3-Crestview 2026.xlsx

XLSX spreadsheet 9 KB Posted

Attached to
Data Cable RFP - Crestview Middle School
Solicitation number
26-13102
Issued by
Missouri

About this file

Crestview Location Data Summary

This file is a location data specification document for the Rockwood School District's Data Cable RFP for Crestview Middle School in Missouri. The project encompasses the installation of Cat6a drops, IDF (Intermediate Distribution Frame) racks and cabinets, and a fiber campus backbone across multiple school buildings. The infrastructure design includes 12 IDFs distributed across various campus locations: MDF A serving as the head end with 48 switch modules in wall configuration and 12 modules in cabinet configuration; IDF B through IDF K each housing between 6 and 24 switch modules depending on location and purpose. The document specifies 86 classrooms requiring 344 total data drops, with an additional 83 data points designated for specific operational areas such as the cafeteria, gymnasium facilities, pool area, administrative offices, and support spaces, totaling 408 drops across the campus. Specific termination requirements are detailed for each IDF, with several closets designated for fiber-only infrastructure containing no new copper connections.

The specification document provides detailed drop counts and IDF assignments for individual rooms and functional areas throughout the facility. Notable allocations include the Cafeteria requiring 12 drops via IDF D, gymnasium facilities requiring multiple drops via IDF E (4 drops in Main Gym, 2 in Lower Gym, with additional drops in Weight Rooms and Locker Rooms), administrative spaces including Office, Reception, Nurse, and Guidance areas requiring drops via IDF A, and specialized areas such as the Pool, Library, and Theatre with specified drop requirements. The document serves as an equipment and infrastructure inventory that supports the bidding process for qualified contractors to provide comprehensive data communications infrastructure improvements to Crestview Middle School.

View the file

Other files

File Type Posted
6-26-13102 Addendum 1.pdf PDF
1-Acknowledgement Form.pdf PDF
5-26-13102 Addendum 1.pdf PDF
4-Appendix B.pdf PDF
2-Appendix A - Parts List - E-Rate 2026.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Crestview Location

Data Closet11 IDF's12
MDF A (300s) (Wall)48 SM
MDF A (300s) (Cabinet)12Terminate in MDF A (Wall)
IDF B (UL 200s)6 SMTerminate in MDF A, J
IDF C (LL 100s)6 SMTerminate in MDF A, J
IDF D (CAFE)24 SMTerminate in MDF A, J
IDF E (PE OFFICE)24 SMTerminate in MDF A, J
IDF F (North Building)6 SMFiber OnlyNo New Copper Should Terminate in this ClosetTerminate in IDF E,A, or J
IDF G (Rm318)6 SMFiber OnlyNo New Copper Should Terminate in this ClosetTerminate in MDF A, J
IDF H (Office)6 SMFiber OnlyNo New Copper Should Terminate in this ClosetTerminate in MDF A, J
IDF I (Rm515)6 SMFiber OnlyNo New Copper Should Terminate in this ClosetTerminate in IDF E,A, or J
IDF J (DR/SERVER) MDFHead EndFiber OnlyNo New Copper Should Terminate in this Closet
IDF K (Library)6 SMFiber OnlyNo New Copper Should Terminate in this ClosetTerminate in MDF A, J
Appendix B; Classroom (86) DATA (344)83332408
Room #FeetDropsAPFxSwitch
101IDF C4
102IDF C4
103IDF C4
104IDF C4
105IDF C4
106IDF C4
107IDF C4
108IDF C4
109IDF C4
110IDF C4
111IDF C4
112IDF C4
113IDF C4
114IDF C4
114 (switches)IDF C4
200IDF B4
201IDF B4
202IDF B4
203IDF B4
204IDF B4
205IDF B4
206IDF B4
207IDF B4
208IDF B4
209IDF B4
210IDF B4
211IDF B4
212IDF B4
213IDF B4
214IDF B4
301IDF A4
302IDF A4
303IDF A4
304IDF A4
305IDF A4
306IDF A4
307IDF A4
308IDF A4
309IDF A4
310IDF A4
312IDF A4
313IDF A4
314IDF A4
315IDF A4
316IDF A4
317IDF A4
318IDF A4
318 (IDF)IDF A4Run 4 Drops into the Data Cabinet)
319IDF A4
320IDF A4
321IDF A4
322IDF A4
331IDF A4
401IDF D4
402IDF D4
403IDF D4
404IDF D4
405IDF D4
406IDF D4
407IDF D4
408IDF D4
410IDF D4
411IDF D4
412IDF D4
413IDF D4
414IDF D4
415IDF D4
416IDF D4
417IDF D4
418IDF D4
419IDF D4
501IDF E4
508IDF E4
507IDF E4
506IDF E4
505IDF E4
509IDF E4
510IDF E4
511IDF E4
512IDF E4
513IDF E4
514IDF E4
515IDF E4
Appendix C; Specific Copper Data Drops76
CafeteriaIDF D122@AP, 2@AP, 8@Cafe Registers
Cafe OfficeIDF D44 In office
Custodian OfficeIDF D22 In office
TheatreIDF B31 each side of stage plus on wall
MAIN GYMIDF E42@AP, 2@AP (Each Corner)
Lower GYMIDF E22@AP
Weight RoomIDF E22@AP
Weight RoomIDF E22 Near door
Boys Locker RoomIDF E62 at each desk
Girls Locker RoomIDF E62 at Each desk
PoolIDF E32@AP 1@DESK
OfficeIDF A42@AP, 2 to DeskPC Reception
NurseIDF A22@AP
325MDF A22 @ AP
116IDF C22@AP
117IDF C22@AP
115IDF C22@AP
323MDF A8Building Tech Office
Guidance Office42 In celing, 2 in wall for outside AP
Pool Pump Room22 at Pool Pump Controller
Library22@AP

File details come from the government source that posted it. Updated .