3. Quality Assurance Surveillance Plan (QASP).docx
DOCX document 18 KB Posted
- Solicitation number
- 12444523Q0037
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2. Statement of Work (SOW).docx | DOCX document | |
| 6. Experience Questionnaire.docx | DOCX document | |
| 4. Maps.pdf | ||
| RFQ 12444523Q0037.pdf | ||
| 5. Illinois Statewide SCA WD 2003-0288.txt | TXT text file | |
| 1. FS-Schedule of Items Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
| Contract Line-Item No. – Work Requirement |
| Task / Critical Sub-tasks |
| Quality Standards |
| Acceptable Quality Level (AQL) |
| Monitoring Method |
Mechanical and Herbicide Treatment Category Woody Vegetation
| 1. – Trees and Large Shrubs (less than 6” DBH) – Hand Cutting and Cut Stump Herbicide |
| Contractor shall hand cut and treat trees and large shrubs (less than 6” DBH), including young seedlings and saplings or suckers of NNIS infestation(s). Where cutting is necessary, applicators will apply herbicide at a sufficient interval to meet or exceed the kill rate on target NNIS infestation(s). |
| 100% of target NNIS infestation(s) treated. |
| Minimum 95% kill of target NNIS infestation(s) |
AND
Less than 10% mortality to non-target plant species’; or values specified on the task order.
Visual and random GPS sampling
| 2 - Shrubs and Woody Vines – Light Mowing/Cutting & Cut Stump Herbicide |
| Contractor will mow or cut shrubs and woody vines and apply herbicide to the cut stems of the target NNIS infestation(s). Applicators will apply herbicide at a sufficient interval to meet or exceed the kill rate on target NNIS infestation(s). Typically, this combination treatment would occur in areas where shrubs/woody vines are too tall for foliar spraying alone to be effective. |
| 100% of target NNIS infestation(s) treated. |
| Minimum 95% kill of target NNIS infestation(s) |
AND
Less than 10% mortality to non-target plant species’; or values specified on the task order.
Visual and random GPS sampling
| 3. - Shrubs and Woody Vines – Foliar and or Basal Barking |
| Contractor will apply foliar herbicides in a systematic fashion to provide coverage to the entire NNIS infestation(s) according to the specifications on the Task Order. Typically, this treatment would occur on shrubs/woody vines and resprouts/seedlings/saplings that are shorter or recently cut or burned and foliar sprayings would provide effective control of the target infestation(s). |
| 100% of target NNIS infestation(s) treated. |
| Minimum 95% kill of target NNIS infestation(s) |
AND
Less than 10% mortality to non-target plant species’; or values specified on the task order Visual and random GPS sampling
Foliar Herbicide Treatment Category Herbaceous Flowering Plants, Grasses, and Vines/Semi-woody Vines
| 4. - Open Land and/or Roadside NNIS |
| Contractor will apply foliar herbicides in a systematic fashion to provide coverage to the entire NNIS infestation(s) according to the specifications on the Task Order. Some grassland areas may have restrictions on when herbicide application can occur to prevent harm to ground nesting birds |
| 100% of target NNIS infestation(s) treated. |
| Minimum 95% kill of target NNIS infestation(s) |
AND
Less than 10% mortality to non-target plant species’; or values specified on the task order.
Visual and random GPS sampling
Foliar Herbicide Treatment Category Herbaceous Flowering Plants, Grasses, and Vines/Semi-woody Vines
Inspections (non-Line Item)
| Meeting the AQL for line items inspected; either an interim of final inspection, thus avoiding the need for a re-inspection. |
| COR does not have to re-inspect. |
| 100% success rate in terms of not requiring any re-inspections during the term of the task order. |
| Visual |
| Schedule (non-Line Item) |
| Timely Completion of the Task Order |
| Per the Work Schedule, the Contractor will complete all task order work prior to the task order end date. |
| All task order work must be complete by the task order end date and meet the AQL. |
| Visual |
NOTES:
1. Meeting the AQL for Line Items: Meeting or exceeding the acceptable kill ratio on target NNIS but exceeding the specified mortality value to non-target desirable plants, will result in the same reduction because the Contractor(s) did not meet all elements of the AQL values. Additionally, Contractor(s) must reapply the required herbicide at their expense upon failure to meet AQL values at the final inspection for each task order contract line item where the work performed failed to reach the minimum acceptable target kill ratio of the NNIS infestation(s).
2. Inspection: The Forest Service considers passing inspections (interim or final) to be critical. In an attempt to limit re-inspections, the Forest Service has elected to apply a disincentive when an area is inspected, and the AQL is not met. The Forest Service strives for effective and efficient contract administration; one of way of promoting this is to limit the need for re-inspections.
3. If contractor achieves less than 50% of AQL in any unit after re-work, a 50% deduction in payment will be applied to that unit, unless that outcome is beyond the control of the contractor.
4. Payment for Line Items B002 (followed by foliar spot spray) and B003 (followed by basal barking) will be 90% upon completion of first year of treatment (as long as Quality Standard and AQL have been met for that year-e.g. as soon as you can see effects of herbicide, which could take about 30 days), and then the remaining 10% after either 1) monitoring the next spring shows no retreatment needed, OR 2) monitoring the next spring shows treatment needed, and they retreat, and they again meet Quality Standard and the AQL. Cost of 1st year treatment and 2nd year monitoring and possible retreatment should be included in total per acre costs on the price schedule in Section B.