3. Attachment 1 Scope of Work Upgrade of Lab AC unit.docx

DOCX document 21 KB Posted

Attached to
Upgrade Lab AC unit Fort Duchesne UT Federal contract opportunity
Solicitation number
75H71221Q00016
Issued by
Department of Health and Human Services Indian Health Service

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Lab AC unit Fort Duchesne UT, newest first.
File Type Posted
5. Wage Rates.pdf PDF
1. AC Replacement Introduction.docx DOCX document
4. Provisions and Clauses for Solicitation 3 15 2018.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Scope of Work Upgrade of the Existing Laboratory AC Unit and HVAC system.

General:

Upgrade of the existing laboratory AC unit.

Location:

Fort Duchesne IHS Indian Health Clinic 6932 E. 1400 S.

Fort Duchesne, UT 84026 Lat. 40.2822417 Long. -109.8712278

Background:

The existing AC unit that cools the laboratory does not provide sufficient cooling for the amount of heat generation from laboratory equipment present and the hot summer months for August and September. There has been a couple of times when the laboratory equipment has reached high temperatures that have caused the laboratory specimens to be non-valid.

The laboratory is approximately 17 foot by 19 foot by 9 foot high. The laboratory needs approximately 3 tons of cooling and 300 CFM flow design to ensure the building is cooled properly. The laboratory does not require heating due to the heat being supplied by the primary HVAC system from the building.

The existing Air Conditioning Unit for the laboratory has a condensing unit outside. The blower unit is located inside the building located in the attic. Currently all of the air is taken from inside the clinic, and is blown into the laboratory. There are several laboratory machines in the laboratory that support COVID operations. It is essential to COVID screening to have the machines in a control environment of care.

Description of services to be provided:

A) Contractor shall check in with the Facility Manger and pick up a badge, if this is outside of normal business office, call 435-828-0390 to gain access.

B) Contractor is responsible for sizing the unit so they do not have to replace the unit because it does not perform.

C) Provide a new thermostat inside the laboratory.

D) Upgrade existing VAV valves on the ductwork.

E) Installing an outside exhaust vent with ductwork to the existing exhaust fan.

To be furnished with Bid:

1. The following deliverables shall be provided with bid:

a. Proposed performance from manufacturer of ductless units.

b) Installation foreman, experience with mechanical/HVAC projects

c) Proposed brief schedule of work, shall include a quality control plan that addresses the accomplishment of each task in this requirement and how the satisfactory completion of each task is measured.

d) Propose work to install mini-ductless systems in the server room and the doctor’s office.

e) Solution for temporary cooling if needed.

2.0 To be furnished after award:

1. The following deliverables shall be provided after award.

a. Submittals for the mini ductless to be installed.

b. Submittals for the electrical service.

c. Submittals for the unit controls.

3.0 To be furnished after installation:

1. The following deliverables shall be provided after award.

a) Startup and operation of units.

b) Copies of the installation manuals.

c) Copies of the operator’s manual.

d) Warranties Information.

e) As-built from contractor installation.

Electrical Service Requirements: Bring electrical service to the outside condensing units if needed. Contractor is responsible for subcontracting an electrician. The units shall be designed to keep the areas around 72 degrees, (ASHRAE 170 gives a range on 70-75).

Refrigeration Requirements: The contractor shall be qualified to work with refrigerant.

4.0 Codes and Requirement

1. ASHRAE 170

2. OSHA safety requirements

3. International Mechanical Code

4. National Electric code

5. International Building Code