3. Schedule.docx
DOCX document 15 KB Posted
- Attached to
- 127EAW22R0034 - Caldor Fire Roads Repair
- Solicitation number
- 127EAW22R0034
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 - RFIs - SOW - Schedule - and Time.pdf | ||
| 3. Schedule - Revised 9 May.docx | DOCX document | |
| RFI Official Responses -1.pdf | ||
| 1. Statement of Work - Revised 9 May.pdf | ||
| 6. General Area Map.jpg | JPG image | |
| 4. FP-14 Construction Specs.pdf | ||
| 7. Davis-Bacon Act WD # CA20220007.pdf | ||
| 2. Fire Plan.pdf | ||
| 5. FS Supplemental Specs.pdf | ||
| 8. RFI Form.docx | DOCX document | |
| 127EAW22R0034.pdf | ||
| 1. Statement of Work.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UOI |
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| 1 |
| LS |
| 15201 |
| Construction survey and staking, method (i) |
| 1 |
| LS |
| 20301 |
| Pavement Removal Disposal Method (a) |
| 13963 |
| SQFT |
| 40301 |
| Asphalt Concrete, CalTrans ½” Max Medium ‘B’ Type |
| 165 |
| TONS |
| 40302 |
| Asphalt Concrete, CalTrans ½” Max Medium ‘B’ Type, Hand Patching |
| 105 |
| TONS |
| 63501 |
| Temporary traffic control |
| 1 |
| LS |
| BASE TOTAL: |
| ___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.