3._SOW_MK_41_VLS_ISEA_29-June_2022_Final.pdf
PDF 430 KB Posted
- Attached to
- MK 41 VLS ISEA Support Federal contract opportunity
- Solicitation number
- N63394-22-R-0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MK_41_VLS_ISEA_Sources_Sought_Notice.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
For
MK41 Vertical Launching System (VLS)
In-Service Engineering Agent (ISEA)
Prepared by
Naval Surface Warfare Center Port Hueneme Division (NSWC PHD)
1.0 Scope…………………………………………………………………………………
1.1 Location……………………….………………………………………………
2.0 Applicable Documents………..…………………………………….………….….…….5
3.0 Requirements…………………………………………………….….…………………
3.1 General
Requirements……………………………………………….…………….………
3.2 Specific
Requirements………………………………………………………………….…
3.2.1 MK 41 VLS Life Cycle ISEA
Support………………………….………………………………….…
3.2.2 MK 41 VLS Latch Rod
Adjustment………….………………………………………….……….…9
3.2.3 MK 41 VLS Cell and Uptake Hatch
Refurbishment...…………………….…………………………………
3.2.4 MK 41 VLS Deluge
Overhaul……..……………………………………….…
3.2.5 MK 41 VLS Hardware Fabrication Upgrading and
Testing……………………………………………………………...……..11
3.2.6 MK 41 VLS Component Refurbishment and
Testing.…………………………………………………………………….12
3.3 Travel
Requirements………………………………………………………………………..…13
3.3.1 Travel
Locations………………………………………………………………
Appendix A-
Deliverables…………………………………………………………………………
Appendix B -
Acronyms…...………………………………………………………………………….………..…20
1.0 SCOPE
This procurement will result in a Contract that shall provide MK 41 VLS ISEA support.
Specifics are as follows: Latch Rod Adjustment, Cell Hatch Refurbishment, Deluge Valve
Overhaul, and Engineering and Technical Services in support of the Navy Modernization
Programs of Hull, Mechanical and Electrical (HM&E) Systems. The system includes the weapon system and the associated HM&E support requirement. The services being requested require a certified MK 41 VLS System Maintenance Technician (SMT) or Test
Director (TD), which is a qualification granted by PEO IWS 3L. Only Naval Sea System
Command (NAVSEA) certified TDs, SMTs, and Navy Vertical Launch Systems Advanced
Technicians (VATS) are permitted to perform procedures other than those in basic shipboard documents (i.e. Tech Manuals, MRCs, and UMRCs). The company that is awarded this contact should be able to perform all tasks and system integration with the required personnel.
NSWC PHD is the ISEA for MK 41 VLS. These services are accomplished in whole or in phases that minimize interruption in ship operating schedules while maximizing the capacity of Type Commander and NAVSEA agencies to upgrade and modernize systems.
NSWC PHD Code PD31 Surface Launching Systems Project Office acts as the ISEA and
Landing Craft Mechanized (LCM) for the MK 41 VLS. Code PD31 provides in-service engineering support, testing, troubleshooting, familiarization, scheduling, and project oversight and management to the Fleet. Contractor support is required to help Code PD31 meet its mission. MK 41 VLS is a guided missile launcher that is installed aboard USN surface combatants including Ticonderoga Class Guided Missile Cruisers (CG 47) and
Arleigh Burke Class Guided Missile Destroyers (DDG 51), and Foreign Military Sales
(FMS) ships.
For any data generated under this contract, the contractor shall provide the Government unlimited rights or Government purpose rights. Anything less than that should be identified, disclosed in the appropriate Technical Data Package (TDP) and marked in each item. The
Government reserves the right to use, reproduce and distribute such data, as it deems necessary. (CDRL A001)
The contractor shall be responsible for ensuring compliance with all copyright and trademark laws and appropriate marking of copyrighted and trademarked data, including obtaining permission for use and reproduction by the Government.
The contractor shall provide all required labor, materials, and resources to perform tasks supporting MK 41 VLS.
The contractor shall provide all required labor, materials, and resources to upgrade, inspect, test, and deliver, including packing and shipping VLS hardware In Accordance With (IAW) the TDP. (CDRL A002) Which includes, but not limited to:
Next Generation (NG)-2 Launch Control Unit (LCU) and associated Lowest
Replaceable Unit (LRU)
Launch Sequencer (LSEQ) Assembly and associated LRU
Motor Control Panel (MCP) Assembly and associated LRU
Programmable Power Supply (PPS) Assembly and associated LRU
Deluge Valve and Hose Assembly
Module Test Station
Cell and Uptake Hatch Assembly
Launcher Cable and Fiber Optic Assembly
Circuit Card Assembly
Canisters
Test Equipment
Power Supply Assembly
Transformer Assembly
Fiber Optic Junction Assembly
Launcher Fiber Optic Cables
1.1 LOCATION
Services will be required at shore sites, land-based test/tactical facilities, training commands shipyards, and aboard ships in-port and at-sea for the U.S.A., Allied Nations, and FMS customers. The ships and sites listed below include, but are not limited to, the major locations at which the work of this contract may be carried out:
Table 1
TICONDEROGA (CG 47) Class Cruisers
ARLEIGH BURKE (DDG 51) Class Destroyers
OLIVER HAZARD PERRY (FFG 7) Class Frigates
SAN ANTONIO (LPD 17) Class Amphibious Ships
ZUMWALT (DDG 1000) Class Destroyers
Japanese KONGO (DDG 173) and ATAGO (DDG 177) Class
Destroyers
Spanish ALVARO DE BAZAN (F 100) Class Frigates
Norwegian FRIDTJOF NANSEN (F310) Class Frigates
South Korean KING SEJONG THE GREAT (DDG 991) Class
KDX-III Destroyers
Australian HOBART Class Air Warfare Destroyers
Other FMS Customer Sites and Ships
NSWC Port Hueneme, CA
Combat System Test Sites
US Naval Shipyards
US Naval Weapon Stations
Shore Sites, Depots, and Training Facilities
US Support Facilities Overseas
NIMITZ Class Aircraft Carriers
Other USN Surface Missile System Ships
US Naval Munitions Command Detachments
Self Defense Test Ship
White Sands Missile Range (WSMR)
Pacific Missile Range Facility (PMRF)
Future Frigates (FFG X)
Large Unmanned Surface Vehicle ( LUSV)
Table 1
CSCS Unit Dam Neck
CSCS Detachment West San Diego
Aegis Ashore (Romania and Poland)
Aegis Training and Readiness Center (ATRC) Dahlgren
Zumwalt Training Facility San Diego
2.0 APPLICABLE DOCUMENTS
The contractor shall adhere to the following documents. All applicable tasking, processes, performance, execution, and documentation shall be in accordance with the most current revision of these documents. The specific reference documents shall be provided in the contract.
Table 2
Document Title No./Version
VLS MK 41 MODS 0/2/7/15/31 Technical
Manuals
SW394-AF-MMO-000/VLS, REV 5
(with the upcoming ACN 6/A)
VLS, Cell Hatch Drive Linkage; Inspection and Adjustment Procedure AVP-20140728-1j
VLS, Cell Hatch Adjustment Procedure AVP-20180501
MK 41 VLS Cell Hatch Overhaul Manual IMS – 4810-6692879-0019 REV E ACN 3
MK 41 VLS Deluge Valve Assembly
Overhaul Manual
IMS-4810-5497337-3 REV L ACN 11M
PEO IWS 3.0 Memorandum, MK 41 VLS
Deluge Valve Certification Program, May
29, 2018
Memorandum: 8391 Ser. IWS3/026
86-2D MK 41 VLS Standing Instruction 86-2D, "U.S. Navy MK 41 VLS Personnel
Certification Program", Require a certified
Systems Maintenance Technician (SMT) card carrier for certain tasking, (latest version); (Submit document request to
Contract Specialist identified in Section G, a copy of an approved DD Form 2345 must be submitted with request)
86-2D
Ser IWS3/115
26 June 2015
Description, Operation, and Maintenance
Handbook; Magazine Sprinkling Systems S9522-AA-HBK-010, rev 4
NAVSEA Drawing 7104280 Control Unit, Vertical Launch, Mark 235, REV B
NAVSEA Drawing 6169951 VLS MK 41 MOD 0, REV H
NAVSEA Drawing 6169961 VLS MK 41 MOD 2, REV D
NAVSEA Drawing 6912335 VLS MK 41 MOD 7, REV A
NAVSEA Drawing 7104281 Vertical Launching System MK 41 MOD
15, REV B
Other reference documents may include:
Table 3
Document Title No./Version
Human Systems Interface for Marine
Systems ASTM-1166, REV 2021 Edition
General Specification for Overhaul of
Surface Navy Ships
NAVSEA S9AA0-AB-GSO-010, REV 4
General Specifications for Ships Most recent version at the time of award.
Standard General Guidelines for Electronic
Equipment
MIL-HDBK-454B, REV B
Requirements for Welding and Brazing
Procedure and Performance
Qualification (Amend 002)
NAVSEA Technical Publication S9074-
AQ-GIB-010/248, Most recent version at the time of award.
Ordnance Pamphlet 4 (OP-4), REV 10
Electrical Workmanship Standards, Portsmouth Naval Shipyard Standard
4855.1 Through 4855.6, Most recent
version at the time of award.
Fabrication, Welding and Inspection of Ship
Structures (Amend 002)
MIL-STD-1689A
Welded Joint Design MIL-STD-22D
Shock Testing Requirements MIL-S-901D, REV D
Mechanical Vibrations Shipboard
Equipment
MIL-STD-167-1 REV A
Electromagnetic Interference Characteristics MIL-STD-461F, REV F
Navy Occupational Safety and Health
(NAVOSH) Program Manual OPNAV Instruction 5100.23, REV E
Requirements for Nondestructive Testing
Methods
NAVSEA T9074-AS-GIB-010/271, Most recent version at the time of award.
American Welding Society Definitions, Terms and Definitions
AWS A3.0, Most recent version at the time of award.
Standard Methods of Mechanical Testing of
Weld
AWS B4.0, Most recent version at the time of award.
Safety Welding and Cutting AWS Z49.1, Most recent version at the time of award.
Requirements for Fabrication Welding and
Inspection, and Casting
Inspection and Repair for Machinery, Piping, and Pressure Vessels
NAVSEA Technical Publication S9074-
AR-GIB-010/278, Most recent version at the time of award.
Standards and Interpretations, Occupational
Safety and Health Chapter
Occupational Safety and Health Chapter
1915.14, 1915.15 and 1915.16, Most recent version at the time of award.
NAVSEA Information Technology
Standard Guidance, Version 99-1, April 99, Most recent version at the time of award.
Table 3
Document Title No./Version
Model for Quality Assurance in Design, Development, Production, Installation and
Servicing
ISO-9001 Quality Systems, Most recent version at the time of award.
Model for Quality Assurance in Production, Installation and Servicing
ISO-9002 Quality Systems, Most recent version at the time of award.
Joint Fleet Maintenance Manual at www.submepp.navy.mil/jfmm/index.htm
COMFLTFORCOMINST 4790.3, REV A
CH-2
Material Control Standard
NAVSEA 0948-LP-045-7010, Volume 1, Revision 3, Material Control Standard and
Material Control Standard (Material
Designators), Volume 2, Revision 2, dtd
November 2005
NAVSEA Standard Items Most recent version at the time of award.
NSWCCD Program Office Alteration
Quality Assurance Guide Most recent version at the time of award.
3.0 REQUIREMENTS
3.1 GENERAL REQUIREMENTS
(a) The contractor shall prepare a monthly personnel roster of individuals performing work on behalf of the Government. (CDRL A003)
(b) The contractor shall ensure that their personnel comply with all applicable Department of
Defense (DOD), Department of Navy (DoN), NAVSEA and their Field Activities, and local Navy installation security instructions. The contractor shall comply with all policies, procedures and guidance issued by NAVSEA Field Activities, NAVAL Stations, Private
Shipyards, remote sites or travel destinations, including proper check-in and check-out procedures of all contractor personnel occupying Government facilities or otherwise requiring physical access to NAVSEA Field Activities. Contractor shall submit their own
Defense Information System for Security (DISS).
3.1.1 HAZARDOUS MATERIALS MANAGEMENT PROGRAM
(HAZMAT/HAZWASTE) Report; The Contractor shall prepare a
HAZMAT/HAZWASTE report for services. (CDRL_A006)
3.1.2 The Contractor shall prepare Status Report/Monthly Training report for services.
(CDRL A003)
3.1.3 The Contractor shall prepare a personnel roster for services. (CDRL A003)
3.1.4 The Contractor shall prepare an emergency muster report for services. (CDRL A005)
3.1.5 The Contractor shall prepare a funds and man-hours expenditure report for services.
(CDRL A004)
3.1.6 The Contractor shall prepare an emergency action plan for services. (CDRL A005)
3.1.7 The Contractor shall prepare trip reports for all services provided under the Technical
Instructions (TIs). (CDRL A021)
3.1.8 The Contractor shall prepare an accident/incident report associated to the services.
(CDRL A005)
3.1.9 The Contractor shall prepare security list associated to the services. (CDRL A003)
3.1.10 In accordance with Secretary of the Navy (SECNAV) M-5510.30, the Navy Personnel
Security Program Manual (Chapter 6, Section 6-6, Paragraphs 2b and 2c), Executive
Order 13467 of 30 June 2008, as well as Homeland Security Presidential Directive 12
(HSPD-12) and United States Office of Personnel Management Memorandum, Final
Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-
12 dated 31 July 2008, the Contractor shall ensure that all individuals performing work on behalf of the Government have a current, favorably adjudicated background investigation of the appropriate type to determine fitness to perform work on behalf of the Government as a Contractor employee, perform sensitive national security duties, or have access to classified information. A background investigation equivalent to the current Tier requirement and which is still in scope is acceptable.
3.1.11 Contract Status Reporting Electronic Cost Reporting and Financial Tracking
(eCRAFT). (CDRL A004)
3.1.12 The Contractor SHALL to upload the Contractor's Funds and Man-hour Expenditure Reports in the eCRAFT System and submit the Contract Status Report on the day and for the same timeframe. The Contractor submits an invoice into the Wide Area Workflow (WAWF) system. Compliance with this requirement is a material requirement of this contract. Failure to comply with this requirement may result in contract termination. (CDRL A004)
(a) The Contract Status Reports indicate the progress of work and the status of the program and of all assigned tasks. It informs the Government of existing or potential problem areas.
(CDRL A003) (CDRL A004), (CDRL A005) (CDRL_A006)
(b) The Contractor's Funds and Man-hour Expenditure Report reports Contractor expenditures for labor, materials, travel, subcontractor usage, and other contract charges. (CDRL A004)
(1) Access:
eCRAFT: Reports are uploaded through the eCRAFT System Periodic Report Utility
(EPRU). The EPRU spreadsheet and user manual can be obtained at: http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-
Newport/Partnerships/Commercial-Contracts/Information-eCRAFT-/ under eCRAFT information. The eCRAFT e-mail address for report submission is:
ECRAFT.nuwc.npt.fct@navy.mil. If you have problems uploading reports, please see the “Frequently Asked Questions” at the site address above. (CDRL A004)
(2) Submission and Acceptance/Rejection:
The contractor shall submit their reports on the same day and for the same timeframe the contractor submits an invoice in WAWF. The amounts shall be the same. eCRAFT acceptance/rejection shall be indicated by e-mail notification from eCRAFT. (CDRL A004)
3.1.13 The contractor will be developing, producing, analyzing, maintaining, transporting, storing, testing, or using critical information or indicators for this contract.
3.1.14 The contractor shall develop an Operational Security (OPSEC) Plan. The contractor is required to protect critical information associated with the contract to prevent unauthorized disclosure and shall observe OPSEC Requirements. See block 14 of the
DOD Form 254. (CDRL_A008)
3.1.15 The contractor shall comply with the Government Contracting Activity (GCA) or facilities OPSEC program instructions, guidance and contribute to organization-level
OPSEC training and awareness programs while performing aboard designated government sites and facilities. Ensure you read NSWCPHDINST 3432.1C, updating
NSWCPHDINST 3070.2 series for OPSEC requirements.
3.1.16 The contractor shall include OPSEC as part of its ongoing training and awareness program and take all required activity OPSEC training. The contractor shall protect identified critical information, sensitive unclassified information and activities, which, if divulged, could further compromise classified or sensitive information or operations, or degrade the planning and execution of operations performed in support of the mission. Specific OPSEC requirements will be delineated on the DD Form 254.
Trust Worthy Statement: In accordance with SECNAV M-5510.30, the Navy
Personnel Security Program Manual (Chapter 6, Section 6-6, Paragraphs 2b and 2c), Executive Order 13467 of 30 June 2008, as well as Homeland Security Presidential http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/Partnerships/Commercial-Contracts/Information-eCraft-/ http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/Partnerships/Commercial-Contracts/Information-eCraft-/ mailto:Ecraft.nuwc.npt.fct@navy.mil
Directive 12 (HSPD-12) and United States Office of Personnel Management
Memorandum, Final Credentialing Standards for Issuing Personal Identity Verification
Cards under HSPD-12 dated 31 July 2008, the Contractor shall ensure that all individuals performing work on behalf of the Government have a current, favorably adjudicated background investigation of the appropriate type to determine fitness to perform work on behalf of the Government as a Contractor employee, perform sensitive national security duties, or have access to classified information. A background investigation equivalent to the current Tier requirement and which is still in scope is acceptable.
3.1.17 The contractor shall provide the Government unlimited rights in any data generated under this contract. Government rights in software produced under this contract are defined in the special works clause. If the contractor wishes to convey intellectual property rights less than those specified here then the data/software must be identified, and disclosed to the contracting officer as soon as possible. The Government reserves the right to use, reproduce and distribute such data, as it deems necessary.
3.2 SPECIFIC REQUIREMENTS
3.2.1 MK 41 VLS Life Cycle ISEA Support
3.2.1.1 Administrative, technical, and engineering services
The contractor shall provide engineering, technical, and administrative services to
NSWC PHD, related to the MK 41 VLS on design development and testing, technology insertion, performance specifications, performance and data analysis, systems integration, installation support, computer programming and software engineering, Integrated Product Support (IPS) document preparation and system training development, and on-site technical support.
3.2.1.2 Resources
The contractor shall provide all required resources including tools, consumable materials, and qualified personnel.
3.2.1.3 MK 41 VLS hardware and support systems
The contractor shall perform evaluations, removal/installation, overhauls/repairs, and component/system testing on MK 41 VLS hardware and support systems IAW MK 41 drawings, procedures, and technical manuals. (CDRL_A007)
3.2.1.4 Qualified Supervision
The ISEA support services performed under this contract shall be conducted by, or under the supervision of, a certified MK 41 VLS SMT or TD.
3.2.2 MK 41 VLS Latch Rod Adjustment
3.2.2.1 Inspections and adjustments include anti-intrusion latch contact area, cell hatch seal compression, and limited settings. At the completion of these inspections and adjustments, cell hatch timing will be performed. Installation and testing shall be done in accordance with APV-20140728-IF; Cell Hatch Drive Linkage Inspection and
Adjustment. Contractor shall provide data collection from the Latch Rod Adjustments to support Module Mechanical and Electronics investigations applicable to new construction hulls. (CDRL A009)
3.2.2.2 The contractor shall provide the necessary facilities, equipment, materials, parts, and personnel resources to efficiently and effectively accomplish installations.
3.2.2.3 The contractor shall plan and coordinate the use of facilities, equipment, materials, parts, and personnel resources necessary to efficiently and effectively accomplish installations.
3.2.2.4 The contractor shall conduct pre-installation site surveys/ship checks on designated ships and develop a detailed installation schedule detailing the installation, testing, and checkout phases of the effort. (CDRL_A010)
3.2.2.5 The contractor shall review and compare applicable SCDs, ORDALTs, SHIPALTs, MACHALTs, TEMPALTs, and AERs or working plans for each ship class for compliance with existing Installation Control Drawings (ICDs) and recommend changes. Include findings and recommendations in the Plan of Action and Milestones
(POA&M). (CDRL_A011)
3.2.2.6 This requirement shall be conducted by, or under the supervision of, a certified MK 41
VLS SMT or TD.
3.2.2.7 The contractor shall conduct ship checks, if necessary, prior to the start of work for each Ship and maintain a projected work schedule.
3.2.2.8 The contractor shall attend required ship production meetings, provide minutes and maintain a continuous dialogue with the local program coordinator or port engineer.(CDRL_A012)
3.2.2.9 The contractor shall procure and provide transportation, staging, and security for all materials/parts required of any task/installation. The contractor will notify the appropriate Project Manager of any material/parts shortages.(CDRL_A013)
3.3.2 MK 41 VLS Cell and Uptake Hatch Refurbishment
3.2.3.1 Cell hatch refurbishment procedure involves disassembly, inspection, cleaning and painting, and reassembly and touch up. The cell hatches are disassembled and the major components that are considered reusable are inspected, cleaned, and painted. The cell hatches are then reassembled and touched up. All actions are completed IAW
4810-6692849-0019 Rev E ACN 3; MK 41 VLS Cell Hatch Overhaul Manual. Cell hatch refurbishment is in support of the DDG new construction shipbuilding program.
3.2.3.2 The contractor shall provide the necessary facilities, equipment, materials, parts, and personnel resources to efficiently and effectively accomplish installations.
3.2.3.3 The contractor shall plan and coordinate the use of facilities, equipment, materials, parts, and personnel resources necessary to efficiently and effectively accomplish installations.
3.2.3.4 The contractor shall conduct pre-installation site surveys/ship checks on designated ships and develop a detailed installation schedule detailing the installation, testing, and check-out phases of the effort. (CDRL_A014)
3.2.3.5 The contractor shall review and compare applicable SCDs, ORDALTs, SHIPALTs, MACHALTs, TEMPALTs, and AERs or working plans for each ship class for compliance with existing ICDs and recommend changes. Include findings and recommendations in the POA&M.(CDRL_A015)
3.2.3.6 This requirement shall be conducted by, or under the supervision of, a certified MK 41
VLS SMT or TD.
3.2.3.7 The contractor shall conduct ship checks, if necessary, prior to the start of work for each ship and maintain a projected work schedule.(CDRL_A016)
3.2.3.8 The contractor shall attend required ship production meetings, provide minutes, and maintain a continuous dialogue with the local program coordinator or port engineer.
(CDRL_A017)
3.2.3.9 The contractor shall procure and provide transportation, staging, and security for all materials/parts required of any task/installation. The contractor will notify the appropriate Project Manager of any material/parts shortages. (CDRL_A018)
3.2.4 MK 41 VLS Deluge Valve Overhaul
3.2.4.1 The contractor shall perform deluge valve overhaul which includes the testing, repairing, upgrading, and certifying deluge valve assemblies. All actions shall be completed IAW MK 41 VLS DELUGE VALVE ASSEMBLY OVERHAUL
MANUAL IMS – 4810-5497337-3 REV L CAN-5M.
3.2.4.2 The contractor shall plan and coordinate the use of facilities, equipment, materials, parts, and personnel resources necessary to efficiently and effectively accomplish installations.
3.2.4.3 The contractor shall conduct pre-overhaul site surveys/ship checks on designated ships and develop an overhaul schedule detailing the assessment, disassembly, inspection and cleaning, first stage and armature testing and measurement, assembly, pre- and post-overhaul tests, and post-testing final assembly. (CDRL_A019)
3.2.4.4 This requirement shall be conducted by, or under the supervision of, a certified MK 41
VLS SMT or TD.
3.2.4.5 The contractor shall comply with MK 41 VLS Deluge Valve Certification Program of
29 May 2018, an established certification program, in order to ensure MK 41 VLS
Deluge Valve Assemblies are being properly inspected and overhauled. Each deluge valve overhaul site is mandated to maintain qualified personnel, inspected annually, and certified by NSWC PHD.
3.2.4.6 The contractor shall conduct ship checks, if necessary, prior to the start of work for each ship and maintain a projected work schedule. (CDRL_A019)
3.2.4.7 The contractor shall attend required ship production meetings, provide minutes, and maintain a continuous dialogue with the local program coordinator or port engineer.
(CDRL_A017)
3.2.4.8 The contractor shall procure and provide transportation, staging, and security for all materials/parts required of any task/installation. The contractor will notify the appropriate Project Manager of any material/parts shortages.
3.2.5 MK 41 VLS Hardware Fabrication Upgrading and Testing
3.2.5.1 Contractor shall upgrade, inspect, test, and deliver, including packing and shipping
IAM items.
3.2.5.2 MK 41 VLS hardware IAW the TDP. Hardware includes:
NG-2 LCU
LSEQ Assembly
Deluge Valve and Hose Assembly
VLS Module Test Station
Cell Hatch Test Stand Assembly
Valve Impregnation Machine
Cable Assemblies
Circuit Card Assemblies
MK 41 VLS Cell Hatch Refurbishment
MK 41 Canisters
MK 41 VLS Test Equipment
Power supply assemblies
Launcher transformer assemblies
Launcher fiber optic junction boxes
Launcher fiber optic cables
Launcher Motor Control Panels
Launcher ATE
Launcher relay assemblies
LSEQ LRUs
Launcher PPS LRUs
Launcher MCP LRUs
Launcher LCU LRUs
3.2.5.3 The contractor shall provide all required materials, parts, and resources including tools and qualified personnel.
3.2.5.4 The contractor shall perform the tasks listed in 3.2.5.1 in contractor facilities.
3.2.5.5 The contractor shall Package and Transport IAW equipment drawings or best commercial practices. Shipping locations include:
Norfolk, VA
San Diego, CA
Mayport, FL
Pearl Harbor, HI
Ventura, CA
Port Hueneme, CA
Minneapolis, MN
Baltimore, MD
Bridgeport, NJ
Seattle, WA
3.2.5.6 The contractor shall be certified in all the most recent version of standards required to fabricate, upgrade, inspect, and test MK 41 VLS hardware at time of award.
3.2.5.7 This requirement shall be conducted by, or under the supervision of, a certified MK 41
VLS System Maintenance SMT or TD.
3.2.6 MK 41 VLS Component Refurbishment and Testing
3.2.6.1 The contractor shall repair or refurbish Government furnished valves, including hydraulically operated valves, HP air reducing manifolds, and chilled water solenoid valves, to return components to “A” condition. Valves will need to be packaged and shipped IAW 3.3.3. (CDRL_A020)
3.2.6.2 The contractor shall perform applicable hydraulic, pneumatic, and operational testing.
3.2.6.3 The contractor shall provide integrated logistics, materials, and staging support for all contractor furnished material/equipment (CFM/CFE) and Government furnished material/equipment (GFM/GFE).
3.2.6.4 Packaging and transportation IAW equipment drawing or best commercial practices.
Shipping locations include:
Baltimore, MD
Bridgeport, NJ
Charleston, SC
China Lake, CA
Dahlgren, VA
Dam Neck, VA
Earle, NJ
Keyport, WA
Mayport, FL
Minneapolis, MN
Norfolk, VA
Pearl Harbor, HI
Port Hueneme, CA
San Diego, CA
Seal Beach, CA
Seattle, WA
Ventura, CA
Washington DC
White Sands, NM
Yorktown, VA
Sydney, Australia
Manama, Bahrain
Seoul, South Korea
Naples, Italy
Oslo, Norway
Gdansk, Poland
Bucharest, Romania
Yokosuka, Japan
Rota, Spain
3.2.5.1 This requirement shall be conducted by, or under the supervision of, a certified MK 41
VLS SMT or TD.
3.3 TRAVEL REQUIREMENTS
The contractor may be required to travel from the primary performance location when supporting this requirement. The estimated number of trips is 72.
3.3.1 Travel in support of this requirement is anticipated to include, but may not be limited to, the following alternate performance locations:
Table 4
CONUS/
OCONUS
Origin Destination
Number of Days
Per
Trip
Number of Trips
Number of
People
CONUS
Contractor
Facility
Baltimore, MD
35 days 1 2
CONUS
Contractor
Facility
Baltimore, MD
28 days 1 1
CONUS
Contractor
Facility
Bridgeport, NJ
35 days 1 2
CONUS
Contractor
Facility
Bridgeport, NJ
28 days 1 1
CONUS
Contractor
Facility
Charleston, SC
35 days 1 2
CONUS
Contractor
Facility
Charleston, SC
28 days 1 1
CONUS
Contractor
Facility
China Lake, CA
35 days 1 2
CONUS
Contractor
Facility
China Lake, CA
28 days 1 1
Table 4
CONUS/
OCONUS
Origin Destination
Number of Days
Per
Trip
Number of Trips
Number of
People
CONUS
Contractor
Facility
Dahlgren, VA
28 days 1 1
CONUS
Contractor
Facility
Dam Neck, VA
35 days 1 2
CONUS
Contractor
Facility
Dam Neck, VA
28 days 1 1
CONUS
Contractor
Facility Earle, NJ 35 days 1 2
CONUS
Contractor
Facility Earle, NJ 28 days 1 1
CONUS
Contractor
Facility
Keyport, WA
35 days 1 2
CONUS
Contractor
Facility
Keyport, WA
28 days 1 1
CONUS
Contractor
Facility Mayport, FL 35 days 1 2
CONUS
Contractor
Facility Mayport, FL 28 days 1 1
CONUS
Contractor
Facility
Minneapolis, MN
35 days 1 2
CONUS
Contractor
Facility
Minneapolis, MN
28 days 1 1
CONUS
Contractor
Facility Norfolk, VA 35 days 5 2
CONUS
Contractor
Facility Norfolk, VA 28 days 5 1
OCONUS
Contractor
Facility
Pearl
Harbor, HI 35 days 1 2
OCONUS
Contractor
Facility
Pearl
Harbor, HI 28 days 1 1
CONUS
Contractor
Facility
Port
Hueneme, CA
3 days 4 2
CONUS
Contractor
Facility
San Diego, CA
35 days 2 2
CONUS
Contractor
Facility
San Diego, CA
28 days 2 1
CONUS
Contractor
Facility
Seal Beach, CA
35 days 1 2
CONUS
Contractor
Facility
Seal Beach, CA
28 days 1 1
CONUS
Contractor
Facility Seattle, WA 35 days 1 2
OCONUS
Origin Destination
Number of Days
Per
Trip
Number of Trips
Number of
People
CONUS
Contractor
Facility Seattle, WA 28 days 1 1
CONUS
Contractor
Facility Ventura, CA 35 days 1 2
CONUS
Contractor
Facility Ventura, CA 28 days 1 1
CONUS
Contractor
Facility
Washington
DC
3 days 4 2
CONUS
Contractor
Facility
White
Sands, NM 35 days 1 2
CONUS
Contractor
Facility
White
Sands, NM 28 days 1 1
CONUS
Contractor
Facility
Yorktown
VA
28 days 1 1
CONUS
Contractor
Facility
Yorktown, VA
35 days 1 2
OCONUS
Contractor
Facility
Sydney, Australia 35 days 1 2
OCONUS
Contractor
Facility
Sydney, Australia 28 days 1 1
OCONUS
Contractor
Facility
Manama, Bahrain 35 days 1 2
OCONUS
Contractor
Facility
Manama, Bahrain 35 days 1 1
OCONUS
Contractor
Facility
Seoul, South Korea 35 days 1 2
OCONUS
Contractor
Facility
Seoul, South Korea 28 days 1 1
OCONUS
Contractor
Facility Naples Italy 28 days 1 1
OCONUS
Contractor
Facility Naples, Italy 35 days 1 2
OCONUS
Contractor
Facility
Oslo, Norway 35 days 1 2
OCONUS
Contractor
Facility
Oslo, Norway 28 days 1 1
OCONUS
Contractor
Facility
Gdansk, Poland 35 days 1 2
OCONUS
Contractor
Facility
Gdansk, Poland 28 days 1 1
OCONUS
Contractor
Facility
Bucharest, Romania 35 days 1 2
OCONUS
Origin Destination
Number of Days
Per
Trip
Number of Trips
Number of
People
OCONUS
Contractor
Facility Rota, Spain 28 days 1 2
OCONUS
Contractor
Facility Rota, Spain 35 days 1 1
OCONUS
Contractor
Facility
Yokosuka, Japan 35 days 1 2
OCONUS
Contractor
Facility
Yokosuka, Japan 28 days 1 1
The number of times the contractor may be required to travel to each location above may vary as program requirements dictate the numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. All travel requirements will be approved by the Contracting Officer’s Representative (COR) and
Contracting Officer via a TI. Before initiating any travel, the contractor(s) shall submit a detailed and fully burdened estimate that includes the number of employees traveling, their expected travel costs for airfare, lodging, per diem, rental car, taxi/mileage, and any other costs or actions requiring approval. The travel estimate shall be submitted to the COR and
Contract Specialist. Actual costs, resulting from the performance of travel requirements, shall be reported as part of the contractor’s monthly status report. The reportable cost shall also be traceable to the contractor’s invoice.
All travel shall be conducted in accordance with FAR 31.205-46, Travel Costs, and B-231-
H001 Travel Cost-Alt I, NAVSEA and shall be pre-approved by the Procuring Contracting
Officer (PCO) and COR. The contractor will be authorized travel expenses and will be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The contractor shall submit travel reports in accordance with DI-MGMT-81943.
The current “maximum per diem” rates are set forth in the (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for Overseas Non-
Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico, etc.); and (ii) Department of State
(DOS) prescribed rates for foreign overseas locations.
APPENDIX A – DELIVERABLES
CDRL Title Paragraph #
A001
TDP - The Contractor will disclose in the appropriate TDP package any data that the
Government does not have unlimited rights or Government purpose rights.
1.0
A002
TDP Labor, Materials & Resources - The contractor shall provide all required labor, materials, and resources to upgrade, inspect, test, and deliver, including packing and shipping VLS hardware IAW the TDP.
1.0
A003
Contractor Personnel Roster - The contractor shall prepare a monthly personnel roster of individuals performing work on behalf of the
Government. Services provided, security list and training. The reporting period shall be within 30 calendar days after effective date of the contract. Subsequent reports shall be submitted monthly thereafter, not later than the 10th day of the reporting month.
3.1 (a); 3.1.2; 3.1.3; 3.1.9; 3.1.12 (a)
A004 eCRAFT - The Contractor agrees to upload the Contractor's Funds and Man-hour
Expenditure Reports in the eCRAFT System and submit the Contract Status Report on the day and for the same timeframe, the
Contractor submits an invoice into the
WAWF system.
3.1.5; 3.1.11 ;3.1.12; 3.1.12 (b) 3.1.12
(1)
A005
Contract Status Report indicates the progress of work and the status of the program and of all assigned tasks. It informs the
Government of existing or potential problem areas. Emergency Muster Report, Emergency Action Plan for Services, accident report.
3.1.4; 3.1.6; 3.1.8
A006 HAZMAT/HAZWASTE Waste Report 3.1.11 (c)
A007
Hardware and Support Systems Report - The
Contractor shall submit their reports on the same day and for the same timeframe the Contractor submits an invoice in WAWF. The amounts shall be the same. ECRAFT acceptance/rejection shall be indicated by e-mail notification from eCRAFT. This report will include evaluations, removal/installation, overhauls/repairs, and component/system testing.
3.2.1.3
A008
Upon contract award, within the first sixty
(60) days, The Contractor shall develop an
OPSEC Plan.
3.1.14
A009
Latch Rod Adjustment - The contractor shall perform evaluations, removal/installation, overhauls/repairs, and component/system testing on MK 41 VLS hardware and support systems IAW MK 41 drawings, procedures, and technical manuals.
3.2.2.1
A010
Latch Rod Site Pre-Installation Engineering
Plan - The contractor shall conduct pre-installation site surveys/ship checks on designated ships and develop a detailed installation schedule detailing the installation, testing, and checkout phases of the effort.
3.2.2.4
A011
Latch Rod Installation Control Drawing
Review - The contractor shall review and compare applicable SCDs, ORDALTs, SHIPALTs, MACHALTs, TEMPALTs, and
AERs or working plans for each ship class for compliance with existing ICDs and recommend changes. Include findings and recommendations in the POA&M.
3.2.2.5
A012
Latch Rod Production Meeting Minutes -
The contractor shall attend required ship production meetings, provide minutes and maintain a continuous dialogue with the local program coordinator or port engineer.
3.2.2.8
A013
Latch Rod Procure Materials/Parts Staging -
The contractor will notify the appropriate
Project Manager of any material/parts shortages.
3.2.2.9
A014
Cell & Uptake Hatch Refurbishment -
Installation Plan Report - The contractor shall conduct pre-installation site surveys/ship checks on designated ships and develop a detailed installation schedule detailing the installation, testing, and check-out phases of the effort.
3.2.3.4
A015
Cell and Uptake Hatch Refurbishment -
Review ICDs Reports - The contractor shall review and compare applicable SCDs, ORDALTs, SHIPALTs, MACHALTs, TEMPALTs, and AERs or working plans for each ship class for compliance with existing
ICDs and recommend changes. Include findings and recommendations in the
POA&M.
3.2.3.5
A016
Cell and Uptake Hatch Refurbishment - Pre-installation Site Surveys/Ship Checks Report
-The contractor shall conduct ship checks, if necessary, prior to the start of work for each ship and maintain a projected work schedule.
3.2.3.7
A017
Cell and Uptake Hatch Refurbishment, Ship
Production Meetings Reports - The contractor shall attend required ship production meetings, provide minutes, and maintain a continuous dialogue with the local program coordinator or port engineer.
3.2.3.8
A018
Cell and Uptake Hatch Refurbishment, Materials/Parts Staging Report - The contractor shall procure and provide transportation, staging, and security for all materials/parts required of any task/installation. The contractor will notify the appropriate Project Manager of any material/parts shortages.
3.2.3.9
A019
Deluge Valve Overhaul, Pre-Overhaul Site
Surveys and Ship Checks -The contractor shall conduct pre-overhaul site surveys/ship checks on designated ships and develop an overhaul schedule detailing the assessment, disassembly, inspection and cleaning, first stage and armature testing and measurement, assembly, pre- and post-overhaul tests, and post-testing final assembly
3.2.4.3; 3.2.4.6
A020
Component Refurbishment and Testing
Report - The contractor shall repair or refurbish Government furnished valves, including hydraulically operated valves, HP air reducing manifolds, and chilled water solenoid valves, to return components to “A” condition. Valves will need to be packaged and shipped IAW 3.3.3.
3.2.6.1
A021 Trip/Travel Report for service trips as required.
3.1.7
APPENDIX B – ACRONYMS
Acronym Definition
CAD Computer Aided Design
CDRL Contract Data Requirements List
COM Consortium Owned Material
CONUS Continental United States
COR Circular of Requirements; Contracting Officer’s
Representative
COTS Commercial Off-The-Shelf
CSCS Center for Surface Combat Systems
DISS Defense Information Security System
DOD Department of Defense
DoN Department of the Navy
ECP Engineering Change Proposal
FI Fleet Interface
FMS Foreign Military Sales
GOE Government Owned Equipment
GOM Government Owned Materials
HAZCOMM Hazardous Communication
HAZMAT Hazardous Material
HAZWASTE Hazardous Waste
HSPD Homeland Security Presidential Directive
IAW In Accordance With
ILMF Intermediate Level Maintenance Facility
IPS Integrated Product Support (formerly ILS)
ISEA In-Service Engineering Agent
MBES Model Based Engineering Support
MBPS Model Based Product Support
MP&T Manpower, Personnel, and Training
MTC Missile Test Cell
NAVSEA Naval Sea Systems Command
NSPO NATO Sea sparrow Project Office
MBES Model Based Engineering Support
MBPS Model Based Product Support
MP&T Manpower, Personnel, and Training
MTC Missile Test Cell
NSPO NATO Sea sparrow Project Office
NSWC Naval Surface Warfare Center
NSWC PHD Naval Surface Warfare Center Port Hueneme Division
OCONUS Outside CONUS
OIS Ordnance Information System
OPM Office of Personnel Management
ORDALT Ordnance Alteration
PEO IWS Program Executive Office for Integrated Warfare Systems
PMRF Pacific Missile Range Facility
PMS Planned Maintenance System
PT/NACLC Position of Trust National Agency Check with Inquiries
PT/SSBI Position of Trust Single Scope Background Investigation
SCD Ship Change Document
SDTS Self Defense Test Ship
SDP Software Development Plan
SIPRNET Secret Internet Protocol Router Network
SM Standard Missile
SOP Standard Operating Procedure
T&E Test and Evaluation
TDP Technical Data Package
TI Technical Instruction
TMINS Tech Manual Identification Numbering System
TOR Technical Operational Requirement
WSI Weapon System Integration
File details come from the government source that posted it. Updated .