3-ECPA-2026117 Pricing Workbook - Campus Physical Security Building Hardening.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Campus Physical Security & Building Hardening
Solicitation number
ECPA-2026117
Issued by
Indiana

About this file

This is a pricing workbook for the Campus Physical Security & Building Hardening contract opportunity issued by the Educational Cooperative Purchasing Alliance (ECPA) as the Lead Contracting Agency in collaboration with Edge Public. The solicitation seeks qualified vendors to supply campus physical security and building hardening solutions to participating public agencies nationwide. The workbook requires vendors to complete multiple tabs detailing vendor information, product pricing, installation and labor pricing, additional services, contract terms, and sample project scenarios. Vendors may propose on one or more of four workstreams and must provide both standard list prices and proposed ECPA contract prices with discount percentages clearly identified. The pricing workbook includes sample scenarios for evaluation purposes, covering classroom door hardening, exterior entryway improvements, window protection, security vestibules, perimeter protection with bollards, and facility assessments. All applicable pricing fields must be completed, with vendors required to itemize product, delivery, installation, labor, project management, assessment, engineering, maintenance, and other charges separately.

Vendors must disclose all fees, surcharges, minimum charges, exclusions, and assumptions that participating districts may incur. The workbook requires vendors to provide pricing validity periods, effective dates, minimum order quantities, minimum project charges, and information regarding installation services and subcontractor usage. Vendors must explain their pricing maintenance methodology during the initial contract term and any renewal periods, including proposed annual price increase percentages and whether the ECPA discount remains in effect during renewals. The pricing must reflect whether discounts are applied to current list prices or fixed price schedules, and vendors must address whether ECPA districts receive pricing equal to or better than similarly situated public-sector customers. Additional pricing disclosures are required regarding volume discounts, price matching, freight inclusion, geographic restrictions, sourcing through other vendors, customization charges, and the ability to combine ECPA pricing with manufacturer promotions or rebates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Info

ECPA | Campus Physical Security & Building Hardening
VENDOR INFORMATION
Legal vendor name
DBA / trade name
Primary proposal contact
Title
Email
Phone
Website
Manufacturer(s) represented
Role (manufacturer / authorized dealer / distributor / installer / other)
Workstream(s) proposed (1–4)
Geographic service area
Pricing validity period (days)
Pricing effective date
Minimum order quantity / minimum project charge
Minimum purchase or annual commitment, if any
Installation services offered? (Yes/No)
Subcontractors or installation partners used? (Yes/No)
PRICING INSTRUCTIONS
1. Complete all applicable tabs and rows. Vendors may propose on one or more Workstreams (1–4).
2. Provide standard list price and proposed ECPA contract price; identify the discount and its basis.
3. Itemize product, delivery, installation, labor, project management, assessment, engineering, maintenance, and other charges separately.
4. Disclose all fees, surcharges, minimum charges, exclusions, assumptions, and costs a district may incur.
5. If not offered, enter 'Not Offered.' If included at no charge, enter '$0 / Included.' If project-specific, explain the method and provide rates where possible.
6. Do not leave applicable pricing fields blank. Use 'N/A' only when a field does not apply.
7. Complete the pricing validity and adjustment information on Tab 5.
8. Sample scenarios on Tab 6 are for consistent evaluation. Complete applicable scenarios and state assumptions.

Product Pricing

PRODUCT PRICING SCHEDULE
Enter each proposed product on a separate row. Add rows as needed; use consistent units and identify product-specific performance documentation.
WorkstreamManufacturerProduct name / modelProduct descriptionSpecifications / performance rating / standardUnit of measureStandard list price ($)ECPA discount (%)ECPA contract price ($)
Unknown Author: Calculated as standard list price × (1 − ECPA discount). Enter discount as a percentage, e.g. 15%.Options / accessories / notesMinimum order qty.Lead time (days)Warranty (years)Product URL / document reference

Installation Labor

INSTALLATION & LABOR PRICING
Provide fixed unit rates wherever possible. Identify when rates vary by product, site conditions, geography, schedule, or project size.
Service / labor categoryUnit of measureStandard rate ($)ECPA discount (%)ECPA contract rate ($)Minimum charge ($)Conditions / exclusions / notesPerformed by (employee / subcontractor / partner)
General installation laborPer hour
Skilled / specialized installation laborPer hour
Project managerPer hour
Site assessmentPer visit
Measurement / field verificationPer visit
Engineering / design servicesPer hour
Door hardware installationPer door
Door / frame reinforcement installationPer opening
Window film installationPer sq. ft.
Protective panel installationPer sq. ft.
Bollard installationPer unit
Travel / mobilizationPer trip
Equipment rentalPer day
Removal / disposal of existing materialsPer unit or hour
After-hours / weekend installation premiumPercent or hourly rate
Other (describe)

Additional Services

ADDITIONAL SERVICES & OPTIONAL COSTS
List optional, recurring, ancillary, and project-related services. Disclose whether each is included, separately priced, or not offered.
Service / optional costUnit of measureStandard price ($)ECPA discount (%)ECPA price ($)Status (Included / Separate / Not offered)Description / conditions / exclusionsFrequency / expected timing
Facility security assessmentPer building
Physical security recommendations / reportPer building
Architectural consultationPer hour
Engineering consultationPer hour
Custom design servicesPer project
Routine product inspectionPer visit
Preventive maintenancePer visit
Repair servicesPer hour
Replacement partsBy item
Emergency service callPer visit
Expedited shippingPer order
Removal / disposalPer unit
Additional trainingPer session
Other (describe)

Contract & Renewals

CONTRACT PRICING & RENEWAL SCHEDULE
Explain how prices and discounts will be maintained during the initial term and any renewal periods. Attach supporting schedules as needed.
Pricing / contract topicVendor responseSupporting detail / assumptions
Initial contract pricing period / firm-price period
Pricing effective date
Pricing validity period for quotes (days)
Proposed annual price increase (%)
Maximum annual increase, if any (%)
Basis / index used for price increases
Advance notice required before price changes (days)
Are price increases subject to ECPA approval? Explain.
Does ECPA discount remain in effect during renewals?
Is discount applied to current list price or fixed price schedule?
Can manufacturer list prices change during contract term?
How are existing district quotes / purchase orders protected?
Are project quotes held firm? If yes, for how many days?
Renewal pricing methodology
Product substitutions / discontinuations and pricing impact
Do ECPA districts receive pricing equal to or better than similarly situated public-sector customers?
Other pricing conditions, exclusions, or protections

Project Scenarios

SAMPLE PROJECT COST SCENARIOS
Complete only scenarios applicable to proposed products/services. Use ECPA contract pricing. Identify assumptions and mark non-applicable scenarios 'N/A'. Enter Years 2–5 maintenance, inspection, or other recurring costs in column J; column K calculates the 5-year total cost of ownership.
ScenarioDescription / assumed quantityProduct/material cost ($)Installation/labor ($)Delivery/freight ($)Other fees ($)Total project cost ($)Assumptions / exclusions / proposed productsApplicable? (Yes/No/N/A)Years 2–5 maintenance / recurring cost ($)5-Year TCO ($)
1. Classroom door hardeningPurchase and installation of security improvements for 10 classroom doors.
2. Exterior entryway improvementsSecurity improvements for 5 exterior door openings.
3. Window protectionPurchase and installation of 1,000 square feet of protective window film.
4. Security vestibulePhysical security improvements to one main entrance / reception area.
5. Perimeter protectionPurchase and installation of 10 vehicle-protection bollards.
6. Facility assessmentAssessment and recommendations for one school building.
ADDITIONAL PRICING DISCLOSURES
Are there additional fees, surcharges, or charges not identified elsewhere?
Are there circumstances under which a district would not receive ECPA pricing?
Are additional volume or districtwide project discounts available?
Do you offer price matching or additional discounts for lower comparable public-sector pricing?
Are freight and delivery charges included in product prices?
Are there geographic restrictions or additional charges for any states or regions?
Are any products or services sourced through another vendor?
Are customized products or nonstandard installations subject to additional charges?
Can ECPA pricing be combined with manufacturer promotions, rebates, or other discounts?

File details come from the government source that posted it. Updated .