXIST WALL

GUARDS, TYP EA

SIDE OF HALL

EXIST PIPES & CONDUITS

ABOVE CEILING

HVAC DUCT

FS PIPE

±9'-6"

CONC SLAB

±7'-10"

CEILING

18x40 SST

KICK PLATE

LC

10" 24" 10"

A6

A-100

PROVIDE FIRE STOPPING IN NEW

SMOKE BARRIER AT ALL

PENETRATIONS, TYP.

A-100

B1

A-100

B2

4"

EXIST CONC

WALL, VER

3 1/2" x 20

GA STUDS

5/8" GYP BD

1/2" FRT PLYWD

REINSTALL WALL

GUARDS

HM DOOR FRAME,

GROUT FILLED

/4

VER EXIST

WALL DEPTH

3 1/2" x 20

GA STUDS

5/8" GYP BD

1/2" FRT PLYWD

REINSTALL WALL

GUARDS

HM DOOR FRAME,

GROUT FILLED

4"

/4

REMOVE & SALVAGE

EXIST WALL GUARDS,

UPPER AND LOWER

REMOVE PORTION OF

EXIST MTL STUD WALL

WITH 1/2" PLYWD, 1/2"

GYP BD, & VENEER

PLASTER

A S

R E

Q U

IR

E

D

EXIST MTL STUD

WALL TO REMAIN

V E

R

±7'-2"

T.O. FRAME

/8

FIRE STOPPING

3 1/2" x 20

GA STUDS

5/8" GYP BD

J-MOLD

EXIST NON-RATED

ACOUST CLG PANEL,

REVISED FOR NEW

WALL CONSTRUCTION

HM DOOR FRAME,

GROUT FILLED

5 3/4"

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

REBID

2020-440 H (1-2)

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

WESTLAKE

BUILDING

850 MAPLE ST,

MEDICAL LAKE, WA 99022

2022-050

A-100

OVERALL

PLAN,

PARTIAL

PLANS, DOOR

ELEVATION

AND DETAILS

JTS

TMK

8/22/25

SCALE: 1/2" = 1'-0"B2

PARTIAL BASEMENT RCP

SCALE: 1/2" = 1'-0"B1

PARTIAL BASEMENT PLAN

N O

R T

H

N O

R T

H

SCALE: 1/2" = 1'-0"B3

DOOR ELEV @ CORRIDOR S2-C003

SCALE: 1/32" = 1'-0"A1

OVERALL BASEMENT FLOOR PLAN

SCALE: 3" = 1'-0"B5

N DOOR JAMB

SCALE: 3" = 1'-0"B4

S DOOR JAMB

SCALE: 3" = 1'-0"B6

EXIST WALL DEMO

N O

R T

H

SCALE: 3" = 1'-0"A6

DOOR HEAD

EASTLAKE

G201

G200

G255

G280G282 G281

G251

G272G267

G267T

G268

G269

G270

G271

G250

G254

G265

G266

G264

G261

G263

G262

F281F282

F280

F283

F241

F250

F236

F251

F242 F243

F276

F275F274

F285 F284

F260

F258

F273 F272

F272T

F271

F223

F222

F286

F270

F269

F221

F220 F259

F219

F253

F233

F254

F255

F200

F201

F203T F202

F203

F204

F204T F205T

F205

F218

F206

F217

F268 F267

F266

F216

F265

F257

F215 F264

F263

F262

F207

F208T

F207T

F208

F209

F210T

F209T

F210

F211

F212T

F211T

F212

F213

F213T

F214

F261

G260

F278 F279

F277 G253

F251 F251

VESTIBULE

SWITCHBOARD

CORRIDOR

MAIL ROOMOFFICE OFFICE

CORRIDOR

YELLOW CONFERENCE

ON-DUTY

RESIDENCE

TOILET

GPU MAILROOM

OFFICE

WOMENS TOILET

MENS TOILET

CORRIDR

CORRIDOR

STOR.

STOR.

OFFICE

OFFICE

DISASTER

SUPPLY

TOILET

TOILETTOILET

LAB. OFFICE

LAB. OFFICE

OFFICE

CORRIDOR

CHAPEL

CORRIDOR

TOILET TOILET

SPEECH / HEARING

LAB. OFFICEMALL CONFERENCE

LABORATORY LABORATORY

CORRIDOR

CORRIDOR

HOUSEKEEPING

STORAGE

DRESSING

ROOM

TOILET

X-RAY

ELEC.

LAUNDRY

LABORATORY

DARK ROOM

X-RAY OFFICE

PATIENT BATH

ISOLATION

CORRIDOR

MEDS ROOM

CORRIDOR

BEAUTY SHOP

CORRIDOR

CORRIDOR

STORAGE

PATIENT TOILET

TOILET ANTE

EQUIPMENT STORAGE

EQUIPMENT STORAGE

TOILET TOILET

EQUIPMENT STORAGE

NURSE STATION

SOLARIUM

CONFERENCE

STORAGE STORAGE

STORAGE

GALLEY

STORAGE

CORRIDOR

OFFICE DARK RM

DENTAL LAB.

DENTAL OFFICE

CORRIDOR

E WARD STORAGE

TOILET

TOILET

D WARD STORAGE

HMH STORAGE

TOILET

TOILET

EQUIPMENT STORAGE

HOUSEKEEPING

STORAGE

TOILET

TOILET

HOUSEKEEPING

STORAGE

HOUSEKEEPING

STORAGE

TOILET

JAN.

DENTAL OPERATORY

STORAGE

AUDIOLOGY OFFICE

SOUND

BOOTH

CORRIDOR

CORRIDOR CORRIDOR

102103

114115

112116

123123

127128

1-HOUR SMOKE BARRIER W/ 20 MON OPENINGS

LEGEND - WALL RATINGS

SEE UL ASSEMBLIES ON SHEET A-111 FOR

FIRESTOPPING DETAILS

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

REBID

2020-440 H (1-2)

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

WESTLAKE

BUILDING

850 MAPLE ST,

MEDICAL LAKE, WA 99022

2022-050

A-110

F WARD

SMOKE

BARRIER

PLAN, UL

DETAILS

TMK

TMK

8/22/25

PLAN NOTES

NUMBER DESCRIPTION

100 SEAL WALL TO DECK ALONG ENTIRE WALL WITH FIRESTOPPING

101 FIRE SEAL THREE CONDUIT PENETRATIONS WITH FIRESTOPPING

102 FIRE TAPE DRYWALL JOINTS

103 SEAL WALL TO BEAM THAT HAS EXISTING FIREPROOFING WITH FIRESTOPPING

104 ADD FIRESTOPPING TO 4 INCH PIPE, 1 INCH PIPE AND 1 INCH CABLE

PENETRATION

105 ADD RETAINING ANGLE TO DUCT, INFILL BETWEEN DUCT AND DECK TO

COMPLETE SMOKE BARRIER.

106 ADD RETAINING ANGLE TO DUCT, REMOVE FIRESTOPPING.

107 REPAIR DAMAGED DRYWALL AT CONDUIT PENETRATION

108 SEAL DRYWALL TO DECK, ADD FIRESTOPPING TO MULTIPLE CONDUIT

PENETRATIONS. SEAL WALL TO BEAM THAT HAS EXISTING SPRAY APPLIED

FIREPROOFING.

109 FIRE TAPE CORNER JOINT

110 FILL CABLE SLEEVES WITH FIRESTOPPING

111 SEAL THREE CONDUITS WITH FIRESTOPPING

112 FIRE TAPE DRYWALL JOINTS AND SEAL WALL TO DECK ENTIRE LENGTH OF

WALL.

113 SEAL DRYWALL AROUND ANGLE IRON

114 SEAL DRYWALL TO DECK AND COLUMN. SEAL THROUGH FLOOR PENETRATION

AT EXPANSION JOINT.

115 ADD FIRESTOPPING AT THREE PIPES AND ONE ANGLE IRON.

116 ADD RETAINING ANGLES TO TWO DUCTS

117 ADD FIRESTOPPING TO 3 PIPES, ADD RETAINING ANGLES TO ONE DUCT, SEAL

WALL TO DECK ENTIRE LENGTH OF WALL, SEAL WALL TO BEAM THAT HAS

EXISTING SPRAY APPLIED FIREPROOFING.

118 REMOVE FIRESTOPPING FROM RETAINING ANGLES, ADD RETAINING ANGLES

TO DUCT ONE SIDE, FILL VOID ABOVE DUCT TO COMPLETE WALL TO DECK.

119 FIRE TAPE DRYWALL JOINTS ALONG ENTIRE WALL, SEAL WALL TO DECK, SEAL

WALL TO BEAM THAT HAS EXISTING SPRAY APPLIED FIREPROOFING.

120 REMOVE FIRESTOPPING FROM DUCT RETAINING ANGLES, ADD RETAINING

ANGLE TO ONE SIDE OF DUCT, COMPLETE DRYWALL ABOVE DUCT TO DECK.

121 FIRE TAPE DRYWALL JOINT ALONG ENTIRE WALL, SEAL WALL TO DECK, SEAL

WALL TO BEAM THAT HAS EXISTING SPRAY APPLIED FIREPROOFING.

122 SEAL MULTIPLE CONDUIT PENETRATIONS AND ANGLE IRON PENETRATIONS

WITH FIRESTOPPING.

123 FIRE TAPE DRYWALL JOINTS ALONG ENTIRE WALL, SEAL WALL TO DECK

ALONG ENTIRE WALL, SEAL WALL TO BEAM THAT HAS EXISTING SPRAY

APPLIED FIREPROOFING.

124 REMOVE FIRESTOPPING FROM RETAINING ANGLES

125 ADD RETAINING ANGLES TO DUCT

126 ADD FIRESTOPPING TO MULTIPLE CONDUIT PENETRATIONS.

127 ADD RETAINING ANGLES TO DUCT, SECURE LOOSE DRYWALL TO SIDE AND

ABOVE DUCTWORK

128 SEAL JOINTS AND PENETRATIONS

129 PROPERLY REPAIR SMOKE BARRIER WHERE DRYWALL PATCHES EXIST

130 COMPLETE SMOKE BARRIER BETWEEN BEAM AND WALL.

131 ADD RETAINING ANGLES TO DUCTWORK

132 SEAL 20+/- PIPE AND CONDUIT PENETRATIONS WITH FIRESTOPPING

133 ALONG ENTIRE WALL SEAL WALL TO DECK AND BEAMS THAT HAVE EXISTING

SPRAY APPLIED FIREPROOFING

134 REPAIR AND FINISH DRYWALL IN CORNER TO MAINTAIN SMOKE BARRIER

135 ADD FIRESTOPPING BETWEEN TOP TRACK OF WALL AND BEAM

136 SEAL WALL TO VERTICAL BEAM WITH FIRESTOPPING

137 FIRE TAPE CORNER JOINT AND DRYWALL JOINTS, SEAL DRYWALL TO DECK

AND BEAM WITH FIRESTOPPING, ADD RETAINING ANGLES TO TWO SIDES OF

DUCT AND REPAIR ANGLE FALLING OFF THE BOTTOM, REMOVE FIRESTOPPING

FROM RETAINING ANGLES.

138 ADD RETAINING ANGLES AROUND 6 DUCT PENETRATIONS, SEAL MULTIPLE

PENETRATIONS WITH FIRESTOPPING AND SEAL WALL TO DECK AND BEAMS.

139 SEAL APPROXIMATELY 12 FEET OF WALL TO DECK, ADD RETAINING ANGLES TO

TWO DUCT PENETRATIONS, SEAL 10 +/- PENETRATIONS WITH FIRESTOPPING

140 SEAL DRYWALL TO DECK, FIRE TAPE DRYWALL JOINTS

141 ADD RETAINING ANGLES TO LARGE DUCT

142 SEAL 15 PENETRATIONS WITH FIRESTOPPING

143 SEAL WALL TO DECK WITH FIRESTOPPING BOTH SIDES

144 SEAL TOP TRACK TO DECK WITH FIRESTOPPING. REPAIR EXISTING DRYWALL

PATCHES WITH COMPLIANT SMOKE BARRIER REPAIRS.

145 SEAL WALL TO DECK AND BEAM ALONG ENTIRE WALL. WALL IS OFFSET FROM

BEAM APPROX. 8".

146 ADD DRYWALL WHERE NOT CONTINUOUS BEHIND BEAM BRACING

147 FIRE TAPE DRYWALL JOINTS, ADD FIRESTOPPING TO APPROX 5

PENETRATIONS.

SCALE: 1/8" = 1'-0"1

F WARD PARTIAL MAIN LEVEL PLAN

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

REBID

2020-440 H (1-2)

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

WESTLAKE

BUILDING

850 MAPLE ST,

MEDICAL LAKE, WA 99022

2022-050

A-111

UL

ASSEMBLIES

TMK

TMK

8/22/25

GENERAL

MECHANICAL

NOTES, LEGENDS,

AND SHEET

INDEX

M-001

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201ABBR

STANDARD ABBREVIATIONS

DESCRIPTION ABBR DESCRIPTION

A/E ARCHITECT/ENGINEER

AAV AUTOMATIC AIR VENT

ACH AIR CHANGES PER HOUR

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARCH ARCHITECT/ARCHITECTURAL

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

BAS BUILDING AUTOMATION SYSTEM

BD BACKDRAFT DAMPER

BFP BACK FLOW PREVENTER

BG BELOW GROUND

BHP BRAKE HORSEPOWER

BLDG BUILDING

BOD BOTTOM OF DUCT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

CONC CONCRETE

COND CONDENSER

CONN CONNECT/CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION

COP COEFFICIENT OF PERFORMANCE

CW COLD WATER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

DB DECIBEL or DRY BULB

DDC DIRECT DIGITAL CONTROL

DEMO DEMOLISH

DIA/Ø DIAMETER

DIM DIMENSION

DN DOWN

DWG DRAWING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDB ENTERING DRY BULB

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST GRILLE

ELEC ELECTRIC/ELECTRIAL

ELEV ELEVATION

EMCS ENERGY MANAGEMENT CONTROL

SYSTEM

ENCL ENCLOSURE

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

EWB ENTERING WET BULB

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

F FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN or FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FF FINAL FILTER

FLA FULL LOAD AMPS

FLR FLOOR

FP FIRE PROTECTION

FPM FEET PER MINUTE

FPI FINS PER INCH

FPS FEET PER SECOND

FS FLOOR SINK

FSD FIRE-SMOKE DAMPER

FT FEET or FLASH TANK

FV FACE VELOCITY

GA GAGE or GAUGE

GAL GALLONS

GALV GALVANIZED STEEL

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HC HEATING COIL

HEPA HIGH EFFICIENCY PARTICULATE AIR

HG HOT GAS

HP HORSEPOWER

HR HOUR

HTG HEATING

HVAC HEATING, VENTILATION, AND AIR

CONDITIONING

HW HOT WATER

HWC HOT WATER CIRCULATION

HX HEAT EXCHANGER

HZ HERTZ

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IE INVERT ELEVATION

IEEC INTERNATIONAL ENERGY

EFFICIENCY CODE

IFC INTERNATIONAL FIRE CODE

IMC INTERNATIONAL MECHANICAL CODE

IN INCHES

INSUL INSULATION

KW KILOWATT

KWH KILOWATT HOUR

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LDB LEAVING DRY BULB

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH THOUSAND BTU PER HOUR

MCA MINIMUM CIRCUIT AMPS

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM or MINUTES

MISC MISCELLANEOUS

MOCP MAXIMUM OVER CURRENT

PROTECTION

NA NOT APPLICABLE

NC NORMALLY CLOSED or NOISE

CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

ORD OVERFLOW ROOF DRAINAGE

OA or OSA OUTSIDE (SUPPLY) AIR

PD PRESSURE DROP

PG PROPYLENE GLYCOL

PH/Ø PHASE

PLBG PLUMBING

POC POINT OF CONNECTION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAGE

PT PRESSURE TEMPERATURE

RA RETURN AIR

REQD REQUIRED

REV REVISION(S)

RO REVERSE OSMOSIS

RPBP REDUCED PRESSURE BACKFLOW

PREVENTER

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SD SMOKE DETECTOR or SMOKE

DAMPER

SEER SEASONAL ENERGY EFFICIENCY

RATIO

SENS SENSIBLE

SF SUPPLY FAN or SQUARE FEET

SIM SIMILAR

SM SHEET METAL

SMACNA SHEET METAL AND AIR

CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SP STATIC PRESSURE

SPEC SPECIFICATION or SPECIFIED

SQ SQUARE

SQ FT SQUARE FEET

SS STAINLESS STEEL

STD STANDARD

TAB TEST, ADJUSTMENT & BALANCE

TC TEMPERATURE CONTROLS

TEMP TEMPERATURE

TP TRAP PRIMER or TEST PLUG

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UPC UNIFORM PLUMBING CODE

V VENTS OR VOLTS

VAC VACUUM or VOLTAGE ALTERNATING

CURRENT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

WB WET BULB

WC WATER CLOSET

WCO WALL CLEANOUT

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

W/ WITH

W/O WITHOUT

ZVB ZONE VALVE BOX

SD

H

T

AHU-1

P1-1

GENERAL LEGEND

SYMBOL DESCRIPTION

THIN LINEWORK INDICATES EXISTING

MEDIUM LINEWORK INDICATES NEW

THERMOSTAT OR TEMPERATURE SENSOR (WALL MOUNTED)

HUMIDISTAT OR HUMIDITY SENSOR (WALL MOUNTED)

DETAIL SYMBOL: A = IDENTIFYING NUMBER

B = SHEET WHERE DETAIL IS SHOWN

SECTION SYMBOL: A = IDENTIFYING LETTER

B = SHEET WHERE SECTION IS SHOWN

SECTION CUT LINE INDICATOR

THICK DASHED LINEWORK INDICATES

EXISTING TO BE DEMOLISHED

KEYED REFERENCE NOTE SPECIFIC TO LOCATION INDICATED

POINT OF CONNECTION (POC)

PLUMBING FIXTURE TAG (REFER TO SCHEDULE)

MECHANICAL EQUIPMENT TAG (REFER TO SCHEDULES)

REVISION CLOUD AND REVISION NUMBER

SMOKE DETECTOR

GENERAL NOTE APPLIES TO ENTIRE SHEETX.

EXISTING(E)

NEW(N)

RELOCATE(REL)

NEW LOCATION(NL)

CO2 CO2 SENSOR

GENERAL NOTES

2021 WA STATE ENERGY CODE NOTES

1. DOCUMENTS DESCRIBED IN SECTION C103.6, INCLUDING RECORD DOCUMENTS, MANUALS,

COMPLIANCE DOCUMENTATION, AND SYSTEM OPERATION TRAINING, SHALL BE PROVIDED TO THE

BUILDING OWNER OR OWNER'S AUTHORIZED AGENT WITHIN 90 DAYS OF THE DATE OF RECEIPT

OF THE CERTIFICATE OF OCCUPANCY.

2. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2.

3. PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AS REQUIRED BY SECTION C408.2.2.1.

4. COMMISSIONING (MECHANICAL SYSTEMS) SHALL BE PROVIDED AND A REPORT SHALL BE

SUBMITTED TO THE OWNER AS REQUIRED BY SECTION C408. PROVIDE A COMMISSIONING PLAN

PER C408.1.2.

5. MECHANICAL EQUIPMENT AND CONTROLS SHALL BE COMMISSIONED PER SECTION C408.2.

SYSTEM TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION C408.2.3.

CODES & AUTHORITIES HAVING JURISDICTION (AHJ)

THIS LIST IS FOR REFERENCE ONLY AND MAY NOT CONTAIN ALL CODES REQUIRED FOR THIS PROJECT OR LIST ALL AUTHORITIES HAVING JURISDICTION. CONTACT STATE, COUNTY AND CITY BUILDING

DEPARTMENT FOR A FULL AND ACCURATE LIST.

· 2021 INTERNATIONAL BUILDING CODE

· 2021 UNIFORM PLUMBING CODE

· 2020 NATIONAL ELECTRIC CODE

· 2021 WASHINGTON STATE ENERGY CODE

· 2021 INTERNATIONAL MECHANICAL CODE

· CODE AMENDMENTS SPECIFIC TO THE LOCAL & REGIONAL JURISDICTIONS

· STATE, COUNTY, CITY CODE AGENCIES & OFFICIALS

· 2014 FACILITY GUIDELINES INSTITUTE

HVAC DUCTWORK LEGEND

DUCTWORK

24x12 S/A

RECTANGULAR DUCT

SIZE (INCHES) FIRST

DIMENSION IS SIDE OF

DUCT SHOWN

DUCT SIZE

DUCT SYSTEM ABBREVIATION

(NOT ALWAYS BE SHOWN)

INSULATED DUCT

SOUND LINED DUCT

24x12ø

24ø ROUND DUCT

18ø24x12 CHANGE IN DUCT SIZE

AND/OR SHAPE

SUPPLY AIR (SA)

OUTSIDE AIR (OSA)

RECTANGULAR DUCT

TURNED UP/SECTION

ROUND/FLAT OVAL DUCT

TURNED UP/SECTION

RECTANGULAR DUCT

TURNED DOWN/AWAY

ROUND/FLAT OVAL DUCT

TURNED DOWN/AWAY

RETURN AIR (RA)

RECTANGULAR DUCT

TURNED UP/SECTION

ROUND/FLAT OVAL DUCT

TURNED UP/SECTION

RECTANGULAR DUCT

TURNED DOWN/AWAY

ROUND/FLAT OVAL DUCT

TURNED DOWN/AWAY

EXHAUST AIR (EA)

RECTANGULAR DUCT

TURNED UP/SECTION

ROUND/FLAT OVAL DUCT

TURNED UP/SECTION

RECTANGULAR DUCT

TURNED DOWN/AWAY

ROUND/FLAT OVAL DUCT

TURNED DOWN/AWAY

DAMPERS

VOLUME/BALANCING

DAMPER

FIRE DAMPER (FD)

SMOKE DAMPER (SD)

FIRE/SMOKE DAMPER

(FSD)

MOTORIZED FIRE/SMOKE

DAMPER

DUCT SYSTEM ABBREVIATIONS

SUPPLY AIRSA

OUTSIDE AIROSA

COMBUSTION AIRCA

RETURN AIRRA

TRANSFER AIRTA

EXHAUST AIREA

FLEXIBLE DUCT

DUCT SYMBOLS

DUCT END CAP

DUCT ACCESS DOOR

AD

SUPPLY AIR (SA)

TERMINAL

RETURN AIR (RA) OR

TRANSFER AIR (TA) TERMINAL

EXHAUST AIR (EA) TERMINAL

X

CFM

AIRFLOW DIRECTION

SOUND ATTENUATOR

DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS OF DUCT. DUCT SIZE

SHOWN DOES NOT INCLUDE INSULATION OR LINING UNLESS NOTED OTHERWISE. SEE

BELOW FOR DUCT SIZE TAG LEGEND.

GRILLE, REGISTER, OR OPEN

DUCT

AIR TERMINAL

IDENTIFICATION

FLAT OVAL DUCT SIZE

(INCHES) FIRST

DIMENSION IS SIDE OF

DUCT SHOWN

M S

S

S

AOM ALARM OUTPUT

CONTROL MODULE

FIRE ALARM SCOPE DESCRIPTION

THE PURPOSE OF THIS PROJECT IS TO ADDRESS EXISTING CONDITIONS WITHIN THE EAST

LAKE BUILDING AT EASTERN STATE HOSPITAL. THE BUILDING CURRENTLY FEATURES A

SHARED PLENUM RETURN BETWEEN THE CORRIDOR AND PATIENT ROOMS / HAZARDOUS

AREAS, WHICH IS PROHIBITED IN EXISTING HEALTHCARE OCCUPANCIES PER NFPA 101

SECTION 19.3.6.2.1.

PER COFFMAN'S FIRE PROTECTION AND LIFE SAFETY ASSESSMENT REPORT, THE EXISTING

SMOKE CONTROL SYSTEM DOES NOT PROVIDE EXHAUST FROM THE FIRE FLOOR NOR

PRESSURIZATION TO THE ADJACENT AREAS AND DOES NOT MEET THE DEFINITION OF AN

NFPA 92 SMOKE CONTROL SYSTEM; THEREFORE, COFFMAN RECOMMENDS

DECOMMISSIONING THE EXISTING SMOKE CONTROL SYSTEM, ELEVATOR PRESSURIZATION

SYSTEM, AND ADDING SMOKE DAMPERS AT THE FOLLOWING LOCATIONS. TO CORRIDOR

PLENUM RETURN LOCATIONS, THE RETURN FROM AREAS THAT ARE CONSIDERED

HAZARDOUS IN ACCORDANCE WITH NFPA 101 SEC. 19.3.2.1, AND EXISTING SHAFTS WITH

UNPROTECTED OPENINGS.

FIRE ALARM GENERAL NOTES

5-15-258-22-25

11,385 SF

SMOKE COMPARTMENT

6,990 SF

SMOKE

COMPARTMENT

"1N2" SEGMENT

1N1 - CORE

"1N3" SEGMENT

"1N3/N3" CORE

AHU-5

AHU-2

1P3-16

1P3-15

1N3-10

1N3-10

M S

S M

M S

M S

M S

M S

S

S

S

S

SS S S

SS

SS

SS

S

S

S

S

SS

S

S

DH

DH

DH

DH

THIS IS NOT AN EXIT STAIR

FACP GAMEWELL

FACP GAMEWELL

EL LEVEL 1

NORTH DEMO

MD-101

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

1 EL LEVEL 1 NORTH DEMO

SCALE: 3/32"=1'-0"

N

EASTERN STATE HOSPITAL

FIRST FLOOR KEY PLAN

1S1 1A

1S2

1N1 1N2

1N3

1SE

KEY NOTES

1. REMOVE FIRE ALARM OUTPUT CONTROL MODULES FOR ZONE A, B, AND C.

THEN REMOVE THE SMOKE CONTROL SEQUENCE FROM THE DDC

CONTROLS FOR AHU 5, 6, AND 7.

2. WIRE DAMPER OPEN, REMOVE MOTORIZED ACTUATOR, DEMO

ELECTRICAL BACK TO SOURCE, AND DEMO PURPLE CONTROL WIRES

BACK TO DDC CONTROLS LOCATED INSIDE THE AHU MECHANICAL ROOM.

LABEL DAMPER AS "ABANDONED - NOT IN USE"

GENERAL DEMO NOTES

A. NOT USED.

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

PATIENT-CARE SUITE

(E) 1P3-11

(E) 1P3-14

(E) 1P3-20

6,990 SF

SMOKE COMPARTMENT

SMOKE

COMPARTMENT

"2N2" SEGMENT

"2N3" SEGMENT

2N1 CORE

"2N3/N3" CORE

202 T-STATS

AH-3

AHU-6

2N3-XX 1a?

2P3-23

2P3-16

2P3-17

M S

S M

M S

M S

M S

M S

SS S

S

S

S SS

S

S

S

THIS IS NOT AN EXIT STAIR

DH

DH

DH

DH

DH

DH

FACP GAMEWELL

FACP GAMEWELL

EL LEVEL 2

NORTH DEMO

MD-102

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

1 EL LEVEL 2 NORTH DEMO

SCALE: 3/32"=1'-0"

N

EASTERN STATE HOSPITAL

SECOND FLOOR KEY PLAN

2S1 2A

2S2

2N1 2N2

2N3

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

PATIENT-CARE SUITE

KEY NOTES

1. REMOVE FIRE ALARM OUTPUT CONTROL MODULES FOR ZONE A, B, AND C.

THEN REMOVE THE SMOKE CONTROL SEQUENCE FROM THE DDC

CONTROLS FOR AHU 5, 6, AND 7.

2. WIRE DAMPER OPEN, REMOVE MOTORIZED ACTUATOR, DEMO

ELECTRICAL BACK TO SOURCE, AND DEMO PURPLE CONTROL WIRES

BACK TO DDC CONTROLS LOCATED INSIDE THE AHU MECHANICAL ROOM.

LABEL DAMPER AS "ABANDONED - NOT IN USE"

GENERAL DEMO NOTES

A. NOT USED.

(E) 2P3-3

(E) 2P3-15

(E) 2P3-21

6,990 SF

SMOKE

COMPARTMENT

"3N2" SEGMENT

3N1 CORE

"3N3" SEGMENT

"3N3/N3" CORE

AH-7

3P3-16

3P3-17

M S

S M

M S

M S

M S

M S

S

SS

S

S

S S

S

S

S

S

SS

S

S

THIS IS NOT AN EXIT STAIR

DH

DH

DH

DH

S

FACP GAMEWELL

FACP GAMEWELL

EL LEVEL 3

NORTH DEMO

MD-103

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

1 EL LEVEL 3 NORTH DEMO

SCALE: 3/32"=1'-0"

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

N

EASTERN STATE HOSPITAL

THIRD FLOOR KEY PLAN

3S

3N1 3N23AS3S1 3AN3A

3S

PATIENT-CARE SUITE

KEY NOTES

1. REMOVE FIRE ALARM OUTPUT CONTROL MODULES FOR ZONE A, B, AND C.

THEN REMOVE THE SMOKE CONTROL SEQUENCE FROM THE DDC

CONTROLS FOR AHU 5, 6, AND 7.

2. WIRE DAMPER OPEN, REMOVE MOTORIZED ACTUATOR, DEMO

ELECTRICAL BACK TO SOURCE, AND DEMO PURPLE CONTROL WIRES

BACK TO DDC CONTROLS LOCATED INSIDE THE AHU MECHANICAL ROOM.

LABEL DAMPER AS "ABANDONED - NOT IN USE"

GENERAL DEMO NOTES

A. NOT USED.

(E) 3P3-5

(E) 3P3-15

(E) 3P3-21

13551 SF

7797 SF

SMOKE COMPARTMENT

SMOKE COMPARTMENT

"0S1" SEGMENT

"0S2" SEGMENT

FSU ADMISSIONS

AH-10

S

SSS

FACP SIMPLEX

EL BASEMENT

SOUTH DEMO

MD-104

MRN

TAH

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

1 EL BASEMENT SOUTH DEMO

SCALE: 3/32"=1'-0"

N BASEMENT KEY PLAN

EASTERN STATE HOSPITAL

0S1 0SA

0S2

0N1 0N2

0N3

0SE

KEY NOTES

1. NOT USED.

GENERAL DEMO NOTES

A. NOT USED.

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

PATIENT-CARE SUITE

(E) FAN

UP TO ROOF COWL

EL PENTHOUSE

MD-105

JTT

SDK

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

1 EL PENTHOUSE

SCALE: 1/2"=1'-0"

GENERAL NOTES

KEY NOTES

1. DEMO EXISTING SMOKE PRESSURIZATION FAN, CONTROLS, AND

ELECTRICAL BACK TO SOURCE.

2. DEMO DUCTWORK TO ROOF AND CAP WATER TIGHT.

3. DEMO FIRE ALARM OUTPUT CONTROL MODULES AND REMOVE ELEVATOR

PRESSURIZATION SEQUENCE FROM FIRE ALARM SYSTEM PROGRAMMING.

1. DEMO THE FIRE FIGHTERS OVERRIDE PANEL (USED FOR MANUAL

ELEVATOR PRESSURIZATION) THAT IS LOCATED IN THE SWITCHBOARD

ROOM AT THE HOSPITAL MAIN ENTRANCE. PATCH AND PAINT WALLS AND

CEILINGS TO MATCH EXISTING.

13551 SF

7797 SF

SMOKE COMPARTMENT

SMOKE COMPARTMENT

"0S1" SEGMENT

"0S2" SEGMENT

FSU ADMISSIONS

AH-10

S

SSS

FACP SIMPLEX

LOCATION OF NEW

CORRIDOR DOOR

S

S

S

S

SS

S

S

S

S

S

S

AOM

AOM

AOM

AOM

AOM

AOM

AOM

AOM

AOM

AOM

AOM AOM

18x10

18x10

18x10

18x10

40x14

18x10

32x10

16x10

18x10

18x10

36x16 18x10

1 EL BASEMENT SOUTH - ALTERNATE BID 1

SCALE: 3/32"=1'-0"

EL BASEMENT

SOUTH -

ALTERNATE BID 1

M-201

JTT

SDK

N BASEMENT KEY PLAN

EASTERN STATE HOSPITAL

0S1 0SA

0S2

0N1 0N2

0N3

0SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

2. PROVIDE AND INSTALL A NEW SMOKE DAMPER, DUCT DETECTOR, AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

OP3-53

OP3-54

OP3-55

OP3-57

OP3-58

OP3-59

OP3-61

OP3-62

OP3-63

OP3-64

OP3-65

OP3-66

PATIENT-CARE SUITE

5462 SF

SMOKE COMPARTMENT"0A" SEGMENT

"0N1" SEGMENT

SS

S

S

DH

DH

DH

S

S

S

S

AOM

AOM

AOM

AOM

AOM

S

18x10

18x10 16x10 21x10

48x4

26x12

1 EL BASEMENT MIDDLE - ALTERNATE BID 1

SCALE: 3/32"=1'-0"

EL BASEMENT

MIDDLE -

ALTERNATE BID 1

M-202

JTT

SDK

N BASEMENT KEY PLAN

EASTERN STATE HOSPITAL

0S1 0SA

0S2

0N1 0N2

0N3

0SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

2OP3-20

OP3-19

OP3-18

OP3-51

OP3-52

PATIENT-CARE SUITE

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

2. REPLACE EXISTING FIRE DAMPER WITH A NEW SMOKE DAMPER. PROVIDE

AND INSTALL A NEW DUCT DETECTOR AND FIRE ALARM OUTPUT

CONTROL MODULE WITHIN 3 FEET OF THE NEW SMOKE DAMPER.

16983 SF

7690 SF

SMOKE COMPARTMENT

SMOKE

COMPARTMENT

"0N2" SEGMENT

"0N3" SEGMENT

APU ADMISSIONS

AHU-1

AH-4

ELEVATOR

CONTROL

RELAY'S

SS

SSS

S

S

S

DH

DH

THIS IS NOT AN EXIT STAIR

FACP GAMEWELL

FACP GAMEWELL

S

S

S

S

S

S

S

S

S

S

AOM

AOM

AOM AOM

AOM

AOM

AOM

AOM

AOM

AOM

S

AOM

24x5

50x10

12x10

1 EL BASEMENT NORTH - ALTERNATE BID 1

SCALE: 3/32"=1'-0"

EL BASEMENT

NORTH -

ALTERNATE BID 1

M-203

JTT

SDK

N BASEMENT KEY PLAN

EASTERN STATE HOSPITAL

0S1 0SA

0S2

0N1 0N2

0N3

0SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

2 ON-8

ON-1D

ON-17A

OP3-2OP3-3

OP3-45

OP3-46

OP3-47

OP3-48

OP3-49

OP3-50

PATIENT-CARE SUITE

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

2. REPLACE EXISTING FIRE DAMPER WITH A NEW SMOKE DAMPER. PROVIDE

AND INSTALL A NEW DUCT DETECTOR AND FIRE ALARM OUTPUT

CONTROL MODULE WITHIN 3 FEET OF THE NEW SMOKE DAMPER.

9,170 SF

7,085 SF

SMOKE COMPARTMENT

SMOKE COMPARTMENT

"1S2" SEGMENT

"1S1" SEGMENT

AHU-15

AHU-11

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

DH

S

S

DH

FACP SIMPLEX

S

S

SS

S

AOM

AOM

AOM AOM

AOM

18x10

18x1018x10 18x10

18x10

1 EL LEVEL 1 SOUTH

SCALE: 3/32"=1'-0"

EL LEVEL 1

SOUTH

M-204

JTT

SDK

N

EASTERN STATE HOSPITAL

FIRST FLOOR KEY PLAN

1S1 1A

1S2

1N1 1N2

1N3

1SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

1 1 1

1P3-39

1P3-401P3-411P3-42

1P3-43

PATIENT-CARE SUITE

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

6,045 SF

"1A" SEGMENT

"1N1" SEGMENT

S

S

S

S

S

S

S

S

AOM

AOM

AOM

30x8

12x6 16Ø

1 EL LEVEL 1 MIDDLE

SCALE: 3/32"=1'-0"

EL LEVEL 1

MIDDLE

M-205

JTT

SDK

N

EASTERN STATE HOSPITAL

FIRST FLOOR KEY PLAN

1S1 1A

1S2

1N1 1N2

1N3

1SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

2. REPLACE EXISTING FIRE DAMPER WITH A NEW SMOKE DAMPER. PROVIDE

AND INSTALL A NEW DUCT DETECTOR AND FIRE ALARM OUTPUT

CONTROL MODULE WITHIN 3 FEET OF THE NEW SMOKE DAMPER.

3. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE DIFFUSER TO ACCOMMODATE A NEW COMBINATION

FIRE/SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR

AND FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

FIRE/SMOKE DAMPER.

(E) 1P3-01c 1P3-01C

1P3-37

1P3-38

PATIENT-CARE SUITE

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

6,990 SF

SMOKE

COMPARTMENT

"1N2" SEGMENT

1N1 - CORE

"1N3" SEGMENT

"1N3/N3" CORE

AHU-5

AHU-2

M S

S M

M S

M S

M S

M S

S

S

S

S

SS S S

SS

SS

SS

S

S

S

S

SS

S

S

DH

DH

DH

DH

THIS IS NOT AN EXIT STAIR

FACP GAMEWELL

FACP GAMEWELL

S

S

S

AOM

AOM

AOM

S

S

S

S

S

AOM

AOM

AOM

AOM

AOM

AOM

AOM

DH

DH

DH

S

AOM

AOM

AOM

22x10

38x14

5Ø

10x8

10x8

18x10

1 EL LEVEL 1 NORTH

SCALE: 3/32"=1'-0"

EL LEVEL 1

NORTH

M-206

JTT

SDK

N

EASTERN STATE HOSPITAL

FIRST FLOOR KEY PLAN

1S1 1A

1S2

1N1 1N2

1N3

1SE

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

KEY NOTES

1. PROVIDE AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE

DUCT FROM THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW

SMOKE DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND

FIRE ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW

SMOKE DAMPER.

2. REPLACE EXISTING FIRE DAMPER WITH A NEW SMOKE DAMPER. PROVIDE

AND INSTALL A NEW DUCT DETECTOR AND FIRE ALARM OUTPUT

CONTROL MODULE WITHIN 3 FEET OF THE NEW SMOKE DAMPER.

3. PROVIDE AND INSTALL A NEW DOOR HOLDER AND FIRE ALARM OUTPUT

CONTROL MODULE. REINSTALL THE AUTOMATIC DOOR CLOSER.

4. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF THE EXISTING FIRE/SMOKE DAMPER.

5. REPLACE EXISTING FIRE DAMPER WITH A NEW SMOKE DAMPER. PROVIDE

AND INSTALL MINIMUM 3 FEET OF 26 GAUGE NON FLEXIBLE DUCT FROM

THE RETURN AIR CEILING GRILLE TO ACCOMMODATE A NEW SMOKE

DAMPER. PROVIDE AND INSTALL A NEW DUCT DETECTOR AND FIRE

ALARM OUTPUT CONTROL MODULE WITHIN 3 FEET OF THE NEW SMOKE

DAMPER.

1N1-1A

1P3-16

1P3-21

1P3-15

1P3-11

1P3-01I 1P3-34

1P3-35

1P3-36

PATIENT-CARE SUITE

(E) 1P3-19

(E) 1P3-18

(E) 1P3-17

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY EASTERN STATE HOSPITAL IS REQUIRED AT

ALL TIMES.

G. ALL WORK SHALL BE CLEANED AND SECURED AT THE END OF THE SHIFT

SO THAT A PATIENT CAN SAFELY RETURN TO THEIR ROOM.

H. SEAL ALL PENETRATIONS IN EXISTING FIRE PARTITIONS AT THE TIME

THAT THE PENETRATION IS IDENTIFIED/CREATED. HILTI PRODUCTS ONLY.

CONTRACTOR SHALL COMPLY WITH ALL FACILITY REQUIREMENTS FOR

DOCUMENTING AND COMPLETING FIRE STOPPING. ALL NEW WORK

PENETRATIONS AND THOSE RELATED TO DEMOLISHING OF EXISTING

DUCTS/DAMPERS SHALL BE SEALED. ANY EXISTING PENETRATIONS

FOUND DURING THE PROJECT THAT ARE NOT FIRE SEALED SHALL BE

ADDED TO A LOG INDICATING THE LOCATION AND TYPE OF PENETRATION

NEEDING ADDRESSED. THE LOG SHOULD BE TURNED OVER TO THE

ENGINEER OF RECORD AT THE END OF EACH WEEK.

I. PROVIDE AND INSTALL 24" X 24" FIRE RATED ACCESS PANELS THAT LOCK

IN ALL LOCATIONS WHERE NEEDED FOR ACCESS TO NEW SMOKE

DAMPERS.

J. FIELD VERIFY ALL (E) DUCT SIZES PRIOR TO ORDERING DAMPERS.

9,170 SF

SMOKE COMPARTMENT

SMOKE COMPARTMENT

"2S2" SEGMENT

"2S1" SEGMENT

AHU-16

AHU-12

S

S

S

S

S

S

DH

DH

S

S S

S

S

S

S

S

S

S

S

S

S

FACP SIMPLEX

S

SS

S

S

S

AOM

AOM

AOM

AOM AOM

AOM

18x10

18x1018x10

18x10

18x10

1 EL LEVEL 2 SOUTH

SCALE: 3/32"=1'-0"

EL LEVEL 2

SOUTH

M-207

JTT

SDK

N

EASTERN STATE HOSPITAL

SECOND FLOOR KEY PLAN

2S1 2A

2S2

2N1 2N2

2N3

REV DATE DESCRIPTION

PROJ. NO.

DRAWN

CHECKED

DATE

COFFMAN ENGINEERS INC.C

EASTERN STATE

HOSPITAL

EASTLAKE

BUILDING

850 MAPLE ST

MEDICAL LAKE, WA 99022

ESH - EL & WL: FIRE

AND SMOKE CONTROL

RETRO-COMMISSION

2020-440 H (1-2)

192591

8/22/25

SHEET TITLE:

SHEET NO:

A

B

C

D

A

B

C

D

E

E

2 3 4 5 6

2 3 4 5 6

BID DOCUMENTS

www.coffman.com ph 509.328.2994

221 N. Wall Street, Suite 500 Spokane, WA 99201

2-HOUR OCCUPANCY SEPARATION OR

3-HOUR FIRE WALL, 3-HR OPENINGS

LEGEND - WALL RATINGS

SHAFT ENCLOSURE, 90-MIN OPENINGS

1-HOUR FIRE BARRIER:

NON-RATED SMOKE PARTITION PROVIDED TO HAZARDOUS

= NEW HEALTHCARE AT HAZARDOUS LOCATIONS

HAZARDOUS LOCATIONS (SEE KEY NOTES 6 & 7)

SMOKE BARRIER AT SMOKE COMPARTMENTS:

= 1-HR AT NEW HEALTHCARE WITH 20-MIN OPENINGS

NOTE: THIS ONLY OCCURS BETWEEN BLDGS

= EXISTING HEALTHCARE FOR VARIOUS HAZARDS

= 30-MIN AT EXISTING HEALTHCARE W/ SELF-CLOSING DOORS

(ELEVATOR MACHINE ROOM, ELECTRICAL ROOMS,

2-HOUR FIRE/SMOKE BARRIER AT INTERFACE OF SHAFT

ENCLOSURE AND SMOKE COMPARTMENT

NON-PATIENT-CARE SUITE

AREAS IN EXISTING HEALTHCARE

GARAGE, AND LAUNDRY COLLECTION)

1 1

2P3-46

2P3-47

2P3-48 2P3-492P3-50

2P3-51

PATIENT-CARE SUITE

GENERAL NOTES

A. PROVIDE AND INSTALL A NEW FIRE ALARM OUTPUT CONTROL MODULE

WITHIN 3 FEET OF EACH NEW SMOKE DAMPER.

B. SHUT DOWN HVAC UNITS IN ACCORDANCE WITH THE INTERNATIONAL

MECHANICAL CODE AND FIRE ALARM MATRIX.

C. SMOKE DAMPERS MUST BE PROGRAMMED TO CLOSE ON ANY ALARM

AND IN ACCORDANCE WITH THE FIRE ALARM MATRIX.

D. PROVIDE ALL NECESSARY DUCT TRANSITIONS, FLANGES, AND GASKETS

TO INSTALL AND SEAL NEW DAMPERS IN EXISTING DUCTWORK.

E. CEILING TILES ARE SECURED WITH SECURITY CLIPS AND MUST BE

REMOVED AND REPLACED WHEN ACCESS IS NEEDED. CONTRACTOR

SHALL REPLACE ANY DAMAGED TILES AND CLIPS. ALL TILES MUST BE

SECURED IN PATIENT SPACES AT THE END OF EACH SHIFT BEFORE

PATIENTS ARE ALLOWED BACK IN THE SPACE.

F. AN ESCORT PROVIDED BY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .