3. Schedule.docx
DOCX document 16 KB Posted
- Solicitation number
- 127EAW22R0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items and notes for a federal construction contract opportunity. The contract involves road reconditioning and drainage work on 34.3 miles of asphalt/chip sealed roads, 65.5 miles of gravel/native surface roads, and replacing and installing various sizes of corrugated metal pipes. The base contract totals are to be provided by bidding contractors. An optional additional 1.9 miles of asphalt road reconditioning and 20 pipe end section installations is also outlined. The opportunity is a total small business set aside issued by the USDA Forest Service for storm proofing efforts related to the Caldor Fire on the Eldorado National Forest, with an estimated value between $500,000 and $1,000,000. Contractors are to field verify all quantities and requirements outlined in the drawings, statement of work, and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2. Fire Plan.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 4. Drawings.pdf | ||
| 1. Statement of Work.pdf | ||
| 5. Forest Service Supplemental Specifications.pdf | ||
| 6. Davis-Bacon Act WD # CA20220007.pdf | ||
| 127EAW22R0042 - Caldor Fire Phase II Storm Proofing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| 1 |
| Lump Sum |
| $ |
| $ |
| 20425 |
| Drainage Excavation, Type - Critical Dip |
| 10 |
| Each |
| $ |
| $ |
| 30301 |
| Road Reconditioning – Asphalt/Chip Seal Road |
| 34.3 |
| Mile |
| $ |
| $ |
| 30302 |
| Road Reconditioning- Gravel/Native Surface Road |
| 65.5 |
| Mile |
| $ |
| $ |
| 60201 |
| Replace 24 inch Pipe Culvert, Type – Galvanized Steel, Disposal Method A |
| 1 |
| Each |
| $ |
| $ |
| 60202 |
| Install 24 inch CMP End Section |
| 2 |
| Each |
| $ |
| $ |
| 60203 |
| Install 24 inch CMP Riser |
| 2 |
| Each |
| $ |
| $ |
| BASE TOTAL: |
| $___________ |
B.1 SCHEDULE OF ITEMS – OPTION 1
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 20402 |
| Increase Inlet Catch Basin, 18 inch to 30 inch |
| 5 |
| Each |
| $ |
| $ |
| 30301 |
| Road Reconditioning – Asphalt/Chip Seal Road |
| 1.9 |
| Mile |
| $ |
| $ |
| 30302 |
| Road Reconditioning – Asphalt/Chip Seal Road |
| 78.6 |
| Mile |
| $ |
| $ |
| 60204 |
| Install 18 inch CMP End Section |
| 20 |
| Each |
| $ |
| $ |
| OPTION 1 TOTAL: |
| $___________ |
| BASE + OPTION 1 TOTAL: |
| $___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |
| Email: |
| Phone Number: |
| UEI Number: |
| Tax ID: |