This is a Navy Solicitation (Request for Proposal) issued by NAVSUP Weapon Systems Support-Philadelphia for a two-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract for repair and modification of repairable assemblies in the LX (Safety and Survival Material), E-2, and AV-8 (Attack Aircraft) systems. The contract will be a firm fixed-price IDIQ with delivery orders issued over a two-year period, with the contractor responsible for furnishing all labor, materials, and facilities required to repair and/or modify government-owned repairable assemblies.
Key details include a solicitation number N00383-25-R-P701, issued on 10/08/2025, with a 2:00 PM response deadline on 12/08/2025. The contract requires the contractor to provide Commercial Asset Visibility (CAV) reporting, comply with configuration management requirements, and handle potential beyond repair (BPR) or beyond economical repair (BER) items according to specified procedures. The contractor must maintain comprehensive quality standards, use current repair manuals, and ensure that repaired items are returned to a Ready For Issue (RFI) condition. Attachment A will specify the specific items to be repaired, and each delivery order will include detailed attachments for pricing, packaging, and other contract requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3.02_Solicitation_N0038325RP701.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A
B
C
D
E
F
G
H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFER-
OR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
1 58
N0038325Y6765
N00383
NAVSUP Weapon Systems Support-Philadelphia 700 Robbins Avenue, Philadelphia, PA 19111-5098
N00383-25-R-P701 www.neco.navy.mil 2:00 PM
Kristin Clemens, N792.07 kristin.clemens2.civ@us.navy.mil
12/08/2025
771 229 403
10/08/2025
N00383-25-R-P701
TABLE OF CONTENTS
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES/SERVICES AND PRICES
B01 - TYPE OF CONTRACT - INDEFINITE QUANTITY CONTRACT
B02 - INDEFINITE QUANTITIES
B03 - PLACING AND PROCESSING ORDERS
B04 - SUPPLIES, MATERIALS, AND PARTS TO BE FURNISHED
B05 - WSSTERMBA00 CONTACT INFORMATION
B06 - WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED
C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK
C03 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)
C04 – SUPTXT204-9400(4-22) CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH
INFORMATION
C05 – SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)
C06 - WSSTERMCZ04 - GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)
C07 – WSSTERMCZ01 – CONFIGURATION MANAGEMENT AND CONTROLS
SECTION D - PACKAGING AND MARKING
D01 - DFARS 252.211-7003 - ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
D02 - WSSTERMDZ03 - PRESERVATION, PACKAGING, PACKING AND MARKING
SECTION E - INSPECTION AND ACCEPTANCE
E01 – FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
E02 – FAR 52.246-11 – HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
E03 - INSPECTION AND ACCEPTANCE AT ORIGIN (REPAIRABLE ASSEMBLIES)
E04 - INSPECTION AND ACCEPTANCE AT DESTINATION (REPORTS)
SECTION F - DELIVERIES OR PERFORMANCE
F01 - CLAUSES INCORPORATED BY REFERENCE
F02 - TIME OF DELIVERY
F03 - PLACE OF DELIVERY - FOB ORIGIN (Repair & Repair Parts) F04 – NAVSUPWSSFA24 - COMMERCIAL ASSET VISIBILITY REPAIRABLES PORTAL (CAV RP) REPORTING
SECTION G - CONTRACT ADMINISTRATION
G01 - CONTRACT ADMINISTRATION
G02 - DFARS 252.232-7006 - WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H01 – SUPTXT243-9400(1-92) - AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
H02 - WSSTERMHZ02 - QUALITY ASSURANCE REPRESENTATIVE (QAR)
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I01 - CLAUSES INCORPORATED BY REFERENCE
I02 – FAR 52.216-19 - ORDER LIMITATIONS (OCT 1995)
I03 – FAR 52.216-22 – INDEFINITE QUANTITY (OCT 1995)
I04 – FAR 52.216-24 – LIMITATION OF GOVERNMENT LIABILITY (APR 1984)
I05 – FAR 52.223-9 - ESTIMATE PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED
ITEMS (MAY 2008)
I06 - FAR 52.252-6 - AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
I07 – DFARS 252.217-7028 – OVER AND ABOVE WORK (DEC 1991)
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K01 - FAR 52.252-1 – SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
K02 - FAR 52.204-8 - ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)
K03 - FAR 52.209-7 - INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
K04 – 52.209-13 - VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENT-CERTIFICATION (NOV 2021) K05 - DFARS 252.204-7007 - ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)
K06 - WSSTERMKZ01 - PRICING INFORMATION
K07 - DFARS 252.225-7000 – BUY AMERICAN – BALANCE OF PAYMENTS PROGRAM CERTIFICATE, BASIC (FEB 2024) K08 - DFARS 252.225-7035 - BUYAMERICAN – FREE TRADE AGREEMENTS – BALANCE OF PAYMENTS PROGRAM
CERTIFICATE, BASIC (FEB 2024)
K09 - DFARS 252.225-7035 – BUY AMERICAN – FREE TRADE AGREEMENTS – BALANCE OF PAYMENTS
PROGRAM CERTIFICATE, ALT. I (FEB 2024)
K10 - DFARS 252.225-7035 – BUY AMERICAN – FREE TRADE AGREEENTS – BALANCE OF PAYMENTS PROGRAM
CERTIFICATE, ALT IV (FEB 2024)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS OR RESPONDENTS
L01 – SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L02 - FAR 52.211-14 - NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
L03 - FAR 52.216-1 - TYPE OF CONTRACT (APR 1984)
L04 - FAR 52.233-2 - SERVICE OF PROTEST (SEP 2006)
L05 - DFARS 252.215-7009 - PROPOSAL ADEQUACY CHECKLIST (MAR 2023)
L06 - DFARS 252.217-7026 - IDENTIFICATION OF SOURCES OF SUPPLY (JAN 2023)
L07 - WSSTERMLZ05 - REVIEW OF AGENCY PROTESTS
L08 - WSSTERMLZ06 - CONSIGNMENT INSTRUCTIONS
L09 - CERTIFICATE OF CURRENT COST OR PRICING DATA
ATTACHMENT __ – PRICING SHEET EXAMPLE
ATTACHMENT ___ - GOVERNMENT FURNISHED PROPERTY/SPECIAL TOOLING/SPECIAL TEST EQUIPMENT
ATTACHMENT ___ - REPAIR MANUALS AND FACILITIES
ATTACHMENT ___ - GOVERNMENT FURNISHED MATERIAL
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES/SERVICES AND PRICES
B01 - TYPE OF CONTRACT - INDEFINITE QUANTITY CONTRACT
Award under this Request for Proposal (RFP) will be made under a two (2) year INDEFINITE QUANTITY CONTRACT. Orders may be issued up to two (2) years from date of award.
The authorized ordering activity under the Indefinite Quantity Contracts is NAVSUP Weapon Systems Support.
Prices will be for Repair/Modification of the items specified on Attachment A hereto. All orders placed for repair during this time period shall be issued as Priced Orders. Therefore, offerors should insert Firm-Fixed Prices for each year included in the Base and Option Periods. All parts necessary to effect repairs shall be furnished by the contractor and shall be considered to have been included in the price of repairs.
B02 - INDEFINITE QUANTITIES
The BASE PERIOD Quantities stated on Attachment A are the Government’s best estimates.
The amounts which the contractor may be required to furnish and the Government to accept hereunder shall be amounts which shall from time to time be ordered by the Government during the Ordering Period of the contract.
The following is hereby added to clarify “Minimum” Quantities: If for any reason the Minimum Quantity is not placed for any item, the non-placed quantity shall be considered Terminated for the Convenience of the Government.
Quantities identified in Attachment “A” represent the Government’s Best estimate of supplies or services that will be required under the Base Period. Additionally, pursuant to FAR 52.216-22(b), Indefinite Quantity, minimum and maximum quantities are as specified on the Attachment “A.”
B03 - PLACING AND PROCESSING ORDERS
(a) Ordering Period: The Government may place orders for articles to be serviced hereunder, during the period commencing on the date of execution of this contract and ending two (2) years from the date thereof. Each order placed shall be issued and processed in the manner hereafter provided.
(b) Authorized Ordering Activity: The NAVSUP WSS Procuring Contracting Officer (PCO) shall place orders under this agreement in the manner provided elsewhere herein;
(c) Form and Content of Orders: Orders issued under this Contract shall be prepared on DD Form 1155; however, if exigency so demands, order may be issued via electronic transmission (e.g., e-mail) and will be confirmed by DD Form 1155 as soon as practicable thereafter, and will bear the notation "CONFIRMING ORDER.” In addition, each DD Form 1155 order shall include the following:
(1) The order number, date, and appropriate reference to this contract;
(2) Citation of the negotiation authority pursuant to which the order is negotiated;
(3) Appropriation and accounting data and special invoicing instructions.
(4) Special shipping instructions, place of delivery, place of inspection, DoD Priority designator and surveillance criticality designator.
(5) Defense Order Rating certified under the Defense Priorities and Allocations System.
(6) Description of work to be performed and identification of specific articles to be repaired including part number and stock number, serial number if available, and quantities thereof.
(7) The model designation of the end unit for which the parts ordered applies, if available.
(8) The agreed upon delivery schedule.
(9) A DD form 1423 setting forth the date ordered.
(d) Obligations of Contractor
(1) The contractor shall, except as specified in paragraphs (2) or (3) below, immediately proceed with the repair of the articles covered by the order.
(2) Where the contractor cannot proceed, or is not authorized to proceed, the contractor shall so advise the PCO (by e-mail, if available) within five (5) working days after receipt of the order. The contractor shall await instruction from the PCO regarding such orders; which shall be issued within five (5) working days, or such additional period as the PCO may require after being advised by the contractor of the circumstances preventing the start of performance.
(3) The contractor shall advise the PCO of any specific representation or certification that cannot be made as to an order and reason(s) therefore.
(4) In regard to (d)(2) or (d)(3), the contractor shall notify the PCO and the cognizant ACO and shall stop work until given further instructions or disposition of the item by the PCO.
(5) The contractor shall establish and maintain:
(i) A summary of all costs incurred applicable to all orders placed pursuant to the terms of this contract.
(ii) The summary records required in (5)(i) shall be furnished to the Contracting Officer upon request.
(6) Sixty (60) days after induction of the last unit received against delivery orders issued hereunder, Contractor shall notify the ACO (with a copy to the PCO) of the actual quantities inducted for repair.
(e) Within thirty (30) days of ACO’s receipt of contractor’s notice of last induction ((d)(6), above), unless otherwise specified by NAVSUP WSS, ACO shall modify the delivery order, to reduce all excess quantities and funds.
Note to Contractor:
Sixty (60) days after induction of the last unit received against delivery orders issued hereunder, Contractor shall notify the ACO (with a copy to the PCO, Code N792.07) of the actual quantities inducted for repair.
Note to ACO:
Within thirty (30) days of ACO’s receipt of contractor’s notice of last induction, unless otherwise specified by NAVSUP WSS, ACO shall modify the delivery order, to reduce all excess quantities and funds.
B04 - SUPPLIES, MATERIALS, AND PARTS TO BE FURNISHED
(a) The Government may issue Delivery Orders, in the manner provided elsewhere herein, the following types of effort:
(1) Repair and/or Modification: The contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies (hereinafter repairable assemblies or items) in the LX (Safety and Survival Material), E-2, & AV-8 (Attack Aircraft) System. The repairable assemblies to be repaired and/or modified under this Contract are set forth by manufacturer's part number or National Stock Number (NSN) in Attachment "A" and constitute “Government Property” as defined in FAR clause 52.245-1 or 52.245-1 Alternate I, as applicable. Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification Statement of Work (Section C03).
(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor’s effort on each Delivery Order for repair and/or modification of government property shall include furnishing all effort, including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions specified in Sections C04 and F06.
B05 - WSSTERMBA00 CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code (N792.07) Weapon System LRC (T2L) Telephone (771-229-0403) E-Mail: (kristin.clemens@navy.mil)
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.
(01-21)
B06 - WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING
Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).
(09-23) mailto:itimp.wss.fct@navy.mil https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ mailto:usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED
(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:
TBD
The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.
(b) Upon receipt of such articles, the contractor shall:
(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable Delivery Order;
(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;
(3) Advise the Government PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;
(4) Further advise the Government PCO of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.
C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK
1.0 SCOPE
1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this Contract. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment A. This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the Contract items.
1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition.
RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify on Attachment A the governing repair manual(s)/documents for each item covered by this Contract. On the same attachment, the Contractor must identify the facility for each item where repair, including final test and inspection, is completed. If no governing repair manual(s)/documents are identified on Attachment A, the contractor’s most current repair manuals, technical specifications, engineering orders, and/or drawings shall be used for product inspection and acceptance.
1.2.1. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.
1.2.2. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.
1.2.3. The Contractor is not entitled to any equitable adjustment to the price or Contract terms based on the Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.
1.3. Beyond Physical Repair (BPR)
1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.
1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either requesting the submission of a proposal for BPR pricing, or ordering the disposal of the item. If asked to provide a BPR pricing proposal, the Contractor shall provide the proposal to the PCO within 30 days of receipt of the request. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.
1.4. Beyond Economical Repair (BER)
1.4.1. Scope. An item is BER if the cost of the repair exceeds 80% of the replacement price for items identified on Attachment A. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this Contract.
1.4.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER. All such determinations, including the basis for the determination, the repair required, the Contractor’s proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either providing contractual authority for repair of the item or ordering the disposal of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor shall submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.
1.4.3. The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair contract/delivery order, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.
1.5. Missing on Induction (MOI).
1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this contract.
1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.
1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA.
The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair contract/delivery order, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.
1.6. Swapping SRAs
1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.
1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor’s production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e.
cannibalization. Permission from the PCO must be obtained and an equitable adjustment may be required.
Authorization to ship in place from the Contractor’s production line or MILSTRIP must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA
(cannibalized), that transaction does not have to be input into CAV.
2.0 PARTS AND MATERIAL
2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this
Contract unless parts or material are specifically identified on Attachment A as Government Furnished Material (GFM).
All parts and material used in performance of this Contract shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this Contract to updated drawings and specifications for parts and material required for repairs performed under this Contract. Any change to such parts/material drawings or specifications requires Government PCO approval.
2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs 1.4, 1.5 and 1.6, shall not render an item BER or BPR.
2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.
2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.
2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a requested change to the drawings, specifications or manufacturing source or facility.
2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this Contract.
2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor’s facility to ensure conformance with all requirements of the applicable drawings and specifications. Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.
2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.
3.0 INSPECTION PROVISIONS
3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the Contract/Delivery Order or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this Contract.
C03 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)
The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems- Support/Provisions-Instructions-and-Contract/; and incorporated herein by reference.
C04 – SUPTXT204-9400(4-22) CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED
HEALTH INFORMATION
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
The following shall be inserted in full text in all solicitations and contracts (including commercial acquisitions) which require contractor unclassified access to federally controlled facilities, sensitive information, Information Technology (IT) systems or protected health information. For commercial acquisitions, this text shall be incorporated into either the SOW or PWS.
The security text does not apply in cases where the contractor/vendor does not have access to Navy Marine Corps Intranet (NMCI) computers, is not issued a Common Access Card (CAC) and is involved in training or other short term duties of less than 30 days duration that allow for the use of a visitor request. In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.
This local text does not apply to non-United States (U.S.) Nationals (foreign nationals) who are contactor employees performing work overseas. The local This text is applicable to the U.S. Nationals living in the U.S. or overseas who are performing work on a Navy contract.
The investigation of a non-U.S. national at a foreign location must be consistent with a National Agency Check with Written Inquiries (NACI), to the extent possible and include a fingerprint check against the Federal Bureau of Investigation (FBI) criminal history database, an FBI investigations file (name check) search and a name check against the terrorist screening database. Also, the above cited reference notes that Foreign Nationals may not be granted CAC credentials until completion of their investigation and not in the interim.
Per Department of Defense Memorandum (DoDM) 5200.2, Department of Defense (DoD) components must initiate and ensure completion of a background investigation before applying the credentialing standards to a non-U.S. national at a foreign location.
The background investigation must be favorably adjudicated before a CAC can be issued to a non-U.S. national at a foreign location.
The type of background investigation may vary based on standing reciprocity treaties concerning identity assurance and information exchanges that exist between the U.S. and its allies or agency agreements with the host country.
CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, IT
SYSTEMS OR PROTECTED HEALTH INFORMATION
Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.
APPLICABILITY
This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for:
Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense (OSD), the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").
Each contractor employee providing services at a Navy command under this contract is required to obtain a DoD CAC.
Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Definition. As used in this clause - Military installation means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department, or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense (see 10 U.S.C. 2801(c)(4)).
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command's Security Manager (CSM) upon arrival to the command and shall out-process prior to their departure at the completion of the individual's performance under the contract.
Training. Contractor employees who require routine physical access to a Federally controlled facility or military installation shall complete “Level I Antiterrorism Awareness Training” prior to gaining access to a facility and annually thereafter in accordance with
DoDI O-2000.16 Vol. 1. In accordance with Department of Defense Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation: DoD AT Standards, Level I Antiterrorism Awareness Training shall be completed by:
1. Completion of “Level I Antiterrorism Awareness Training” available at https://jkodirect.jten.mil/pdf/atl1/launch.html; or
2. Under the instruction of a qualified Level I Antiterrorism Awareness instructor; or
3. By providing a training certificate for “Level I Antiterrorism Awareness Training” training showing completion within the last calendar year.
The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, prior to being granted access to a Federally controlled facility or military installation.
Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts, including subcontracts for commercial items, when subcontractor performance requires routine physical access to a Federally-controlled facility or military installation.
OPERATION SECURITY (OPSEC)
It is DoD policy according to DoD Directive 5205.02E, “DoD Operations Security (OPSEC) Program,” June 20, 2012, as amended to establish and maintain OPSEC programs to ensure national security-related missions and functions are protected.
Training: Contractor employees shall comply with all DoD OPSEC requirements and complete “OPSEC Awareness for Military Members, DoD Employees and Contractor” training within 30 days of onboarding the contract and annual refresher training thereafter. Training shall be completed through a DoD sponsored and certified computer or web-based learning instruction available at https://securityawareness.usalearning.gov/opsec/index.htm.
The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after training is completed by all employees and subcontractor personnel.
START-UP PERIOD
All contractor resource onboarding documents must be submitted via the prime contractor. The prime contractor shall make all necessary preparations to assume full responsibility for productive performance as of the performance start date.
Definition of "productive":
a. OF-306 signed by contractor employee
b. FD-258 Fingerprint Card (Contingent upon availability of electronic fingerprinting submission)
c. Completed Electronic Investigation (e-QIP)
d. All contractor employees with need for a Common Access Card (CAC) must have an active Defense Information System for Security (DISS) profile.
e. Common Access Card (CAC)
f. DISS Visit Request submitted (Contingent upon classification of work being performed, Confidential, Secret, Top Secret).
Note (1): Invoicing by the contractor will begin as of the commencement of the performance period of services and no reimbursement will be paid by the government for efforts expended during the start-up period.
Note (2): Foreign Nationals are not allowed access to the functional/system side of Enterprise Resource Planning (ERP).
ACCESS TO DOD INFORMATION TECHNOLOGY (IT) SYSTEM
In accordance with DON CIO Memorandum (IT LEVEL DESIGNATION ON DD FORM 2875 SYSTEM AUTHORIZATION ACCESS REQUEST) 08 September 2020, contractor employees who require access to Department of the Navy (DoN) or DoD networks are categorized as Privileged, Enhanced, or Authorized users. All user level accesses may include positions which require access to Controlled Unclassified Information (CUI). CUI includes sensitive information protected under the Privacy Act, to include Protected Health Information (PHI). IT System levels are determined by the requiring activity's Command Information System Security Manager (ISSM)/Information Assurance Manager (IAM).
Contractor employees requiring privileged access, (when specified by the terms of the contract) require a Tier 5 (T5) or T5R equivalent investigation, which is a higher level investigation than the Tier 3 (T3) and T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance (IA) Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Contractors requiring Enhanced access, (when specified by the terms of the contract) require a T3, T3R, or equivalent investigation, which is a higher level investigation than the Tier 1 (T1) described below. Due to the enhanced system access, an investigation suitable for Moderate Risk national security positions is required.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee's duties, such employees shall in-process with the Navy CSM and ISSM/IAM manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual's performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy IT resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the Contracting Officers Representative (COR) shall sign the SAAR-N as the supervisor.
The SAAR-N shall be forwarded to the CSM upon contractor employee acquiring a Common Access Card (CAC) credential. Failure to obtain a CAC credential may result in delaying the individual's start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all contractor employees requiring access complete annual Cyber Awareness training, and maintain a current requisite background investigation. The contractor's security representative shall contact the CSM for guidance when reinvestigations are required.
INTERIM ACCESS
The CSM may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
ACCESS TO CONTROLLED UNCLASSIFIED INFORMATION
Safeguarding sensitive unclassified information is critical to achieve NAVSUP Modernization efforts and deliver cutting-edge and uncompromised capabilities. The Secretary of Defense’s operations security (OPSEC) campaign plan stresses the importance of protecting controlled unclassified information (CUI). CUI encompasses OPSEC, critical technology, intelligence, and personally identifiable information that, if not properly identified, marked, and controlled, could impair NAVSUP’s ability to conduct its mission. Contractor employees with access to Controlled Unclassified Information (CUI) shall comply with DoDI 5200.48 - Controlled Unclassified Information (CUI) and complete DoD approved initial and annual refresher CUI training.
a. Whenever Government provides CUI to, or CUI is generated by, non-DoD entities, all CUI records must be handled as required by the approved mandatory disposition authority.
b. All CUI records must follow the approved mandatory disposition authority whenever the Government provides CUI to, or CUI is generated by, non-DoD entities in accordance with Section 1220-1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., and the DoDI 5200.48.
c. Contractor employees shall monitor CUI aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information
d. Contractor employees shall submit unclassified government information for review and approval for release in accordance with the Standard DoD Component Processes, DoDI 5230.09, and DoDM 5205.07, Volume 1.
CONTRACTOR'S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the contractor's security representative. Within three (3) work days after contract award, the contractor shall provide to the requiring activity's Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the contractor's security representative. The contractor's security representative shall be the primary point of contact on any security matter. The contractor's security representative shall not be replaced or removed without prior notice to the Contracting Officer and CSM.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS
ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES
Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. If the Security Office validates the contractor’s position is Non-Critical Sensitive or if the IT system user level is determined to be Enhanced, at a minimum, each contractor employee must be a US citizen and have a favorably completed T3, T3R, or equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or Enhanced position. The investigation consists of a standard National Agency Check and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or Enhanced position is required to complete:
• SF-86 Questionnaire for National Security Positions (or equivalent Office of Personnel Management (OPM) investigative product)
• Two FD-258 Applicant Fingerprint Cards or electronic fingerprint submission (preferred))
• Original Signed Release Statements
Failure to provide the required documentation at least thirty (30) days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than ten (10) years) throughout the contract performance period. The Contractor’s Security Representative shall contact the CSM for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the CSM upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
Employees requiring IT access shall also check-in and check-out with the Navy Command’s ISSM/IAM. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy IT resources. The SAAR-N shall be forwarded to the CSM upon the contractor employee acquiring a Common Access Card (CAC) credential. Failure to obtain a CAC credential or provide the required documentation shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Cyber Awareness training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the CSM. The CSM will review the submitted documentation for completeness prior to submitting it to the OPM. Potential suitability or security issues identified may render the contractor employee ineligible for the assignment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .