3.01_Sol N0038323QB035_22264-0034.pdf
PDF 351 KB Posted
- Attached to
- SONOBUOY SINGLE LAU, IN REPAIR/MODIFICATION OF
- Solicitation number
- N00383-23-Q-B035
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prescribed by GSA FAR (48 CFR) 53.215-1(a)
Additional provisions and representations are are not attached.
11. BUSINESS CLASSIFICATION
This RFQ is is not a small business-small purchase set aside (52.219-4) [
18. TELEPHONE NO.(Type or Print)17. NAME AND TITLE OF SIGNER
16. DATE OF
QUOTATION
15. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
14. NAME AND ADDRESS OF QUOTERZIP Code) (Street, city, country, State and
(c) (d) (e) (f)
ITEM NO.
(a)
This is a request for information, and quotations furnished are not offers. If you are unable to quote,please so indicate on this form and return it.This request does not commit the government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any represenations and/or certifications attached to this Request for Quotations must be conmpleted by the quoter.
SMALL OTHER THAN SMALL DISADVANTAGED WOMEN-OWNED
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE ON OR BE-
FORE CLOSE OF BUSINESS
5A. ISSUED BY (Date)6. DELIVERY BY
4. CERT.FOR NAT.DEF.
UNDER BDSA REG.2
AND/OR DMS REG.1
(See Schedule)OTHERFOB
DESTINATION
7. DELIVERY
(Name and telephone no.) (No collect calls)5B. FOR INFORMATION CALL:
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE 9. DESTINATION (Consignee and address, including ZIP Code)
RATING3. REQUISITION/PURCHASE REQUEST
NO.
2. DATE ISSUED1. REQUEST NO.
REQUEST FOR QUOTATIONS OF PAGESPAGE
(Date)
12. SCHEDULE
(THIS IS NOT AN ORDER)
(B)
SUPPLIES/SERVIES QUANTITY UNIT UNIT PRICE AMOUNT
13. DISCOUNT FOR PROMPT PAYMENT % % % %
20 CALENDAR DAYS10 CALENDAR DAYS 30 CALENDAR DAYS CLAENDAR DAYS
IMPORTANT:
NOTE:
(Check appropriate boxes)
b. Small Business Size Standard ______
a. Standard Industrial Classification Code _______
PREVIOUS EDITION NOT USABLE
(Include area code)
(REV. 10-83) Approved by GSA/IRMS 9/92EXCEPTION TO STANDARD FORM 18 c.
M
M
FOR EASE OF PROCESSING, PLEASE RETURN THIS
SHEET WHEN MAILING YOUR QUOTE.
X 1 9
N00383-23-Q-B035 2022 NOV 01 22264-0034 DO-A1
NAVSUP WEAPON SYSTEMS SUPPORT
PHILADELPHIA 90 DAYS
700 ROBBINS AVENUE
PHILADELPHIA PA 19111-5098
S. F. PFEIL (215)697-3967 N733.08 X
SEE SCHEDULE
2022 NOV 14
X
PAGES
OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
N00383-23-Q-B035 2 9
TEARDOWN, EVALUATE, REPAIR AND/OR MODIFY
0001 NSN 7RH 1680-01-642-3181 P8
SONOBUOY SINGLE LAU SHELF LIFE 0-00
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS
HM QUP ICQ PMT CD PM WM CUD CT UC LP IC UCL SP MK PACK UNIT PKWT UNIT PKCU OPI
N 001 000 DW 1 00 EA BG B RC A 00 A 03 FFF 103.0 13.300 M
CAGE SPI NUMBER REV SPI DATE CONTAINER NSN
8145012622987
PACKAGING IS IN ACCORDANCE WITH MIL-STD-2073
SHIP TO
0001AA N00383-22-U-4226 SW3122 6 EA
M/F: "A" CONDITION STOCK
TP: 3
SOLICITATION NOTES:
All terms and conditions of BOA N0038320GVC01 apply.
The requested RTAT is 60 days.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: SARAH.PFEIL@NAVY.MIL
N00383-23-Q-B035 PAGE 3 OF 9
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
WSSTERMBA00
CONTACT INFORMATION
When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.
Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:
Code: ( <N733.08> ) Weapon System LRC: ( <N00383> ) Telephone: ( <215-697-4337> ) E-Mail: ( <sarah.f.pfeil.civ@us.navy.mil> )
In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil.
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CLIN: 0001
NIIN: 016423181 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: SONOBUOY SINGLE LAU
1. SCOPE
1.1 . Markings shall be in accordance with MIL-STD-130.
1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with <EDO CORPORATION> drawing number ( <82340> ) <2000920-6> , Revision <latest since unknown> and all details and specifications referenced therein.
1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.
It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and
N00383-23-Q-B035 PAGE 4 OF 9
troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).
3.3 3.0 SCOPE
3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.
3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:
SONOBUOY SINGLE LAU <200920-6> P/N, <7RH 1680 016423181P8> NSN, <Available repair manuals, drawings and specifications per p/n requirements> Tech Publications
3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).
3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.
3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.
3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency"
3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.
3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.
3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.
N00383-23-Q-B035 PAGE 5 OF 9
3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).
3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:
3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options:
Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.
3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.
3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item.
After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements.
3.5 4.0 PARTS AND MATERIALS
3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO.
Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO.
3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.
3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract.
3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings.
3.5.5 ***NOTE***PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.
3.5.6
N00383-23-Q-B035 PAGE 6 OF 9
3.6 SOURCE AND LOCATION OF REPAIR SOURCE:
3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.
SONOBUOY SINGLE LAU <EDO CORPORATION> Company Name , <1500 NEW HORIZONS BLVD, NORTH AMITYVILLE NY 11701-1130> Address , <82340> Cage Code inspection will be accomplished on the contractor's equipment
3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:
3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality.
3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.
3.8 6.0 CONFIGURATION MANAGEMENT (CM):
3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).
3.9 7.0 MARKINGS.
3.9.1 Marking shall be as indicated in the contract when applicable.
3.10 8.0 STORAGE;
3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
CLIN: 0001
NIIN: 016423181 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: SONOBUOY SINGLE LAU
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
CLIN: 0001
NIIN: 016423181 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: SONOBUOY SINGLE LAU
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document Type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
N00383-23-Q-B035 PAGE 7 OF 9
252.232-7006 (CONT)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the Systemfor Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://w /wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
( < Invoice and Receiving Report Combo> )(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
( < Invoice and Receiving Report Combo> )(Contracting Officer: Insert either Invoice 2in1 or the applicable invoioice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
N00383-23-Q-B035 PAGE 8 OF 9
252.232-7006 (CONT)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(f) (Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ( <TBD> ) Issue By DoDAAC ( <N00383> ) Admin DoDAAC ( <TBD> ) Inspect BY DoDAAC ( <TBD> ) Ship To Code ( <SEE SCHEDULE> ) Ship From Code ( <N/A> ) Mark For Code ( < > ) Service Approver (DoDAAC) ( < > ) Service Acceptor (DoDAAC) ( < > ) Accept at Other DoDAAC ( < > ) LPO DoDAAC ( < > ) DCAA Auditor DoDAAC ( < > ) Other DoDAAC(s) ( < > )
(Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact.
( < > )(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
CLIN: 0001
NIIN: 016423181 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: SONOBUOY SINGLE LAU
DOCUMENT NAME EXHBT/ATTCHMNT
NOTES ATTACHMENT 1
N00383-23-Q-B035 PAGE 9 OF 9
CONSIGNMENT INSTRUCTIONS
NOTE: The activity codes listed below are used to identify the Activities which are to receive material. The activity code and the quantities to be shipped to each activity under this contract appear in the Schedule. DO NOT SHIP TO A WATER PORT OR AIR TERMINAL WITHOUT COMPLYING WITH THE
CLEARANCE/MILSTAMP REQUIREMENTS OF CLAUSE FAR 52.247-52.
SW3122 Receiving Officer, DLA DISTRIBUTION JACKSONVILLE, BLDG 175 SWAN ROAD, MICHAEL SKINNER 904-306-6336
JACKSONVILLE, FL 32212-0103
N00383-23-Q-B035
ATTACHMENT 1 PAGE: 1
CLIN: 0001
NIIN: 016423181 ACTIVITY USE ONLY: TDP VERSION NO.: 001
ITEM NAME: SONOBUOY SINGLE LAU
6. NOTES - NOT APPLICABLE
File details come from the government source that posted it. Updated .