3. Schedule.docx

DOCX document 16 KB Posted

Attached to
127EAW22R0042 - Caldor Fire Phase II Storm Proofing
Solicitation number
127EAW22R0042
Issued by

About this file

This document contains a schedule of items and notes for a federal construction contract opportunity. The contract involves road reconditioning and drainage work on 34.3 miles of asphalt/chip sealed roads, 65.5 miles of gravel/native surface roads, and replacing and installing various sizes of corrugated metal pipes. The base contract totals are to be provided by bidding contractors. An optional additional 1.9 miles of asphalt road reconditioning and 20 pipe end section installations is also outlined. The opportunity is a total small business set aside issued by the USDA Forest Service for storm proofing efforts related to the Caldor Fire on the Eldorado National Forest, with an estimated value between $500,000 and $1,000,000. Contractors are to field verify all quantities and requirements outlined in the drawings, statement of work, and specifications.

View the file

Other files

File Type Posted
2. Fire Plan.pdf PDF
7. RFI Form.docx DOCX document
4. Drawings.pdf PDF
1. Statement of Work.pdf PDF
5. Forest Service Supplemental Specifications.pdf PDF
6. Davis-Bacon Act WD # CA20220007.pdf PDF
127EAW22R0042 - Caldor Fire Phase II Storm Proofing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
15101
Mobilization
1
Lump Sum
$
$
20425
Drainage Excavation, Type - Critical Dip
10
Each
$
$
30301
Road Reconditioning – Asphalt/Chip Seal Road
34.3
Mile
$
$
30302
Road Reconditioning- Gravel/Native Surface Road
65.5
Mile
$
$
60201
Replace 24 inch Pipe Culvert, Type – Galvanized Steel, Disposal Method A
1
Each
$
$
60202
Install 24 inch CMP End Section
2
Each
$
$
60203
Install 24 inch CMP Riser
2
Each
$
$
BASE TOTAL:
$___________

B.1 SCHEDULE OF ITEMS – OPTION 1

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
20402
Increase Inlet Catch Basin, 18 inch to 30 inch
5
Each
$
$
30301
Road Reconditioning – Asphalt/Chip Seal Road
1.9
Mile
$
$
30302
Road Reconditioning – Asphalt/Chip Seal Road
78.6
Mile
$
$
60204
Install 18 inch CMP End Section
20
Each
$
$
OPTION 1 TOTAL:
$___________
BASE + OPTION 1 TOTAL:
$___________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID: